Palm beach county planning, zoning and building department zoning division
Download 214.68 Kb. Pdf ko'rish
|
Page Project No. 0904-000
payments as it currently exists or as it may from time to time be amended. (ONGONG-ENGINEERING)
4. The property owner shall convey to Palm Beach County Land Development Division by road right of way warranty deed to provide for 110 feet right of way for Belvedere Road. This additional right of way, 2.8 feet, shall be located south of the ultimate south right of way line of the Lake Worth Drainage District L-48 Canal. Right of way shall be conveyed on or before December 1, 2004 or prior to the issuance of the first Building Permit whichever shall first occur. Right of way conveyance shall be along the projects entire frontage and shall be free of all encumbrances and encroachments. The Developer shall provide Palm Beach County with sufficient documentation acceptable to the Right of Way Acquisition Section to ensure that the property is free of all encumbrances and encroachments. (DATE/BLDG. PERMIT: MONITORING-Eng)
5. The concurrency approval is subject to the project aggregation rule set forth in the Traffic Performance Standards Ordinance. (ONGOING)
6.
On or before January 1, 2005, the property owner shall convey to Palm Beach County sufficient road drainage easement(s) through the project's internal drainage system, as required by and approved by the County Engineer, to provide legal positive outfall for runoff from those segments of Belvedere Road along the property frontage; and up to a maximum of an additional 800 feet of these adjacent roadway(s). The limits of this additional 800 feet of drainage shall be determined by the County Engineer. Said easements shall be no less than 20 feet in width. Portions of such system not included within roadways or waterways dedicated for drainage purposes will be specifically encumbered by said minimum 20 foot drainage easement from the point of origin, to the point of legal positive outfall. The drainage system within the project shall have sufficient retention/detention, Compensating storage within this projects retention system as required by all permitting agencies, and conveyance capacity to meet the storm water discharge and treatment requirements of Palm Beach County and the applicable Drainage District, as well as the South Florida Water Management District, for the combined runoff from the project to accommodate the ultimate Thoroughfare Plan Road Section(s) of the included segment. If required and approved by the County Engineer the property owner shall construct within the proposed drainage easements a minimum of 24 inch closed piping system and appropriate wingwall or other structures as required by and approved by the County Engineer. Elevation and location of the entire drainage system shall be approved by the County Engineer. Any and all excess fill material from excavation by Palm Beach County within said easements shall become the property of Palm Beach County which at its discretion may use this fill material. (DATE:MONITORING-Eng)
7. Prior to site plan approval to approval of the final subdivision plan by the DRO for the site the applicant shall provide a drainage study approved by County Engineer for this site. This drainage study shall incorporate any existing storm water drainage onto this site from any of the adjacent properties. The recommendation contained within this study shall be incorporated into the proposed site plan. (DRO APPROVAL:ENGINEERING-Eng)
F.
PLANNING
1. The petitioner shall include in homeowners documents as well as written sales brochures, sales contracts, Master Plans and related Site Plans a disclosure statement identifying and notifying future residents of the PUD, the PUD’s existence in the Palm Beach International Airport Flight Path and that residents may experience some airport related noise. The
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
developer/property owner shall submit documentation of compliance with this condition on an annual basis to the Monitoring Section of the Planning, Zoning and Building Department beginning on January 1, 2005 and shall continue on an annual basis until all units within the development have been sold or the developer relinquishes control to the homeowners association. (ONGOING: MONITORING-Planning)
2. Prior to final master plan approval by the Development Review Officer (DRO), the site plan shall be amended to align the two (2) dead end streets on the east side of the site with Leon Drive and Balfrey Road (one for each respective roadway). At these locations, notations of future vehicular and pedestrian access points to these roadways shall be placed on the site plan which shall read “potential vehicular and pedestrian cross access to be paved to the property line”. (DRO:PLANNING-Planning)
3. Prior to the issuance of a certificate of occupancy, the petitioner shall pave vehicular and pedestrian cross access points to the edge of the eastern property lines with a break in any buffering or walls at the locations shown on the final approved site plan that will read "potential vehicular and pedestrian cross access to be paved to the property line.” (CO:MONITORING-Planning)
4.
Prior to final master plan approval by the Development Review Officer (DRO), the notation for a five (5) foot mulch pathway along the lake shall remain on the master plan as indicated on the master plan dated April 13, 2004. In addition, the master plan shall contain a pedestrian connection from the mulch pathway to the recreation area, clubhouse, and private civic area. (DRO:PLANNING-Planning)
SCHOOL BOARD
1. The property owner shall post a notice of annual boundary school assignments for students from this development. A sign 11" X 17" shall be posted in a clear and visible location in all sales offices and models with the following:
School age children may not be assigned to the public school closest to their residences. School Board policies regarding levels of service or other boundary policy decisions affect school boundaries. Please contact the Palm Beach County School District Boundary Office at (561) 434-8100 for the most current school assignment(s). (ONGOING: SCHOOL BOARD-School Board)
2. Prior to the issuance of the first Certificate of Occupancy (CO), the school bus shelter shall be constructed by the property owner in a location and manner acceptable to the Palm Beach County School Board and the County Engineer. Provisions for the bus shelter shall include, at a minimum, a covered area and a continuous paved pedestrian from the subject property or use to the shelter. Maintenance of the bus shelter(s) shall be the responsibility of the residential property owner. (CO: SCHOOL BOARD/ENG – School Board.)
G.H. COMPLIANCE 1.
In granting this approval, the Board of County Commissioners relied upon the oral and written representations of the petitioner both on the record and as part of the application process. Deviations from or violation of these representations shall cause the approval to be presented to the Board of County Commissioners for review under the compliance condition of this approval. (ONGOING: MONITORING - Zoning) BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
Failure to comply with any of the conditions of approval for the subject property at any time may result in:
a.
The issuance of a stop work order; the issuance of a cease and desist order; the denial or revocation of a building permit; the denial or revocation of a Certificate of Occupancy; the denial of any other permit, license or approval to any developer, owner, lessee, or user of the subject property; the revocation of any other permit, license or approval from any developer, owner, lessee, or user of the subject property; revocation of any concurrency; and/or b.
The revocation of the Official Map Amendment, Conditional Use, Requested Use, Development Order Amendment, and/or any other zoning approval; and/or c.
A requirement of the development to conform with the standards of the ULDC at the time of the finding of non-compliance, or the addition or modification of conditions reasonably related to the failure to comply with existing conditions; and/or d. Referral to code enforcement; and/or e. Imposition of entitlement density or intensity.
Staff may be directed by the Executive Director of PZ&B or a Code Enforcement Special Master to schedule a Status Report before the body which approved the Official Zoning Map Amendment, Conditional Use, Requested Use, Development Order Amendment, and/or other zoning approval, in accordance with the provisions of Article 2.E of the ULDC, in response to any flagrant violation and/or continued violation of any condition of approval.
Appeals of any departmental administrative actions hereunder may be taken to the Palm Beach County Board of Adjustment or as otherwise provided in the Unified Land Development Code (ULDC), as amended. Appeals of any revocation of an Official Zoning Map Amendment, Conditional Use, Requested Use, Development Order Amendment or other actions based on a Board of County Commission decision shall be by petition for writ of certiorari to the Fifteenth Judicial Circuit. (ONGOING: MONITORING - Zoning)
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
ACCIDENT HISTORY REPORT BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
EXHIBIT E BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
EXHIBIT F BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000
BCC
July 22, 2004 Petition PDD2004-014
BCC District 6
Page Project No. 0904-000 Download 214.68 Kb. Do'stlaringiz bilan baham: |
ma'muriyatiga murojaat qiling