The Township of East Brunswick was established in 1860. Since January 1, 1965, the


Download 8.87 Mb.
Pdf ko'rish
bet45/115
Sana05.08.2017
Hajmi8.87 Mb.
#12784
1   ...   41   42   43   44   45   46   47   48   ...   115

& 132-53

LAND USE PROCEDURES

& 132-53

The  approving  authority  shall,  for  the  purposes  of  section  41  of  P.L.1975,  c.291

(C.40:55D-53), accept a performance guarantee or maintenance guarantee which

is an irrevocable letter of credit if it:

1

Constitutes an unconditional payment obligation of the issuer running solely



to  the  municipality  for  an  express  initial  period  of  time  in  the  amount

determined pursuant to section 41 of P.L.1975, c.291 (C.40:55D-53);

2.

Is  issued  by  a  banking  or  savings  institution  authorized  to  do  and  doing



business in this State with an AA rating; [Amended 5-10-93 by Ord. No. 93-

21]


3.

Is for a period of time of at least one year; and

4.

Permits  the  municipality  to  draw  upon  the  letter  of  credit  by  certifying



abandonment  (default)  of  the  project  by  passing  of  a  resolution  of  the

governing body or if the obligor fails to furnish another letter of credit which

complies with the provisions of this section 30 days or more in advance of

the expiration date of the letter of credit or such longer period in advance

thereof as is stated in the letter of credit.  [Amended 5-10-93 by Ord. No. 93-

21]


The performance guarantees shall be approved by the Municipal Attorney as to form,

sufficiency and execution.  The letter of credit shall be approved by the Township

Finance Officer.  [Added 5-10-93 by Ord. No. 93-21]

C.

Uncompleted and unsatisfactory improvements;  public hearing.  [Amended 5-10-93



by Ord. No. 93-21]

Upon substantial completion of all required street improvements (except for the top

course)  and  appurtenant  utility improvements,  and the  connection  of  same  to  the

public  system,  the  obligor  may request  the  governing  body  in  writing,  by  certified

m ail,  in  care  of  the  Municipal  Clerk,  that  the  Municipal  Engineer  prepare,  in

accordance with the itemized cost estimate prepared by the municipal engineer and

appended to the performance guarantee pursuant to subsection A. of this section,

a list of all uncompleted or unsatisfactory completed improvements.  If such a request

is made, the obligor shall send a copy thereof to the Municipal Engineer.  Thereupon

the  Municipal  Engineer  shall  inspect  all  improvements  covered  by  the  obligor's

request and shall file a detailed list and report, in writing, with the governing body,

and shall simultaneously send a copy thereof to the obligor not later than 45 days

after receipt of the obligor's request.

The list prepared by the Municipal Engineer shall state, in detail, with respect to each

improvement determined to be incomplete or unsatisfactory, the nature and extent

of the incompleteness of each incomplete improvement or the nature and extent of,



and remedy for, the unsatisfactory state of each completed improvement determined

to be unsatisfactory.  The report prepared by the Municipal Engineer shall identify

each  improvement  determined  to  be  completed  and  satisfactory  together  with  a

recommendation  as  to  the  amount  of  reduction  to  be  made  in  the  performance

guarantee relating to the completed and satisfactory improvement, in accordance

with the itemized cost estimate prepared by the Municipal Engineer

13269

5-93


& 132-53

EAST BRUNSWICK CODE

& 132-53

and appended to the performance guarantee pursuant to subsection A. of this chapter.  The

Municipal Engineer shall schedule a public hearing, to be held at 8:00 p.m. on a weekday. 

The Municipal Engineer shall inform the Council and the obligor or use developer of the date

of the hearing and the obligor or use developer shall be required to provide notice of at least

fifteen (15) days by certified mail, return receipt requested, to all owners of land within the

subdivision that there will be a public hearing concerning the public improvements covered

by the performance guarantee.  The notice will specify whether the obligor or use developer

seeks to release or reduce the performance guarantees.  The obligor or use developer shall

cause  to  be  published  a notice  of  the  public  hearing in a  newspaper  circulated  within  the

Township of East Brunswick, said publication to be at least ten (10) days prior to the date of

the proposed hearing.  The hearing shall be conducted by the Township Engineer and/or a

representative  of  the  Division  of  Construction  Inspection.    A  Council  representative  shall

attend the hearing.  The obligor or use developer and its engineer are required to be present. 

At the hearing, members of the public shall be afforded the right to speak with regard to the

public improvements.  A list of concerns expressed by the homeowners shall be made part

of a punch list to be included in a detailed report which the Municipal Engineer shall file, in

writing, with the governing body.  Verbatim minutes or an audio tape of the hearing shall be

forwarded  to  the  governing  body.    Following  the  inspection  of  the  improvements  by  the

Municipal  Engineer  and  the  public  hearing,  the  engineer  will  include  in  his  report  to  the

governing body a recommendation indicating either approval, partial approval or rejection of

such  improvements  with  a  statement  of  reasons  for  any  rejection.    The  cost  of  the

improvements as approved or rejected shall be set forth by the Municipal Engineer.  Included

within the report will be a synopsis of the public hearing.

The governing body shall notify the obligor or use developer of the date it will consider the

matter  and  the  obligor  or  use  developer  will  give  at  least  10  days  notice  of  the  Council

meeting to all owners of land within the subdivision.

The governing body, by resolution, shall either approve the improvements determined to be

com plete  and  satisfactory  by  the  Municipal  Engineer,  or  reject  any  or  all  of  these

improvements  upon  the  establishment  in  the  resolution  of  cause  for  rejection,  and  shall

approve and authorize the amount of reduction to be made in the performance guarantee

relating  to  the  improvements  accepted,  in  accordance  with  the  itemized  cost  estimate

prepared by the Municipal Engineer and appended to the performance guarantee pursuant

to this chapter.  This resolution shall be adopted not later than 45 days after receipt of the list

and  report  prepared  by  the  Municipal  Engineer.    Upon  adoption  of  the  resolution  by  the

governing body, the obligor or use developer shall be released from all liability pursuant to

its perform ance guarantee, with respect to those approved improvements, except for that

portion sufficient to secure completion or correction of the improvements not yet approved;

provided that thirty (30%) per cent of the amount of the performance guarantee posted may

be retained to ensure completion and acceptability of all improvements.  The governing body

may  retain  an  amount  not  to  exceed  one  hundred  twenty  (120% )  per  cent  of  the  cost  of

installation for improvements it may deem necessary or appropriate.



If  the  Municipal  Engineer  fails  to  send  or  provide  the  list  and  report  as  requested  by  the

obligor pursuant to this chapter within 45 days from receipt of the request, the obligor may

apply to the court in a summary manner for an order compelling the Municipal Engineer to

provide the list and report within a stated time and the cost of applying to the court, including

reasonable attorney's fee, may be awarded to the prevailing party.

13270


5-93

& 132-53

LAND USE PROCEDURES

& 132-53

If the governing body fails to approve or reject the improvements determined by the Municipal

Engineer  to  be  complete  and  satisfactory  or  reduce  the  performance  guarantee  for  the

complete  and  satisfactory  improvements  within  45  days  from  the  receipt  of  the  Municipal

Engineer's list and report, the obligor may apply to the court in a summary manner for an

order  com pelling,  within  a  stated  time,  approval  of  the  complete  and  satisfactory

improvements  in  accordance  with  the  itemized  cost  estimate  prepared  by  the  Municipal

Engineer  and  appended  to  the  performance  guarantee  pursuant  to  subsection  A.  of  this

section;  and the cost of applying to the court, including reasonable attorney's fees, may be

awarded to the prevailing party.

In  the  event  that  the  obligor  has  made  a  cash  deposit  with  the  municipality  or  approving

authority  as  part  of  the  performance  guarantee,  then  any  partial  reduction  granted  in  the

performance guarantee pursuant to this subsection shall be applied to the cash deposit in the

same proportion as  the  original  cash  deposit  bears  to  the  full  amount  of the  performance

guarantee.

If any portion of the required improvements is rejected, the governing body may require the

obligor or use developer to complete or correct such improvements and, upon completion or

correction, the same procedure of notification, as set forth in this Section, shall be followed.

Reduction of a bond or security, no lower than twenty (20% ) per cent of its initial value, can

be accomplished by resolution of the Township Council without public hearing or notice, upon

certification of the Township Engineer and the Division of Construction Inspection that the

improvements for which reduction is requested have been completed.  No reduction in the

amount of any bond shall be granted despite the installation of any improvements, unless the

amount to which the bond is to be reduced shall be not less than one hundred twenty (120% )

per cent of the cost at that time of installing all remaining improvements for which the bond

was originally posted.

D.

Escrow agreement;  obligor liable.



The cash security referred to above shall be held by the municipality in accordance

with  an  escrow  agreement  between  the  obligor  and  the  township,  which  shall  be

executed and submitted with the applicant's request for final approval.  Among other

things, the escrow agreement shall provide for the use of the funds by the township,

after thirty (30) days' written notice, where the obligor has failed to construct or install

the improvements in accordance with all the rules, regulations, specifications and

ordinances of the township or within the period provided for by the Planning Board,

but the use or failure to use the cash security referred to above shall in no way affect

or alter the obligation on the performance or maintenance bonds required under this

subsection.    If  the  required  improvements  are  not  completed  or  corrected  in

accordance with the performance guarantee, the obligor and surety, if any, shall be

liable thereon to the municipality for the reasonable cost of the improvements not

completed or corrected and the municipality may either prior to or after the receipt


of the proceeds thereof complete such improvements.  Such completion or correction

of improvements shall be subject to the public bidding  requirements of the "Local

Public Contracts Law," P.L.1971, c.198 (C.40A:11-1 et seq.).  Reasonable cost shall

include  costs  the  Township  incurs  to  force  performance  under  the  performance

guarantee.  The cash posted shall be used for this purpose and if insufficient cash

is remaining,  the  performance  bond  wording  shall  include  provisions  for  recovery

against the performance guarantee.

13271


5-93

& 132-53

EAST BRUNSWICK CODE

& 132-53

E.

Dedicated improvements.



To the extent that any of the improvements have been dedicated to the municipality

on the subdivision plat or site plan, the municipal governing body shall be deemed,

upon the release of any performance guarantee required pursuant to this chapter,

to accept dedication for public use of street or roads and any other improvements

made  thereof  according  to  site  plans  and  subdivision  plats  approved  by  the

approving authority, provided that such improvements have been inspected and have

received  final  approval  by  the  M unicipal  Engineer.    Prior  to  acceptance,  the

developer shall be responsible for all maintenance of improvements, including streets

and  roads,  street  lighting,  snow  plowing,  curbs  and  sidewalks,  waterlines,  storm

sewers and any other improvements which were installed.  Nothing contained herein

shall  relieve  the  developer  of  the  obligation  to  post  maintenance  guarantees  in

accordance with all requirements.

F.

Maintenance guarantee.



Upon completion of all the improvements in a good and workmanlike manner and in

accordance with all rules, regulations, standards, specifications and ordinances of

the  township  and  the  filing  of  as-built  drawings,  the  township  will  accept  the

improvements subject to the deposit and posting of maintenance guarantees in an

amount equal to fifteen percent (15% ) of the estimated cost of construction, which

cost shall be determined by the Municipal Engineer.  The security for maintenance

shall be held by the municipality in accordance with an escrow agreement similar to

the  escrow  agreement  referred  to  above.    Maintenance  guarantees  shall  be

approved by the Municipal Attorney as to form, sufficiency and execution, and such

guarantee shall run for a period of two (2) years.  Under no circumstances shall the

township pay or be liable for any interest on any funds deposited with the township

as a performance or maintenance guarantee. 

No maintenance bond shall be accepted for any item that has further stages of work

or which will need to be altered or reworked.

G.

Uncompleted improvements.



If, in the event of inclement weather or construction delays not occasioned by any act

of the developer, subdivider, builder, or successor, it shall be impossible to install the

required  sidewalks,  streetlighting,  surveyors'  monuments,  shade  trees  and

landscaping at the time that a certificate of occupancy is applied for, the applicant

shall furnish the Chief Construction Official with an acknowledgment executed by the

prospective home buyer setting forth the improvements or portions thereof that are

not  as  yet  installed  and  that  the  home  buyer  is  agreeable  to  taking  title  and

possession of the dwelling in that condition in reliance upon the existing performance



guarantees posted pursuant hereto and the terms and provisions of this subsection. 

Should those uncompleted improvem ents referred to above not be installed within

six  (6)  months  after  the  date  of  the  issuance  of  the  certificate  of  occupancy,  the

Township Council of the Township of East Brunswick, upon the recommendation of

the  Township  Engineer,  may  authorize,  by  resolution,  that  the  performance

guarantees posted pursuant hereto be utilized by the Township of East Brunswick

for the purpose of installing such uncompleted improvements.  [Amended 5-10-93

by Ord. No. 93-21]

13272

5-93


& 132-53

LAND USE PROCEDURES

& 132-53.1

H.

Cluster subdivision.



Prior to the granting of approval of a final plat of a cluster subdivision, the subdivider

shall  have  installed  or,  at  the  option  of  the  Planning  Board,  shall  have  furnished

performance guarantees for the ultimate installation of the following:

1.

Such  grading,  drainage,  planting,  walkways,  fencing  and  lighting  of  the



common open space as shall be deemed appropriate by the Planning Board

to enhance the intended open space uses.

2.

Such other improvements in the common open space as shall be proposed



by the subdivider and approved by the Planning Board.

3.

W here such improvements include trees, shrub or ground covers, the same



shall consist of varieties and shall be planted in accordance with standards

approved  by  the  Planning Board and on file in the office of the Township

Engineer.

& 132-53.1.

Deposits Required to Offset Costs of Inspections and Test.  [Added 11-

12-91 by Ord. No. 91-111; amended 5-10-93 by Ord. No. 93-21; 3-8-99

by Ord. No. 99-12;  4-28-03 by Ord. No. 03-15; 9-26-05 by Ord. No. 05-

29]

A.

Prior to construction of any of the improvements referred to above specifically, the



commencement of any preparatory site work,  including but not limited to clearance of the property,

grading or excavation or the signing of the final subdivision or site plan, whichever occurs first, the

developer  shall  deposit  with  the  township  a  sum  equal  to  five  percent  (5% )  of  the  cost  of  the

improvements but not more than four thousand, nine hundred and ninety-nine dollars ($4,999), which

shall be used to pay the costs of inspection and testing fees incurred by the township.  In the event

that  the  costs  of  inspection  and  testing  are  less  than  the  amount  deposited,  the  balance  shall  be

refunded to the subdivider.  If the costs are greater than the amount deposited, the township shall

require additional deposits as necessary.  The following fee schedule shall be charged:

1.

Township employees [amended 3-8-99 by Ord. No. 99-12; 4-28-03 by Ord. No. 03-



15]:

(a)


Up  to  eight  (8)  hours  in  a  single  weekday:  Seventy  five  dollars  per  hour

($75.00/Hour).

(b)

Beyond eight (8) hours in a single weekday: One hundred twelve dollars per



hour ($112.00/Hour)

(c)


Saturday: One hundred twelve dollars per hour ($112.00/Hour)

(d)


Legal  township  holiday:  one  hundred  eighty-seven  dollars  per  hour

($187.00/Hour)

Inspection  time  will  be  rounded  to  the  next  half  (½)  hour  for  billing  purposes. 

Inspections for Saturdays and holidays must be pre-approved by Assistant Township

Engineer prior to scheduling.

2.

Testing laboratory:  cost to the township.



13273

   3-06


& 132-53.1

EAST BRUNSWICK CODE

& 132-53.2

3.

Outside Consulting Services [Added 5-10-93 by Ord. No. 93-21]:



W hen the Township deems it necessary to retain outside professional services, the

developer shall reimburse the Township for all reasonable professional consulting

fees.

B.

For those subdivision and site plans for which the reasonably anticipated fees are



less than $10,000, fees may, at the option of the developer, be paid in two installments.  The initial

amount deposited by a developer shall be 50%  of the reasonably anticipated fees.  W hen the balance

on deposit drops to 10%  of the reasonably anticipated fees because the amount deposited by the

developer  has  been  reduced  by  the  amount  paid  to  the  municipal  engineer  for  inspection,  the

developer shall deposit the remaining 50% of the anticipated inspection fees.  For those developments

for  which  the  reasonably  anticipated  fees  are  $10,000  or  greater,  fees  may,  at  the  option  of  the

developer, be paid in four installments.  The initial amount deposited by a developer shall be 25%  of

the  reasonably  anticipated  fees.    W hen  the  balance  on  deposit  drops  to  10%   of  the  reasonably

anticipated fees because the amount deposited by the developer has been reduced by the amount

paid to the municipal engineer for inspection, the developer shall make additional deposits of 25% of

the reasonably anticipated fees.  The municipal engineer shall not permit any construction requiring

inspection if sufficient funds to pay for those inspections are not on deposit.

C.

Construction W ithin Township Right-of-W ay: A Right-of-W ay Permit shall be required for



all construction work located within the Township right-of-way including sidewalks, curb aprons and

curbs adjacent to roadways.  The permit fee shall be twenty-five ($25.00) dollars. [Added 9-26-05 by

Ord. No. 05-29]

& 132-53.2.

Inspections.  [Added 5-10-93 by Ord. No. 93-21;  amended 10-2-95 by

Ord. No. 95-34; 3-8-99 by Ord. No. 99-12; 7-7-08 by Ord. No. 08-12]

A.

Prior to construction, the developer shall arrange for a preconstruction conference



among the developers, contractor and Manager of Engineering Services or his/her

designee.  The Manager of Engineering Services shall be notified by certified m ail

by  the  developer  at  least  five  business  days  in  advance  of  the  planned

commencement of construction activity. [Amended 7-7-08 by Ord. No. 08-12]

B.

No work shall be done without the appropriate valid construction permit from   and



inspection  by  the  Township.    The  Manager  of  Engineering  Services  or  his/her

designee is authorized to issue a summons in the event any developer, agent, or

corporation refuses to honor a stop work notice.  No underground installation shall

be covered until inspected and approved.  The Township Department of Planning

and  Engineering  shall  be  notified  twenty-four  hours  before  each  of  the  following

phases  of  the  work  has  been  commenced  so  that  the  Township  may  inspect  the

work:  pavement subgrade;  curb and gutter forms;  curbs and gutters;  pavement

(after  each  coat,  in  the  case  of  prim ing  and  sealing);    drainage  pipes  and  other

drainage structures before backfilling;   shade trees and planting strips;  street name

signs;  and monuments.  [Amended 7-7-08 by Ord. No. 08-12]

C.

No  work  or  construction  of  improvements  requiring  same  day  inspection  by  the



township shall be performed on Saturdays, Sundays, legal township holidays or at

any  other  time  or  hours  than  those  during  which  the  East  Brunswick  Municipal

Building is open to the general public without prior approval from the Department of

Planning & Engineering.  These items of work include but are not limited to pouring

concrete, paving and pipe construction.     [Amended 3-8-99 by Ord. No. 99-12]

13274


     1-09

Download 8.87 Mb.

Do'stlaringiz bilan baham:
1   ...   41   42   43   44   45   46   47   48   ...   115




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling