The world bank monthly operational summary
(R) Rio de Janeiro Public Sector Modernization (Ln. 79550-BR)
Download 2 Mb. Pdf ko'rish
|
(R) Rio de Janeiro Public Sector Modernization (Ln. 79550-BR): The objective is to assist the government of the state in its public sec- tor modernization efforts by providing technical assistance on: (i) the design and implementation of performance management mechanisms for selected agencies; (ii) the design and implementation of institu- tional reforms; and (iii) other public sector modernization initiatives. Bank Approval completed on 26 August 2010. Signing scheduled for 26 November 2010. Environmental Assessment Category C. Project: P106768. US$ 18.7 (IBRD). No consultants are required. Secretariat of Planning and Management of the Government of Rio de Janeiro, Av. Erasmo Braga, No. 118, Centro, Rio de Janeiro, RJ, Brazil, Tel: (55-21) 2292-5100, Fax: (55-21) 2533-5979, Contact: Francisco Cal- das, Under-Secretary General for Planning and Management (R) Rio de Janeiro Urban and Housing Development: The objec- tive is to support the Partnership Program with the State Government on housing and urban development issues including Technical Assis- tance for the formulation of a housing strategy. Project Concept Re- view Meeting scheduled for 7 October 2010. Environmental Assess- ment Category U. US$ 485.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined.
São Paulo to increase the competitiveness of family agriculture in its territory while improving environmental sustainability. Signing tenta-
Category B. Project: P108443. US$ 78.0 (IBRD). Consultants will be required. Secretaria de Agricultura e Abastecimento, Avenida Miguel Stefano, 3.900, 04301-903, Sao Paulo, Brazil, Tel: (55-19) 3743- 3721/02, Fax: (55-19) 3743-3705, E-mail: brunelli@cati.sp.gov.br, Contact: Joao Brunelli Junior, Project Coordinator Transportation (R) Mato Grosso do Sul State Road Transport (Ln. 78720-BR): The objectives are to improve the efficiency of the road network with selected investments in road infrastructure and activities that seek to strengthen the State Government’s overall capacity to manage the road PAGE 74 Monthly Operational Summary OCTOBER 2010 network. The loan was signed on 16 September 2010. Environmental Assessment Category B. Project: P118410. US$ 300.0 (IBRD). Con- sultants will be required in the supervision. Agencia Estadual de Gestao de Empreendimentos de Mato Grosso do Sul, Av. Desembargador Jose Nunes da Cunha, Bloco 14, Gampo Grande, MS, Brazil, Tel: (55-67) 3318-5538, Fax: (55-67) 3318-5386, E-mail: coordenacao.pde@agesul. ms.gov.br, Contact: Juliana Pegolo, Project Coordinator (R) Sao Paulo Metro Line 4-Phase 2 (Ln. 78690-BR): The objective is to improve the quality of service provided to the urban transport users in the area of influence of the new Line 4 stations and facilitate the integration between metro and bus at those stations. Signing tenta- tively scheduled for late-September 2010. Environmental Assessment Category A. Project: P106390. US$ 130.0/130.0 (IBRD/JBIC). Con- sultants will be required. Companhia do Metropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55- 11) 3291-5494, Fax: (55-11) 3291-2890, E-mail: egranado@metrosp. com.br, Contact: Ernesto Granado, Coordinator PMU Sao Paulo Metro Line 5: The objective is to improve mobility for public transport users in the Capão Redondo-Largo Treze-Chácara Klabin corridor in a cost-efficient and environmentally friendly way. Signing tentatively scheduled for late-September 2010. Environ- mental Assessment Category A. Project: P116170. US$ 650.4/481.0 (IBRD/IADB). Consultants will be required for assessment of train and systems specifications, project management and supervision. Companhia do Metropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291-5494, Fax: (55- 11) 3291-2890, E-mail: egranado@metrosp.com.br, Contact: Ernesto Granado, Coordinator PMU
tive, same as the parent project, is to improve the efficiency of the Borrower’s paved municipal road network that is a combination of financing for the anticipated cost overrun and the scale-up of the par- ent project’s civil works component. Signing tentatively scheduled for late-September 2010. Environmental Assessment Category B. Project: P118077. US$ 326.8 (IBRD). Consultants will be required. Departamento de Estradas de rodagem do Estado de Sao Paulo (DER/ SP), Avenida do Estado 777, 3o Andar, Ponte Pequena, Sao Paulo, SP, Brazil, Tel: (5511) 3311-1401, Fax: (55-11) 3311-0973, E-mail: del- son@sp.gov.br, Contact: Delson Jose Amador, Superintendente
tive is to continue to improve the quality of service offered to SPMR. users by acquiring additional 9 trains for Line 11 of the São Paulo suburban railway (CPTM). Negotiations completed on 3 August 2010. Bank Approval scheduled for 21 September 2010. Environmental As- sessment Category B. Project: P117122. US$ 112.9 (IBRD). Consul- tants will be required for studies, project management and supervi- sion/reception of trains. Companhia Paulista de Trens Metropolitanos, Rua Boavista, 185-2 Andar BI. A, Centro Sao Paulo, Sao Paulo, SP, Brazil, Tel: (55-11) 3101-7141, E-mail: acbissoli@cptm.sp.gov.br, Contact: Afonso Bissoli, Coordinator UGP
objective is to contribute to fostering increased competitiveness of the State economy through improved road transport efficiency and enhanced public services delivery. Project Concept Review Meet- ing completed on 10 August 2010. Project preparation is underway. Environmental Assessment Category B. Project: P121495. US$ 300.0 (IBRD). Consultants will be required. Secretaria de Estado da Infraestrutura Tocantins, Esplanada das Secretarias, Praca dos Girassois,Palmas, Brazil, Tel: (55-63) 3218-1640/41, Fax: (55-63) 3218-1690, E-mail: dae@seinf.to.gov.br, Contact: Silvio Leao, Super- intendente de Apoio Estrategico
objectives are to: (i) increase access to clean water, sanitation, and ba- sic health care in at least 10 State priority municipalities most affected by IID; and (ii) improve neonatal health care in 25 selected reference hospitals using a Baremo of quality and efficiency. Negotiations com-
60.0 (IBRD). Consultants will be required. State of Bahia, Av. Luis Vi- ana Filho 400, 4o Andar, Centro Administrativo, Salvador, BA, Brazil, Tel: (55-71) 3115-3550, Fax: (55-71) 3371-3237, Contact: Jorge Jose Santos Pereira Solla, Secretario de Estado de Saude
objective is to scale-up public and private investments in municipal solid waste management treatment and disposal, while ensuring financial and technical viability and reducing environmental and social impacts. Ne- gotiations completed on 9 September 2010. Bank approval tentatively scheduled for Novemer 2010. Environmental Assessment Category F. Project: P106702. US$ 50.0 (IBRD). Consultants will be required. Caixa Economica Federal, SBS Quadra 4 Lotes 3/4, Ed. Matriz I, 11 Andar- GEAIN, Brasilia, Brazil, Tel: (55-61) 3206-4911, E-mail: gesan@caixa. gov.br, Contact: Adailton Ferreira Trindade, Gerente Nacional
able water use in targeted municipalities of the Sergipe river basin, by improving water resources management and regulatory tools, re- ducing the pollution load discharged into rivers and increasing water services productivity. Decision Meeting scheduled for 30 September
70.3 (IBRD). Consultants will required to: (a) prepare environmental and social assessments, economic and financial assessments, devel- opment of project operation manual, irrigation services assessments, utility corporate reform and non-revenue water program; and (b) im- plementation. State Secretariat of Environment and Water Resources, Sergipe, Av. Prefeito Heraclito Rollemberg, S/N, Sergipe, Brazil, Tel: (55-79) 31797300, Fax: (55-79) 3179-7302, Contact: Ailton Francisco da Rocha, Project Coordinator
objectives are to reduce regional inequalities and ensure quality of wa- ter resources in the Federal District and Brasilia Metropolitan Region through environmental planning and management activities, poverty reduction interventions and environmental rehabilitation in the most critical river basins. This project is on hold until further notice. En- vironmental Assessment Category A. US$ 57.6 (IBRD). Consulting services and implementing agency(ies) to be determined. Sao Paulo Water Recovery REAGUA: The objective is to increase water availability in the critical watersheds. Signing tentatively sched- uled for late-September 2010. Environmental Assessment Category B. Project: P106703. US$ 64.5 (IBRD). Consultants will be required for assistance to the State Secretariat of Water and Energy to man- age and verify results during implementation. Secretaria de Estado de Saneamento e Energia, Rua Bela Cintra 847, 14o Andar, Bairro Consolacao, Sao Paulo, SP, Brazil, Tel: (55-11) 3218-5500, E-mail: dilmapena@sp.gov.br, Contact: Ms. Dilma Pena, Secretaria
ficiency, renewable energy and other clean technologies that would re- duce emissions of greenhouse gases. Project Concept Review Meeting scheduled for 18 January 2011. Environmental Assessment Category B. US$ 50.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Colombia Agriculture, Fishing, and Forestry (R) National Protected Areas Additional Financing: The objective is to promote the consolidation and long-term sustainability of Colom- bia’s National Protected Areas System (NPAS) through designing and implementing a Protected Areas Conservation Trust Fund. Decision Meeting scheduled for 23 September 2010. Environmental Assessment Category B. Project: P112106. US$ 4.0 (GEFU). Consultants will be required. Patrimonio Natural, Calle 72 No. 10-70, Edificio Centro Ave- nida Chile, Torre A, Bogota, Colombia, Tel: (57-1) 211-5545, E-mail: agalan@patrimonionatural.org.co, Contact: Alberto Galan, Director
date the progress in the establishment of a diversified agricultural in- OCTOBER 2010 Monthly Operational Summary PAGE 75 nova
tion system and strengthen Colombia’s sanitary and phytosanitary systems; (b) establish novel ways for technical assistance to agriculture producers. This project is no longer in the lending program. Further
B. US$ 30.0 (IBRD). Consultants will be required. Ministry of Agri- culture, Av. Jimenez 7-65, Colombia, Tel: (57-1) 341-9005, Fax: (57- 1) 284-1775, E-mail: claudia.uribe@minagricultura.gov.co, Contact: Claudia Uribe, Coordinadora del PTA
in improving access to quality early childhood development services. Project Concept Review Meeting scheduled for 30 September 2010. Environmental Assessment Category B. US$ 40.0 (IBRD). Consul- tants will be required. Implementing agency(ies) to be determined.
the planned institutional transformation of Instituto Colombiano para el Fomento de la Educacion Superior (ICFES) from a public entity to a semi public entity; and (b) technical and institutional capacity of ICFES to analyze, monitor and report student assessments. Decision Meeting scheduled for 22 September 2010. Environmental Assess- ment Category C. Project: P106693. US$ 20.0 (IBRD). Consultants will be required. Instituto Colombiano para el Fomento de la Educa- cion Superior, Margarita Pe, Director, Colombia, Tel: (57-1) 341-228, E-mail: mpena@ices.org, Contact: Margarita Pena, Directora Public Administration, Law, and Justice Sustainable Development Additional Financing: The objective is to ensure sustained progress through technical assistance and investment in three of the four thematic areas of the original loan: (i) environmen- tal health: outdoor air quality and a hand washing campaign, (ii) inte- grated water resources management, and (iii) planning and oversight of environmental management. Decision Meeting scheduled for 27 September 2010. Environmental Assessment Category C. US$ 10.0 (IBRD). Consultants will be required. Ministry of Environment and National Planning Department, Calle 37 No. 8-40, Bogota, Colom- bia, Tel: (57-1) 332-3400, Ext. 1194, Fax: (57-1) 332-3429, E-mail: lnino@minambiente.gov.co, Contact: Lucy Amparo Nino Carrillo, Coordinadora de Banca Multilateral Transportation (R) National Urban Transport: The objectives are to: (a) deliver high quality and sustainable BRTS in selected medium and large cities to improve mobility along the most strategic mass transit corridors; (b) improve accessibility for the poor through feeder services and fare in- tegration; and (c) build greater institutional capacity at the national and local level. Project Concept Review Meeting completed on 3 September 2010. Decision Meeting scheduled for 12 October 2010. Environmen- tal Assessment Category B. US$ 350.0 (IBRD). Consultants will be required. Ministry of Transport, Av. El Dorado CAN, Colombia, Tel: (57-1) 324-0800, E-mail: mintrans@mintransporte.gov.co, Contact: Carolina Camacho, Coordinadora Sistemas Integrados de Transporte
transform the Rio Bogota from an environmental liability into an ur- ban set for the metropolitan region by improving water quality, reduc- ing flood risk, and creating a series of multi-functional parks along the river. Bank Approval scheduled for 11 November 2010. Environ- mental Assessment Category A. Project: P111479. US$ 250.0 (IBRD). Consultants will be required. Corporacion Autonoma Regional de Cundinamarca, Carrera 7 No. 36-45, Bogota, Colombia Tel/Fax: (57- 1) 320-900 Ext. 1400, E-mail: jplata@car.gov.co, Contact: Garcia Jorge Plata, Project Manager Barranquilla Flood Management: The objectives are to assist: (a) the Flood Risk Reduction Investments; (b) strengthen the municipal gov- ernment institution; and (c) resettlement of people in high risk areas, and compensation for involuntary loss of land. Project Concept Re- view Meeting scheduled for 2 November 2010. Environmental Assess- ment Category A. US$ 150.0 (IBRD). Consultants will be required. Secretariat of Plannig District of Barranquilla, Calle 34 No. 43-31, Co- lombia, Tel: (57-317) 641-7757, E-mail: mabuchaibe@ barranquilla. gov.co, Contact: Maria Elia Abuchaibe, Secretary of Planning
are to: (a) increase access to affordable land and housing solutions for over 200,000 households; and (b) develop and pilot approaches to access capital markets to finance the program as a means to re- duce and ultimately eliminate in the medium-term the need for public financing of infrastructure. Negotiations scheduled for 15 October 2010. Environmental Assessment Category B. Project: P110671. US$ 40.0 (IBRD). Consultants will be required. Ministry of Environment, Housing, and Territorial Development, Calle 37 No. 8-40, 3er Piso, Bogota, Colombia, Tel: (57-1) 332-3400, Fax: (57-1) 332-3400 Ext. 1265, Contact: Luis Felipe Henao Cardona, Viceministro
sectors (mainly social protection, education and health), preserving in the short term, and enhancing in the medium term, the human capital of the poorest citizens. Project Concept Review Meeting completed on 11 August 2010. Decision Meeting scheduled for 22 September 2010. Environmental Assessment Category U. Project: P121778. US$ 150.0 (IBRD). No consultants are required. Ministerio de Hacienda, Avenida Mexico No. 45, Gazcue, Dominican Republic, Tel: (809) 687-5131, Fax: (809) 688-8838, Contact: Enrique Fernandez, Sub- Director General El Salvador Health and Other Social Services Strengthening the Public Health Care System: The objectives are to: (a) expand the coverage of priority health care services with special focus to the rural population; and (b) strengthen the capacity of the MSPAS, Health Regions and SIBASI to steward, manage and deliver health care services. Project preparation is underway. Environmental Assessment Category B. Project: P117157. US$ 80.0 (IBRD). Con- sultants will be required. Ministry of Health, Ministerio de Salud, San Salvador, El Salvador, Tel: (503-2) 205-7332, Fax: (503-2) 271-0008, Contact: Eduardo Espinoza, Viceministro de Policas de Salud
ernment’s institutional capacities in the areas of public financial man- agement in order to improve efficiency, effectiveness and transpar- ency of government’s budget planning and implementation as well as to strengthen capacities of the Ministry of Finance for a more effective and transparent fiscal management. Signing tentatively scheduled for late-October 2010. Environmental Assessment Category C. Project: P095314. US$ 20.0 (IBRD). No consultants are required. Technical Secretariat of the Presidency, Alameda Manuel E. Araujo No. 5500, San Salvador, El Salvador, Tel: (503) 248-9250, Contact: Segovia Al- exander, Technical Secretary of the Presidency
the Government to improve the fiscal management with policy mea- sures to expand fiscal space and improve public finance management and transparency. Project identification is underway. Environmental Assessment Category U. US$ 80.0 (IBRD). Consulting services to be determined. Ministry of Finance, Boulevard de los Heroes No. 1231, Edificio Los Cerezos, San Salvador, El Salvador, Tel: (503) 2237-3051, Fax: (503) 2237-6419, E-mail: rina.djarquin@mh.gob.sv, Contact: Rina Castellanos de Jarquin, Directora General de Inversion y Credito
plement its disaster risk management program for natural disasters as part of its disaster risk management national framework. Project
ment Category U. Project: P122640. US$ 50.0 (IBRD). No consultants are required. Ministerio de Hacienda, Blvd De Los Heroes No. 1231,
PAGE 76 Monthly Operational Summary OCTOBER 2010 Edificio Ministerio de Hacienda, San Salvador, El Salvador, Tel: (503- 22) 443002, Fax: (503-22) 257-491
egy to increase the use of education, health and rural infrastructure services by the extreme poor in the most vulnerable municipalities, by boosting their demand for those services and strengthening sec- tor capacity to deliver them. Signing scheduled for 30 November
114.5 (IBRD). Consultants will be required. Ministry of Finance and Economy, 8va Avenida 20-87, Zona 1, Edificio Finanzas Publicas, Guatemala City, Guatemala, Tel: (502) 2248-5029, Fax: (502) 2248- 5005, E-mail: lalejos@minfin.gob.GT, Contact: Juan Alberto Fuentes Knight, Minister Industry and Trade Download 2 Mb. Do'stlaringiz bilan baham: |
ma'muriyatiga murojaat qiling