100
Project Management in the Oil and Gas Industry
Figure 3.9 shows the latest start and finish for
each activity by applying
the following equation:
LS =
LF–
D.
In the last activity, calculate back because the latest early finish will be 25
days by applying the above equation.
From Figure 3.9, by subtracting the latest start (
LS)
from latest finish
(
LF) and subtracting the early start (
ES) from early finish (
EF), it gives the
value of zero, so it means that this activity is on the critical path. But, if the
difference
of the subtraction has a value, it means that this activity can be
delayed by this time period without affecting the total project time.
100
600
200
400
3
7
7
12
0
3
3
11
11
21
21
22
22
23
23
25
300
500
700
800
Pouring
concrete
Excavate
Install piping
Mech. package
Put grouting
Conn. piping
3
1
8
4
10
1
5
Comm. & start up