Reading passages


Download 1.25 Mb.
Pdf ko'rish
bet245/255
Sana24.03.2023
Hajmi1.25 Mb.
#1291285
1   ...   241   242   243   244   245   246   247   248   ...   255
Bog'liq
test ban

 
126 
the condition is much worse. Competition is cut-
throat. Exporters from 24 low-cost countries are 
fighting for a share in the European market. Tavi is suffering from this competition. The stores are 
now bargaining hard over prices, and Tavi has already lost two important orders. 
34. 
The passage presents the case of a textile firm which, . 
A) in recent years, has recovered its lost markets by introducing drastic measures 
B) on the whole, has been showing a steady improvement in its position 
C) owing to fierce international competition, is having 10 struggle to survive 
D) quite unfairly, has laid off more than half of its work force 
E) in the long run, seems likely to defeat its main competitors 
35. 
We can understand from the passage that the area which has been 
hit worst by international competition . 
A) is that of fabric sales in which Tavi has made great profits 
B) has been textile industries of India and Pakistan 
C) is the home market itself in which Tavi wed to be in the lead 
D) is the clotbing industry in Portugal 
E) has been ready-to-wear market 
36. 
One can conclude from the passage that Tavi's problems 
. 
A) are due do the unrest among the workers 
B) arise from the growing market pressure of low-cost countries 
C) are linked with the lack of interest in the European market 
D) must be related to the continuous rise in prices in textile 
E) began with the loss of two large orders 
The main advantage of prefabrication are two fold: it is quicker and it does away with uncertainty. 
Speed in building is significant these days due to the high cost of land: the time during which such an 
expensive commodity is out of use must be reduced to a minimum. And partly or wholly 
prefabricated methods of construction save time on the job because parts are prepared in the factory 
beforehand. Prefabrication does away with uncertainty because it means that the whole building is 
made of standard parts the behaviour of which is known and has been tested. 

Download 1.25 Mb.

Do'stlaringiz bilan baham:
1   ...   241   242   243   244   245   246   247   248   ...   255




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling