Detail of department programs


Download 5.49 Mb.
Pdf ko'rish
bet13/55
Sana26.01.2018
Hajmi5.49 Mb.
#25349
1   ...   9   10   11   12   13   14   15   16   ...   55

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

Apportionment of Changes Applicable to Various Programs

1,857,448

(2)

2,357,907



Related costs consist of employee benefits.

Related Costs: $500,459

SG: $1,857,448

563


Bureau of Sanitation

Clean Water

Increased Services

24. Hyperion Water Reclamation Plant Painting Crew

239,337

4

362,043



Add nine-months funding and regular authority for one Senior

Painter and three Painters to apply high-performance coatings

and applications on equipment, infrastructure, and assets at

the Hyperion Water Reclamation Plant.  These coatings will

extend the useful life of the assets by protecting them from

rust, corrosion, and damaging elements.  Funding is provided

by the Sewer Construction and Maintenance Fund.  Related

costs consist of employee benefits.



SG: $239,337

Related Costs: $122,706

25. Hyperion Water Reclamation Plant Custodial Staffing

99,958

3

169,190



Add nine-months funding and regular authority for one Senior

Custodian I and two Custodians to maintain and service 60

restrooms and 20 shower/locker rooms and service 145,700

square feet of flooring in 29 buildings at the Hyperion Water

Reclamation Plant.  Funding is provided by the Sewer

Construction and Maintenance Fund.  Related costs consist of

employee benefits.

SG: $99,958

Related Costs: $69,232

26. Hyperion Water Reclamation Plant Pipefitters

204,501

3

303,695



Add nine-months funding and regular authority for three

Pipefitters to install, repair, and maintain the industrial piping

systems at the Hyperion Water Reclamation Plant.  These

positions are also required to perform preventative

maintenance on the facility's piping systems and to address a

backlog of over 1,000 work orders.  Funding is provided by the

Sewer Construction and Maintenance Fund.  Related costs

consist of employee benefits.



SG: $204,501

Related Costs: $99,194

27. Hyperion Corrosion Control Program

71,838

1

105,955



Add nine-months funding and regular authority for one

Environmental Engineering Associate II, subject to pay grade

determination by the Office of the City Administrative Officer,

Employee Relations Division, to support the Corrosion Control

Program at the Hyperion Water Reclamation Plant.  This

position will prepare engineering studies and conduct

investigations to mitigate equipment failure due to corrosion

issues and implement improvements to reduce corrosion.

Funding is provided by the Sewer Construction and

Maintenance Fund.  Related costs consist of employee

benefits.

SG: $71,838

Related Costs: $34,117

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

564


Bureau of Sanitation

Clean Water

Increased Services

28. Donald C. Tillman Preventative Maintenance Staffing

74,774

1

109,732



Add nine-months funding and regular authority for one

Instrument Mechanic to perform preventative maintenance and

address a backlog of work orders at the Donald C. Tillman

Water Reclamation Plant.  This position inspects, cleans,

calibrates, maintains, and repairs instruments that control the

wastewater treatment process.  Funding is provided by the

Sewer Construction and Maintenance Fund.  Related costs

consist of employee benefits.



SG: $74,774

Related Costs: $34,958

29. Donald C. Tillman Water Reclamation Plant Pipefitter

68,167

1

101,232



Add nine-months funding and regular authority for one

Pipefitter to install, repair, and maintain the industrial piping

systems at the Donald C. Tillman Water Reclamation Plant.

Funding is provided by the Sewer Construction and

Maintenance Fund.  Related costs consist of employee

benefits.



SG: $68,167

Related Costs: $33,065

30. Los Angeles-Glendale Water Reclamation Plant Painter

59,702

1

90,341



Add nine-months funding and regular authority for one Painter

to apply high performance protective coatings on equipment,

assets, and the piping systems at the Los Angeles-Glendale

Water Reclamation Plant.  Funding is provided by the Sewer

Construction and Maintenance Fund.  Related costs consist of

employee benefits.



SG: $59,702

Related Costs: $30,639

31. Hyperion Water Reclamation Plant Safety Program

160,207

2

233,178



Add nine-months funding and regular authority for one

Environmental Engineer and one Environmental Engineering

Associate II to implement a comprehensive safety program at

the Hyperion Water Reclamation Plant.  Funding is provided by

the Sewer Construction and Maintenance Fund.  Related costs

consist of employee benefits.



SG: $160,207

Related Costs: $72,971

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

565


Bureau of Sanitation

Clean Water

New Services

32. Dental Facilities Program

131,637

2

196,420



Add nine-months funding and regular authority for one

Environmental Compliance Inspector and one Environmental

Engineering Associate II, subject to pay grade determination by

the Office of the City Administrative Officer, Employee

Relations Division, to administer the Industrial Waste

Management Division's Dental Facilities Program.  Effective

December 2016, the Environmental Protection Agency issued

new regulations that require all dental facilities to install an

Amalgam Separator (which removes amalgam particles, which

are used for dental fillings for cavities, from the wastewater)

and for inspections to be conducted on an annual basis.

These positions will perform the annual inspections and issue

new dental permits and administer the existing 1,800 dental

permits.  Funding is provided by the Sewer Construction and

Maintenance Fund.  Related costs consist of employee

benefits.



SG: $131,637

Related Costs: $64,783

33. Instrumental Chemistry Staffing

64,769

1

96,860



Add nine-months funding and regular authority for one Chemist

II assigned to the Environmental Monitoring Division's

Instrumental Chemistry Section.  To comply with new

regulations related to water reuse projects, this position will

analyze and test recycled water samples for the presence of

Contaminants of Emerging Concern and Poly Aromatic

Hydrocarbons.  Funding is provided by the Sewer Construction

and Maintenance Fund.  Related costs consist of employee

benefits.

SG: $64,769

Related Costs: $32,091

Efficiencies to Services

34. Hyperion Water Reclamation Plant Electrical Engineer

75,611

1

110,809



Add nine-months funding and regular authority for one Building

Electrical Engineer I to provide professional engineering

support to the electrical and instrumentation systems at the

Hyperion Water Reclamation Plant.  This work is currently

performed by consultants and long-term savings can be

achieved by using City staff.  Funding is provided by the Sewer

Construction and Maintenance Fund.  Related costs consist of

employee benefits.



SG: $75,611

Related Costs: $35,198

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

566


Bureau of Sanitation

Clean Water

TOTAL Clean Water

3,368,988

18

D

2016-17 Program Budget



109,610,790

1,282


Changes in Salaries, Expense, Equipment, and Special

3,368,988

18

2017-18 PROGRAM BUDGET

112,979,778

1,300

567


Bureau of Sanitation

Solid Resources

Priority Outcome: Create a more livable and sustainable city

This program includes the collection, recycling, and disposal of solid waste, green waste, and other solid

resources materials for single-family residences and small apartment complexes city-wide, and manages

contracted recycling programs for apartments and commercial and industrial businesses.  It provides for the

proper recycling and disposal of household hazardous waste via Solvent, Automotives, Flammables, and

Electronics (SAFE) Centers, bulky item pick-ups, and conducts the necessary planning and development of

long-term alternatives to landfill disposal and for clean fuel programs related to solid waste.



Continuation of Services

35. Citywide Exclusive Franchise System - Phase I

1,720,349

16

2,426,738



Continue funding and add regular authority for 16 positions to

implement the City's Exclusive Franchise System for

Commercial and Multi-Family Solid Waste Collection.  These

positions include one Sanitation Solid Resources Manager II,

one Sanitation Solid Resources Manager I, one Chief

Environmental Compliance Inspector I, one Database

Architect, one Programmer Analyst V, one Programmer

Analyst IV, one Industrial Hygienist, one Geographic

Information Systems Specialist, one Environmental Specialist

III, two Senior Management Analyst Is, four Management

Analysts, and one Senior Administrative Clerk.  These

positions were approved in 2014-15 (C.F. 14-1422) to

implement the Franchise System.  Funding is provided by the

Citywide Recycling Trust Fund.  Related costs consist of

employee benefits.

SG: $1,720,349

Related Costs: $706,389

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

Apportionment of Changes Applicable to Various Programs

(7,578,081)

(1)

(10,266,216)



Related costs consist of employee benefits.

Related Costs: ($2,688,135)

SG: ($5,155,774) SAN: ($1,870,000) SOT: ($21,796)

EX: ($530,511)

568


Bureau of Sanitation

Solid Resources

Continuation of Services

36. Citywide Exclusive Franchise System - Phase II

3,415,285

-

4,881,114



Continue funding and resolution authority for 36 positions to

implement the City's Exclusive Franchise System for

Commercial and Multi-Family Solid Waste Collection.  These

positions include two Sanitation Solid Resources Manager Is,

six Senior Environmental Compliance Inspectors, 12

Environmental Compliance Inspectors, one Environmental

Engineer, one Environmental Engineering Associate III, one

Systems Programmer II, one Programmer Analyst III, one

Geographic Information Systems Specialist, two Senior

Management Analyst Is, one Management Analyst, two

Environmental Specialist IIs, two Environmental Specialist IIIs,

two Senior Administrative Clerks, one Accounting Clerk, and

one Secretary.  These positions were approved in 2015-16

(C.F. 15-0600) to develop the infrastructure, systems, and

protocols for inspections, zero waste compliance, and

customer service programs for the Franchise System.  Funding

is provided by the Citywide Recycling Trust Fund.  Related

costs consist of employee benefits.



SG: $3,415,285

Related Costs: $1,465,829

37. Citywide Exclusive Franchise System - Phase III

3,935,741

-

4,630,502



Continue funding and resolution authority for 19 positions to

implement the City's Exclusive Franchise System for

Commercial and Multi-Family Solid Waste Collection.  These

positions include 12 Environmental Compliance Inspectors,

one Management Analyst, one Environmental Specialist II, one

Senior Auditor, two Senior Administrative Clerks, and two

Administrative Clerks.  In addition, continue one-time funding in

the As-Needed Salaries ($1,870,000) and Overtime General

($21,976) accounts to employ 85 as-needed customer service

representatives to address the increased workload during the

transition period from private hauler to franchise hauler, and

one-time funding in the Printing and Binding ($98,500),

Contractual Services ($209,467), Transportation ($94,000),

Uniforms ($15,000), Office and Administrative Expenses

($21,800), and Operating Supplies ($77,683) accounts for

office supplies and equipment and to reimburse field inspectors

for mileage.  Funding is provided by the Citywide Recycling

Trust Fund.  Related costs consist of employee benefits.



SG: $1,527,315

SAN: $1,870,000

SOT: $21,976

Related Costs: $694,761

EX: $516,450

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

569


Bureau of Sanitation

Solid Resources

Continuation of Services

38. Non-Curbside Recycling Program Support

100,444

-

142,759



Continue funding and resolution authority for one

Environmental Engineering Associate II to manage the Used

Oil Program.  This program includes compliance with State

requirements and used oil grants and inspection as well as

monitoring and technical assistance to over 200 State-certified

used oil collection centers.  Funding is provided by the Used

Oil Collection Fund.  Related costs consist of employee

benefits.



SG: $100,444

Related Costs: $42,315

39. Los Angeles International Airport Recycling Program

144,243

-

212,639



Continue funding and resolution authority for two Refuse

Collection Truck Operator IIs to provide recyclables collection

services to the Los Angeles International Airport.  This service

was previously performed by private haulers.  Front-funding is

provided by the Solid Waste Resources Revenue Fund and all

costs are fully reimbursable by the Los Angeles International

Airport.  Related costs consist of employee benefits.

SG: $144,243

Related Costs: $68,396

40. Multi-Family Bulky Item Program - Phase II

470,178

-

699,627



Continue funding and resolution authority for five Refuse

Collection Truck Operator IIs and two Communications

Information Representative IIs to implement the bulky item

pickup program for approximately 140,000 condominiums and

townhouses within the City.  Phase I was implemented in 2007

(C.F. 04-0881-S1) to provide bulky item collection and disposal

services to apartments and multi-family residences of five or

more units.  Funding is provided by the Multi-Family Bulky Item

Fund.  Related costs consist of employee benefits.

SG: $470,178

Related Costs: $229,449

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

570


Bureau of Sanitation

Solid Resources

Continuation of Services

41. Call Center Supervision

139,857

2

206,996



Continue funding and add regular authority for one Principal

Clerk and one Senior Administrative Clerk to provide additional

supervision within the Bureau's Call Center.  These positions

were approved by Council in the 2016-17 Budget (C.F.

16-0600) as one Principal Communications Operator and one

Senior Communications Operator I.  Subsequently, it was

determined that one Principal Clerk and one Senior

Administrative Clerk were the more appropriate classifications

to meet the Bureau's operational needs.  Funding is provided

by the Solid Waste Resources Revenue Fund.  Related costs

consist of employee benefits.

SG: $139,857

Related Costs: $67,139

42. Solid Waste Integrated Resources Plan

446,329

-

628,359



Continue funding and resolution authority for one Senior

Environmental Engineer and three Environmental Engineering

Associate IIs for the Solid Waste Integrated Resources Plan

(SWIRP).  The SWIRP is a master plan that addresses the

infrastructure and financial needs to achieve a zero waste goal

by 2025.  Two vacant resolution authority positions are not

continued.  Funding for one Senior Environmental Engineer

and one Environmental Engineering Associate II is provided by

the Solid Waste Resources Revenue Fund and funding for two

Environmental Engineering Associate IIs is provided by the

Citywide Recycling Trust Fund.  Related costs consist of

employee benefits.



SG: $446,329

Related Costs: $182,030

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

571


Bureau of Sanitation

Solid Resources

Increased Services

43. Call Center Staffing Resources

419,208

9

661,105



Add nine-months funding and regular authority for nine

positions consisting of five Communications Information

Representative IIs, three Senior Administrative Clerks, and one

Management Analyst.  These positions are required to provide

additional supervision consistent with industry standards,

reduce the backlog of 6,000 work orders, and reduce customer

wait times.  Funding for one Senior Administrative Clerk is

provided by the Citywide Recycling Trust Fund ($48,774) and

funding for the remaining eight positions is provided by the

Solid Waste Resources Revenue Fund ($370,434).  Related

costs consist of employee benefits.

SG: $419,208

Related Costs: $241,897

44. Solid Resources Occupational Safety Program

73,262

1

107,787



Add nine-months funding and regular authority for one Safety

Engineer to ensure that Solid Resources facilities and

operations are in compliance with occupational safety laws and

regulations.  This position will inspect Solid Resources facilities

and equipment and identify and correct hazardous work

conditions and unsafe work practices.  Funding is provided by

the Solid Waste Resources Revenue Fund.  Related costs

consist of employee benefits.



SG: $73,262

Related Costs: $34,525

45. Curbside Collection Operations Support

521,688

13

847,068



Add nine-months funding and regular authority for 13

Maintenance Laborers to support the curbside collection

program.  These positions will work alongside existing Refuse

Collection Truck Operators to pull dumpsters and bins into the

street for automated collection services.  These positions are

required to address the increasing number of customers

converting from 60 or 90 gallon bins to six cubic-yard

dumpsters and operational challenges from providing

automated collection services.  Funding is provided by the

Solid Waste Resources Revenue Fund.  Related costs consist

of employee benefits.

SG: $521,688

Related Costs: $325,380

Program Changes

Direct Cost

Positions

Total Cost

Changes in Salaries, Expense, Equipment, and Special

TOTAL Solid Resources

3,808,503

40

D

2016-17 Program Budget



112,682,541

1,250


Changes in Salaries, Expense, Equipment, and Special

3,808,503

40

2017-18 PROGRAM BUDGET

116,491,044

1,290

572


Bureau of Sanitation

Environmental Quality

Priority Outcome: Create a more livable and sustainable city

This program addresses emerging and existing environmental quality activities and programs that intersect

with the Bureau's other core budgetary programs.  This program includes the Bureau's Climate Change, Clean

Streets Initiative, Clean Up Green Up, and Operation Healthy Street programs for the Skid Row and Venice

areas.  The General Fund is the major funding source for this program as this work has general citywide

benefits and is not an eligible expenditure for the Bureau's various special funds.


Download 5.49 Mb.

Do'stlaringiz bilan baham:
1   ...   9   10   11   12   13   14   15   16   ...   55




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling