Final-biogas report2 2008


Local regulations for electrical safety of small biogas generators need to be


Download 0.79 Mb.
Pdf ko'rish
bet5/42
Sana18.06.2023
Hajmi0.79 Mb.
#1596656
1   2   3   4   5   6   7   8   9   ...   42
Bog'liq
Biogas-Report-Final

Local regulations for electrical safety of small biogas generators need to be 
verified by the utility, occupational health agencies, and local fire departments 
11.
 
Requirements for automatic or manual grid intertie need to be clearly 
established. 


II. 
UPEI Department of Engineering 

 550 University Avenue

 Charlottetown 

 PEI C1A 4P3 
Page

of 55 
Technical 
12.
 
Potential co-substrate energy content needs to be evaluated. 
13.
 
Optimum digester tank size will require a detailed analysis of influent and 
digestion process in a demonstration biogas system. 
14.
 
Ideal operating temperature needs to be determined from testing. 
15.
 
Heat loss calculations are based on theoretical estimates, and these need to be 
properly verified by experimental testing. 
16.
 
Start-up heating procedures need to be established. 
17.
 
Seasonal variability in the digester heating will be needed for correct heat system 
sizing and design. 
18.
 
Materials compatibility should be investigated, and metal, concrete, plastic, or 
fibreglass tanks will need to be considered in final designs. 
19.
 
Shipping costs of completed tanks, or onsite costs for construction on the farm 
will need to be evaluated. 
20.
 
Digester maintenance and cleaning requirements for the heating surfaces will 

Download 0.79 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   42




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling