COMMISSIONING
COST SAVINGS IN
INSTALLATION
The HART protocol improves plant performance and provide savings in:
Commissioning and installation
Plant operations and improved quality
Maintenance
HART-based field devices can be installed and commissioned in a fraction of the time required for a traditional analog-only system. Operators who use HART digital communications can easily identify a field device by its tag and verify that operational parameters are correct. Configurations of similar devices can be copied to streamline the commissioning process. A loop integrity check is readily accomplished by commanding the field transmitter to set the analog output to a preset value.
The HART protocol supports the networking of several devices on a single twisted wire pair. This configuration can provide significant savings in wiring, especially for applications such as tank monitoring.
Multivariable devices reduce the number of instruments, wiring,
spare parts, and terminations required. Some HART field instruments embed PID control, which eliminates the
need for a separate controller, and results in significant wiring and equipment cost savings.