Richard bray
Download 367.2 Kb.
|
- Bu sahifa navigatsiya:
- Bell adapter Male threaded To slip adapter
- Notches PVC Pipe
- Step 23. Add an air stone into the fish tank. 137 Step 24.
Step 20.
Use the 1" male threaded to slip adapter to trace a hole in the back right corner of the grow bed. Cut out the hole with a box cutter. Step 21. Make the bell siphon:
134
Bell adapter Male threaded To slip adapter Bottom of grow bed 135
Notches PVC Pipe 136
Step 22. Rinse off the grow media thoroughly. Place the grow bed tote into the grow bed cage. Fill the grow bed with media, leaving at least 1" of space between the media and the edge of the grow bed. Step 23. Add an air stone into the fish tank. 137 Step 24. Turn on the water pump. Check to make sure water flows up into the grow bed, and that the bell siphon drains it back into the fish tank. Check for leaks around the IBC valves and the bell siphon fittings. Use 100% silicone to seal any leaks in the tote, and use dope tape to fix leaks in the PVC pipe. Use valves to adjust water flow into the grow bed if the bell siphon is not draining properly. Step 25. Once the water is circulating appropriately, cycle your system. Each of these systems omits the need for a sump tank because the grow bed sits directly on top of the fish tank. This reduces the amount of space the system will use, and it also reduces the amount of plumbing to build and clean. You can scale any system up or down as long as you keep a 1:1 ratio of fish tank volume to grow bed volume. However, while these designs can be scaled up, DWC systems are best for large operations. 138 Alex Francis Pro/Shutterstock.com 139 Download 367.2 Kb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling