Ground, shafts, underwater, sizeable
Download 127.49 Kb. Pdf ko'rish
|
1. Fill in the gaps using the words below: Cut-and-cover, hard rock, blast, tunnel boring machines, trench, immersed tube tunnel, ground, shafts, underwater, sizeable. 1. Before building a tunnel it is important to examine the conditions and type of _________ and groundwater. 2. Tunnels are dug in types of materials varying from soft clay to _________. 3. A _________ is excavated with ground support as necessary and the tunnel is constructed in it.
4. ___________ are the main entrance in and out of the tunnel until the project is completed. 5. The world‟s oldest _________ tunnel is the Terelek kaya tьneli under Kızıl River in Turkey. 6. Seven _________ will be used to construct the tunnels for SCL project. 7. A 1.3km SCL cross-harbour tunnel across Victoria Harbour will be built by using _________. 8. _________ is a method of tunnel construction where a trench is excavated and roofed over. 9. The first _________ tunnel in soft ground was the Tronquoy tunnel on the St Quentin canal in France in 1803. 10. Before the advent of tunnel boring machines, drill and _________ was the only economical way of excavating long tunnels through hard rock, where digging is not possible.
Download 127.49 Kb. Do'stlaringiz bilan baham: |
ma'muriyatiga murojaat qiling