Электр хавфсизлиги


CHAPTER 5. ELECTRICAL EQUIPMENT OF POWER PLANTS AND


Download 4.25 Mb.
Pdf ko'rish
bet161/163
Sana06.11.2023
Hajmi4.25 Mb.
#1751132
1   ...   155   156   157   158   159   160   161   162   163
Bog'liq
Электр хавфсизлиги асослари фанидан ДАРСЛИК

CHAPTER 5. ELECTRICAL EQUIPMENT OF POWER PLANTS AND 
SUBSTATIONS. ORGANIZATIONAL EVENTS IN THE 
PERFORMANCE OF WORKS ON CABLE ELECTRIC NETWORKS. 
APPOINTMENT OF THE HEAD OF WORKS 
5.1. Appointment of the head when performing work on the electrical 
equipment of power plants and substations, and cable electrical networks ….. 69 
5.2. Performance of work one at a time along at several workplaces of 
substations, connections ……………..……………………………………… 
69 
5.3. Aerial and cable electrical transmission lines of distribution electrical 
installations. Work in the areas of dispatching and technological control 
facilities …………………………………………….………………………… 72 
5.4. Disposal work on electrical devices of stations and substations and cable 
electric networks ……………………………………………………………… 74 
5.5. Cable lines. Excavation work …………………………………………… 76 
5.6. Installation and strengthening of cable couplings in the structure. 
Coupling opening and cable cutting ………………………………………… 78 
5.7. Work with coupling connection. Cable management. Laying cables and 
sleeves in a different place ……………………………………………………. 80 
5.8. Work on underground structures ………….…………………………….. 81 


281 
CHAPTER 6. ORGANIZATIONAL EVENTS FOR PERFORMANCE OF 
WORKS ON ELECTRIC TRANSMISSION AIR LINES. APPOINTMENT 
OF THE HEAD OF WORKS. WORKS ON THE BRACKETS OF AIR 
ELECTRIC LINES 
6.1. Appointment of a work manager when performing work on overhead 
power lines and performing work on an order on overhead power lines ……. 85 
6.2. Work performed alongside on multi-chain overhead power lines, the 
intersection of overhead power lines, various sections of overhead power lines 86 
6.3. Work on the supports of overhead electric lines ……………..………… 
88 
6.4. Work under voltage on overhead electric lines ……………………….… 91 
6.5. Performance of work on phases of overhead power lines and on one 
disconnected multi-chain circuit of overhead power lines, on overhead power 
lines operating under voltage, between the intersection supports of the 
networks of operating lines ………………………………………………….. 94 
6.6. Cleaning the route of overhead electric lines from trees ……………..…. 99 
6.7. Inspection and verification of overhead electrical lines ………..………. 100 
6.8. Works at intersections and nearby road lines of overhead electric 
transmission lines and various works on overhead lines …………………….. 101 
6.9. Work on street lighting networks ………………….……………………. 102 

Download 4.25 Mb.

Do'stlaringiz bilan baham:
1   ...   155   156   157   158   159   160   161   162   163




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling