Development: The structured process of comparing, modifying, selecting, and optimizing through analyses, demonstrations, inspections, and/or tests, to meet a requirement


Table 4.3.1 Analytical Models to be Provided to GM to Support the Virtual Assessments


Download 154.5 Kb.
bet9/10
Sana28.12.2022
Hajmi154.5 Kb.
#1020411
1   2   3   4   5   6   7   8   9   10
Bog'liq
cg1397 Suspension SOR AppG2 GEM FRT Strut

Table 4.3.1 Analytical Models to be Provided to GM to Support the Virtual Assessments



Description of Analytical Models to be Provided to GM

Provide 2 weeks after the Synchronization Point (below) for the specific Virtual Assessment

Synch. VVA-ASSI

Synch. VVA-DSI

Synch. VVA-VPI

Synch. VVA-DSO

Synch. VSVA

Synch. VIVA

Synch. VPVA

Front Strut::






















FE Model used in assessing Stiffness (Mount Rates) in ABAQUS format that includes material cards and boundary conditions.

X

X

X

X

X

X

X

FE Model used in assessing Durability in Optistruct/ABAQUS format that includes material cards and boundary conditions.

X

X

X

X

X

X

X

FE Model used in assessing Permanent Set/Plastic Strain in ABAQUS format that includes material cards and boundary conditions.

X

X

X

X

X

X

X



























Table 4.3.2 Analytical Deliverables (Results) to be Supplied to GM to Support the Virtual Assessments









Provide for Indicated Virtual Assessments

Description of Analytical Deliverable (Results) to be Provided

Technical Requirement Number (e.g. SSTS 3.3.6.4.4)

Units (e.g. Hz)

VVA-ASSI

VVA-DSI

VVA-VPI

VVA-DSO

VSVA

VIVA

VPVA

Front Strut:




























Stiffness (Mount Rates)

SSTS 3.2.1.1

N/mm

X

X

X

X

X

X

X







Damage or Life




X

X

X

X

X

X

Durability Analysis-Dynamic Loads

SSTS 3.2.1.5

Damage or Life




X

X

X

X

X

X

Durability Analysis- Strength & Permanent Set

SSTS 3.2.1.5

mm and % Plastic Strain




X

X

X

X

X

X































Further details on the deliverables will be provided at the CAE Kick-off Meeting.


4.4 Pre-Production Hardware Builds


No Unique Hardware Requirements.

4.5 ADV Execution Status & ADV Issue Documentation


Supplier shall meet the minimum requirements for ADV status documentation specified in Table 4.5. GM may requests status updates on a more frequent basis as required.


Table 4.5 Frequency of Status Reports vs. Type of Status Report



Description of Documentation

Required Format and/or Content

Required Frequency vs. Program Timing

Submit ADV Status Documentation to:

Prior to SVER

SVER to IV GA MRD

IV GA MRD to VTC

After VTC

Informal Status Reports

Voice mail or E-mail

Weekly

Weekly

Weekly

Weekly

GM Validation Engineer

ADV Execution Status Report

GM 1829

Monthly

Monthly

Monthly, then within 30 days of VTC, weekly

Weekly

GM Validation Engineer

ADV Issue Report

GMW3600, Section 4.5.3

within 24 Hours of incident

GM Validation Engineer

Status Report on Supplier's ADV Issues

GMW3600 Section 4.5.3.1.4

Monthly

Monthly

Weekly

Weekly or Daily as required

GM Validation Engineer

Evaluation Reports

GMW3600 Section 4.2.3.7

14 days after test

Earliest date- 14 days after test or 4 weeks prior to IV-MRD

14 days after test

Earliest date- 14 days after test or 4 weeks prior to VDC

GM Validation Engineer to review



4.6 Post Validation Audit- PVA (reference GMW3600 and GMW15758)
a. The GM SVE reserves the right to initiate a Post Validation Audit (PVA) including but not limited to the following conditions:
i. PVA shall be performed on selected components by using agreed upon validation procedures where the test results are very sensitive to manufacturing variation.
ii. Did not follow sample selection per GMW15760, where feasible.
iii. PVA shall be performed on a component that was marginal based on the learning rom past programs and/or during PV testing to meet Reliability and/or Performance requirements An example of a marginal result is a B1 life between 1 and 1.2 lives on fatigue test, then PVA testing is required.
iv. PVA shall be performed when NEW issues discovered during validation or confirmation testing at any build phase due to manufacturing process variation.
v. PVA shall be performed when noted in the VCRI driven by historical issues
b. The PVA Exit phase criteria, sample size, frequency and duration to be established by the SVE. Validation TIE, and GSSLT.
c. The sample selection must follow GMW15760 Multi-Vari Sample Selection Procedure for Product Validation.
d. The cost associated with PVA testing is the supplier’s responsibility.

e. If a requirement is not met during PVA testing, a PRTS or PRR shall be written

4.7 Regulatory Compliance Self-Certification Requirements


The Supplier shall complete their portion of the GM Self-Certification Compliance Summary Document(s) for the commodity as described by GMW3600, Sections 4.7.2 and 4.7.5, by 4 weeks prior to the VDC milestone.

The Supplier shall obtain the required Component and Subsystem Approvals for the commodity as described in GMW3600, Sections 4.7.3, 4.7.4 and 4.7.6, by 4 weeks prior to the VDC milestone.


Note: i. Regulatory compliance evaluation reports and documentation shall be complete and submitted to the Validation Engineer 4 weeks prior to the VDC milestone for any new model program.
ii. Regulatory compliance evaluation reports and documentation shall be complete and submitted to the Validation Engineer 10 weeks prior to the VDC milestone for any carry over model program.


5COMMODITY VALIDATION SIGN-OFF


In addition to the Commodity Validation Sign-off requirements specified in GMW3600 Section 5.4, the Supplier shall comply with the addition requirements listed below.
No additional sign-off requirements.

6ADV & BUILD STAGE TERMINOLOGY

6.1General ADV Terminology


    1. General Motors terminology pertaining to analysis, development and validation is defined in GMW15758 ‘ADV Process Development and Validation Terminology’ and in GMW3600 Section 6.



6.2Acronyms, Abbreviations and Symbols.


CAE:

Computer Aided Engineering