10.3 Label these diagrams
A) 1. Guardrail 2. Planking 3. Ladder 4. Brace 5. Base plate.
B) 1. Jack 2. Base plate 3. Mudsills 4. Nails.
C) 1. Locking pin 2. Coupling pin.
10.4 Write instructions for erecting scaffolding. Use the words in the box.
Fill in the holes and level the area. Nail the jack base plates to the mudsills. Slide the frames onto the jacks. Adjust the jacks. Use coupling pins and locking pins to join the frames. Attach the braces. Fit the planking. Attach the guardrails. Attach the ladder. Inspect the scaffolding.
10.5 Label these diagrams wit h the correct prepositions.
The toolbox on the truck
The toolbox under the truck
The toolbox in the truck
The toolbox in the between of the truck
Toolbox in front of the truck
The toolbox on the behind of the truck
The toolbox next of the truck
10.6 Complete this text with the words in the box.
The Institute of Masonry is in the centre of town, in between a factory and an office block. It has 28 apprentice's and three instructors. All the work is supervised and includes on the job training, instruction on the use of modern equipment, tools and materials, and instruction on health and safety. The training takes three years to complete. At the end of the course, apprentices get the Level 2 Diploma in Stone Masonry qualification.
Delivery
Match sentences 1-4 to illustrations A-D. Then put sentences 1-4 in the correct order for unloading the crates.
He's crate parking the truck on the hard standing.
He's hard standing unloading the crates.
He's sling hook adjusting the stabiliser
He's attaching stabiliser the slings to the hook.
Do'stlaringiz bilan baham: |