2145-CG8 Storage Engine Ordering Example

  • Initial Order with 10 GbE connectivity

    • US Customer needs a base SAN Volume Controller configuration with 10 Gigabit iSCSI host connectivity
    • Purchase 2145-CG8 with F/C 3001 (Initial Storage Engine)
      • Note: F/C 3001 indicates an order for SVC Storage Software (5639-VC5) is required
      • F/C 0010 – Preload for SVC software
      • F/C 0017 – Software in Passport Advantage
      • F/C 3001 – Initial Storage Engine [Qty = 1]
      • F/C 5700 – 10 Gigabit Ethernet Attachment [Qty = 1]
      • F/C 5711 – IBM 10GbE Optical SW SFP pair [Qty = 1]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]
    • Purchase 2145-CG8 with F/C 3002 (Additional Storage Engine)
      • F/C 0010 - Preload
      • F/C 3002 – Additional Storage Engine [Qty = 1]
      • F/C 5700 – 10 Gigabit Ethernet Attachment [Qty = 1]
      • F/C 5711 – IBM 10GbE Optical SW SFP pair [Qty = 1]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]


2145-CG8 Storage Engine Ordering Example

  • Add Engines into same SVC cluster

    • Customer with an existing 2-node SAN Volume Controller cluster needs to add an I/O Group, Purchase 2145-CG8 with F/C 3002 (Additional Storage Engine)
      • F/C 0010 - Preload
      • F/C 3002 – Additional Storage Engine [Qty = 1]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 8300 – Redundant AC Power [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]
      • F/C 5305 – 5 m Fibre Optic Cable LC-LC [Qty = 4]
    • Purchase 2145-CG8 with F/C 3002 (Additional Storage Engine)
      • F/C 0010 - Preload
      • F/C 3002 – Additional Storage Engine [Qty = 1]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 8300 – Redundant AC Power [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]
      • F/C 5305 – 5 m Fibre Optic Cable LC-LC [Qty = 4]


2145-CG8 Storage Engine Ordering Example:

  • Add additional HW cluster to existing datacenter

      • Original SVC Software ordered in Passport Advantage
    • Purchase 2145-CG8 with F/C 3001 (Initial Storage Engine)
      • F/C 0010 – Preload for SVC software
      • F/C 0019 – Secondary SVC HW Cluster at this customer
      • F/C 3001 – Initial Storage Engine [Qty = 1]
      • F/C 5305 – 5 m Fibre Optic Cable LC-LC [Qty = 6]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]
    • Purchase 2145-CG8 with F/C 3002 (Additional Storage Engine)
      • F/C 0010 - Preload
      • F/C 3002 – Additional Storage Engine [Qty = 1]
      • F/C 5305 – 5 m Fibre Optic Cable LC-LC [Qty = 4]
      • F/C 8115 – UPS [Qty = 1]
      • F/C 9714 – UPS Power Cord [Qty = 1]
    • Note: Use of F/C 0019 is subject to validation/proof that original SVC HW cluster orders using either 0017 or 0018 F/Cs already exists for this customer.
    • Note 2: Additional virtualization capacity for this customer can be purchased separately using 5639-VC6 and/or 5639-SX1.


SVC Ordering and Fulfillment Information

  • System Overview

  • SVC – standard edition

    • Software
    • Hardware
  • SVC for XIV

    • Software
  • SVC Entry Edition

    • Software
    • Hardware
  • Services

  • Ordering a System using Passport Advantage and AAS

  • Reference Information

    • NEW PIDs, part numbers and feature codes
    • FlashCopy usage example
    • Metro Mirror usage example
    • Ordering Options
    • AAS to Passport Advantage Software License Migrations


SVC for XIV Ordering Logic – New Order

  • Hardware (required)

    • How many I/O Groups (# of pairs of Storage Engines)?
      • Use Disk Magic for sizing this
    • What country? (UPS power cords)
    • Do you need Fibre Channel cables? If so, length/quantity…
    • Does the data center have dual power circuits? (Redundant AC Power unit)
    • Is this the first SVC cluster in data center? If yes, then SSPC is required for SVC console
    • Am I configuring a split I/O group? If so, order the needed LW SFPs
  • Services (optional)

    • Storage Solution Consulting
    • IT Consulting
    • Implementation
    • Migration


Scenario 1: SVC + XIV 1TB Drawers



Scenario 2: SVC + XIV with Heterogeneous Storage



SVC for XIV Ordering Logic – Add To Existing Customer (5639-SX1)

  • Software Capacity

    • Increase base storage with more XIV storage? If so, how much?
    • Increase base storage with more non-XIV storage? Then refer to the 5639-VC6 license for authorization.
    • NOTE: Add/Increase FlashCopy and Metro Mirror or Global Mirror authorizations with 5639-SX1
    • Additional years of software maintenance?

  • Каталог: developerworks -> community


    Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   14


Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2019
ma'muriyatiga murojaat qiling