Chapter-7 fire protection and fire safety requirements
Download 106.32 Kb. Pdf ko'rish
|
FIRE PROTECTION AND FIRE SAFETY
Model Building-Bye-laws
115 Chapter-7 Fire Protection and Fire Safety Requirements 13) Any other alteration /modification required while erection of the equipment will be made by the Owner / builder at site as per requirement. 14) Adequate arrangement for fixing chain pulley block above the fixing be available for load of 15 tons. 15) Provision shall be kept for the sumps so as to accommodate complete volume of transformer oil, which can spillover in the event of explosion of the transformer in the basement of the building. Sufficient arrangement should exist to avoid fire in the sub-station building from spread of the oil from the sumps. 16) Arrangement should be made for the provision of fire retardent cables so as to avoid chances of spread of fire in the sub-station building. 17) Sufficient pumping arrangement should exist for pumping the water out, in case of fire so as to ensure minimum loss to the switchgear and transformer. 18) No combustible material should be stacked inside the substation premises or in the vicinity to avoid chances of fire. 19) It should be made mandatory that the promoters of the multi-storeyed building should get substation premises inspected once a year to get their license revalidated for the provision of electric supply from Electricity Board so that suitable action can be taken against the Owner / Builder in case of non- implementation of Bye-Laws. 20) The sub-station must not be located below the 1 st basement and above the ground floor. 21) The sub station space should be totally segregated from the other areas of the basement by fire resisting wall. The ramp should have a slope of 1 : 10 with entry from ground level. The entire Sub-station space including the entrance at ground floor be handed over to the licensee of electricity free of cost and rent. 22) The sub-station area shall have a clear height of 12 feet (3.65 m.) below beams. Further the Sub-station area will have level above the rest of basement level by 2 feet. 23) It is to be ensured that the Sub-station area is free of seepage / leakage of water. Download 106.32 Kb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling