(R) Rio de Janeiro Public Sector Modernization (Ln. 79550-BR): 

The objective is to assist the government of the state in its public sec-

tor modernization efforts by providing technical assistance on: (i) the 

design and implementation of performance management mechanisms 

for selected agencies; (ii) the design and implementation of institu-

tional reforms; and (iii) other public sector modernization initiatives. 



Bank Approval completed on 26 August 2010. Signing scheduled for 

26 November 2010. Environmental Assessment Category C. Project: 

P106768. US$ 18.7 (IBRD). No consultants are required. Secretariat 

of Planning and Management of the Government of Rio de Janeiro, 

Av. Erasmo Braga, No. 118, Centro, Rio de Janeiro, RJ, Brazil, Tel: 

(55-21) 2292-5100, Fax: (55-21) 2533-5979, Contact: Francisco Cal-

das, Under-Secretary General for Planning and Management



(R) Rio de Janeiro Urban and Housing Development: The objec-

tive is to support the Partnership Program with the State Government 

on housing and urban development issues including Technical Assis-

tance for the formulation of a housing strategy. Project Concept Re-



view Meeting scheduled for 7 October 2010. Environmental Assess-

ment Category U. US$ 485.0 (IBRD). Consultants will be required. 

Implementing agency(ies) to be determined.

(R)  Sao  Paulo  Sustainable  Rural  Development  and  Access  to 

Markets (Ln. 79080-BR): The objective is to support the State of 

São Paulo to increase the competitiveness of family agriculture in its 

territory while improving environmental sustainability. Signing tenta-

tively scheduled for early-October 2010. Environmental Assessment 

Category B. Project: P108443. US$ 78.0 (IBRD). Consultants will be 

required. Secretaria de Agricultura e Abastecimento, Avenida Miguel 

Stefano,  3.900,  04301-903,  Sao  Paulo,  Brazil,  Tel:  (55-19)  3743-

3721/02,  Fax:  (55-19)  3743-3705,  E-mail:  brunelli@cati.sp.gov.br, 

Contact: Joao Brunelli Junior, Project Coordinator



Transportation

(R)  Mato  Grosso  do  Sul  State  Road Transport  (Ln.  78720-BR): 

The objectives are to improve the efficiency of the road network with 

selected investments in road infrastructure and activities that seek to 

strengthen the State Government’s overall capacity to manage the road 



PAGE 74 

Monthly Operational Summary  

OCTOBER 2010

network. The loan was signed on 16 September 2010. Environmental 

Assessment Category B. Project: P118410. US$ 300.0 (IBRD). Con-

sultants will be required in the supervision. Agencia Estadual de Gestao 

de Empreendimentos de Mato Grosso do Sul, Av. Desembargador Jose 

Nunes da Cunha, Bloco 14, Gampo Grande, MS, Brazil, Tel: (55-67) 

3318-5538, Fax: (55-67) 3318-5386, E-mail: coordenacao.pde@agesul.

ms.gov.br, Contact: Juliana Pegolo, Project Coordinator



(R) Sao Paulo Metro Line 4-Phase 2 (Ln. 78690-BR): The objective 

is to improve the quality of service provided to the urban transport 

users in the area of influence of the new Line 4 stations and facilitate 

the integration between metro and bus at those stations. Signing tenta-



tively scheduled for late-September 2010. Environmental Assessment 

Category A. Project: P106390. US$ 130.0/130.0 (IBRD/JBIC). Con-

sultants will be required. Companhia do Metropolitano de Sao Paulo, 

Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-

11) 3291-5494, Fax: (55-11) 3291-2890, E-mail: egranado@metrosp.

com.br, Contact: Ernesto Granado, Coordinator PMU



Sao Paulo Metro Line 5: The objective is to improve mobility for 

public  transport  users  in  the  Capão  Redondo-Largo  Treze-Chácara 

Klabin corridor in a cost-efficient and environmentally friendly way. 

Signing  tentatively  scheduled  for  late-September  2010.  Environ-

mental Assessment Category A. Project: P116170. US$ 650.4/481.0 

(IBRD/IADB). Consultants will be required for assessment of train 

and  systems  specifications,  project  management  and  supervision. 

Companhia do Metropolitano de Sao Paulo, Rua Boa Vista 175, Bloco 

B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291-5494, Fax: (55-

11) 3291-2890, E-mail: egranado@metrosp.com.br, Contact: Ernesto 

Granado, Coordinator PMU

Sao Paulo State Feeder Roads Additional Financing: The objec-

tive, same as the parent project, is to improve the efficiency of the 

Borrower’s paved municipal road network that is a combination of 

financing for the anticipated cost overrun and the scale-up of the par-

ent  project’s  civil  works  component.  Signing  tentatively  scheduled 

for  late-September  2010.  Environmental  Assessment  Category  B. 

Project: P118077. US$ 326.8 (IBRD). Consultants will be required. 

Departamento de Estradas de rodagem do Estado de Sao Paulo (DER/

SP), Avenida do Estado 777, 3o Andar, Ponte Pequena, Sao Paulo, SP, 

Brazil, Tel: (5511) 3311-1401, Fax: (55-11) 3311-0973, E-mail: del-

son@sp.gov.br, Contact: Delson Jose Amador, Superintendente

Sao Paulo Trains and Signaling Additional Financing: The objec-

tive is to continue to improve the quality of service offered to SPMR. 

users by acquiring additional 9 trains for Line 11 of the São Paulo 

suburban railway (CPTM). Negotiations completed on 3 August 2010. 

Bank Approval scheduled for 21 September 2010. Environmental As-

sessment Category B. Project: P117122. US$ 112.9 (IBRD). Consul-

tants will be required for studies, project management and supervi-

sion/reception of trains. Companhia Paulista de Trens Metropolitanos, 

Rua Boavista, 185-2 Andar BI. A, Centro Sao Paulo, Sao Paulo, SP, 

Brazil,  Tel:  (55-11)  3101-7141,  E-mail:  acbissoli@cptm.sp.gov.br, 

Contact: Afonso Bissoli, Coordinator UGP

Tocantins  Integrated  Sustainable  Regional  Development:  The 

objective  is  to  contribute  to  fostering  increased  competitiveness  of 

the  State  economy  through  improved  road  transport  efficiency  and 

enhanced  public  services  delivery.  Project  Concept  Review  Meet-

ing completed on 10 August 2010. Project preparation is underway. 

Environmental  Assessment  Category  B.  Project:  P121495.  US$ 

300.0  (IBRD).  Consultants  will  be  required.  Secretaria  de  Estado 

da  Infraestrutura  Tocantins,  Esplanada  das  Secretarias,  Praca  dos 

Girassois,Palmas,  Brazil,  Tel:  (55-63)  3218-1640/41,  Fax:  (55-63) 

3218-1690, E-mail: dae@seinf.to.gov.br, Contact: Silvio Leao, Super-

intendente de Apoio Estrategico

Water, Sanitation and Flood Protection

(R) Bahia Integrated Health and Water Management SWAp: The 

objectives are to: (i) increase access to clean water, sanitation, and ba-

sic health care in at least 10 State priority municipalities most affected 

by IID; and (ii) improve neonatal health care in 25 selected reference 

hospitals using a Baremo of quality and efficiency. Negotiations com-

pleted on 23 August 2010. Bank Approval scheduled for 2 November 

2010. Environmental Assessment Category B. Project: P095171. US$ 

60.0 (IBRD). Consultants will be required. State of Bahia, Av. Luis Vi-

ana Filho 400, 4o Andar, Centro Administrativo, Salvador, BA, Brazil, 

Tel: (55-71) 3115-3550, Fax: (55-71) 3371-3237, Contact: Jorge Jose 

Santos Pereira Solla, Secretario de Estado de Saude

(R) Integrated Solid Waste Management and Carbon Finance: The 

objective is to scale-up public and private investments in municipal solid 

waste management treatment and disposal, while ensuring financial and 

technical viability and reducing environmental and social impacts. Ne-



gotiations completed on 9 September 2010. Bank approval tentatively 

scheduled for Novemer 2010. Environmental Assessment Category F. 

Project: P106702. US$ 50.0 (IBRD). Consultants will be required. Caixa 

Economica Federal, SBS Quadra 4 Lotes 3/4, Ed. Matriz I, 11 Andar-

GEAIN, Brasilia, Brazil, Tel: (55-61) 3206-4911, E-mail: gesan@caixa.

gov.br, Contact: Adailton Ferreira Trindade, Gerente Nacional

(R) Sergipe Water: The objective is to promote efficient and sustain-

able water use in targeted municipalities of the Sergipe river basin, 

by improving water resources management and regulatory tools, re-

ducing the pollution load discharged into rivers and increasing water 

services productivity. Decision Meeting scheduled for 30 September 

2010. Environmental Assessment Category A. Project: P112074. US$ 

70.3 (IBRD). Consultants will required to: (a) prepare environmental 

and social assessments, economic and financial assessments, devel-

opment of project operation manual, irrigation services assessments, 

utility corporate reform and non-revenue water program; and (b) im-

plementation. State Secretariat of Environment and Water Resources, 

Sergipe, Av. Prefeito Heraclito Rollemberg, S/N, Sergipe, Brazil, Tel: 

(55-79) 31797300, Fax: (55-79) 3179-7302, Contact: Ailton Francisco 

da Rocha, Project Coordinator

Brasilia Environmentally Sustainable Additional Financing: The 

objectives are to reduce regional inequalities and ensure quality of wa-

ter resources in the Federal District and Brasilia Metropolitan Region 

through environmental planning and management activities, poverty 

reduction interventions and environmental rehabilitation in the most 

critical river basins. This project is on hold until further notice. En-

vironmental Assessment Category A. US$ 57.6 (IBRD). Consulting 

services and implementing agency(ies) to be determined.



Sao Paulo Water Recovery REAGUA: The objective is to increase 

water availability in the critical watersheds. Signing tentatively sched-

uled for late-September 2010. Environmental Assessment Category 

B. Project: P106703. US$ 64.5 (IBRD). Consultants will be required 

for assistance to the State Secretariat of Water and Energy to man-

age  and  verify  results  during  implementation.  Secretaria  de  Estado 

de Saneamento e Energia, Rua Bela Cintra 847, 14o Andar, Bairro 

Consolacao, Sao Paulo, SP, Brazil, Tel: (55-11) 3218-5500, E-mail: 

dilmapena@sp.gov.br, Contact: Ms. Dilma Pena, Secretaria

Chile

Energy and Mining

Climate Change and Energy: The objective is to support energy ef-

ficiency, renewable energy and other clean technologies that would re-

duce emissions of greenhouse gases. Project Concept Review Meeting 

scheduled for 18 January 2011. Environmental Assessment Category 

B.  US$  50.0  (IBRD).  Consultants  will  be  required.  Implementing 

agency(ies) to be determined.



Colombia

Agriculture, Fishing, and Forestry

(R) National Protected Areas Additional Financing: The objective 

is to promote the consolidation and long-term sustainability of Colom-

bia’s National Protected Areas System (NPAS) through designing and 

implementing  a  Protected Areas  Conservation Trust  Fund.  Decision 



Meeting scheduled for 23 September 2010. Environmental Assessment 

Category B. Project: P112106. US$ 4.0 (GEFU). Consultants will be 

required. Patrimonio Natural, Calle 72 No. 10-70, Edificio Centro Ave-

nida Chile, Torre A, Bogota, Colombia, Tel: (57-1) 211-5545, E-mail: 

agalan@patrimonionatural.org.co, Contact: Alberto Galan, Director

(R) Second Agricultural Transition: The objective is to: (a) consoli-

date the progress in the establishment of a diversified agricultural in-



OCTOBER 2010  

Monthly Operational Summary  

PAGE 75

nova


tion system and strengthen Colombia’s sanitary and phytosanitary 

systems; (b) establish novel ways for technical assistance to agriculture 

producers. This project is no longer in the lending program. Further 

reporting  will  be  discontinued.  Environmental Assessment  Category 

B. US$ 30.0 (IBRD). Consultants will be required. Ministry of Agri-

culture, Av. Jimenez 7-65, Colombia, Tel: (57-1) 341-9005, Fax: (57-

1)  284-1775,  E-mail:  claudia.uribe@minagricultura.gov.co,  Contact: 

Claudia Uribe, Coordinadora del PTA

Education

(R) Early Childhood: The objective is to support the government 

in improving access to quality early childhood development services. 



Project Concept Review Meeting scheduled for 30 September 2010. 

Environmental Assessment Category B. US$ 40.0 (IBRD). Consul-

tants will be required. Implementing agency(ies) to be determined.

Education System Modernization: The objectives are to support: (a) 

the planned institutional transformation of Instituto Colombiano para 

el Fomento de la Educacion Superior (ICFES) from a public entity 

to a semi public entity; and (b) technical and institutional capacity of 

ICFES to analyze, monitor and report student assessments. Decision 

Meeting  scheduled  for  22  September  2010.  Environmental Assess-

ment Category C. Project: P106693. US$ 20.0 (IBRD). Consultants 

will be required. Instituto Colombiano para el Fomento de la Educa-

cion Superior, Margarita Pe, Director, Colombia, Tel: (57-1) 341-228, 

E-mail: mpena@ices.org, Contact: Margarita Pena, Directora



Public Administration, Law, and Justice

Sustainable Development Additional Financing: The objective is to 

ensure sustained progress through technical assistance and investment 

in three of the four thematic areas of the original loan: (i) environmen-

tal health: outdoor air quality and a hand washing campaign, (ii) inte-

grated water resources management, and (iii) planning and oversight 

of  environmental  management.  Decision  Meeting  scheduled  for  27 

September 2010. Environmental Assessment Category C. US$ 10.0 

(IBRD). Consultants will be required. Ministry of Environment and 

National Planning Department, Calle 37 No. 8-40, Bogota, Colom-

bia, Tel: (57-1) 332-3400, Ext. 1194, Fax: (57-1) 332-3429, E-mail: 

lnino@minambiente.gov.co,  Contact:  Lucy  Amparo  Nino  Carrillo, 

Coordinadora de Banca Multilateral



Transportation

(R) National Urban Transport: The objectives are to: (a) deliver high 

quality and sustainable BRTS in selected medium and large cities to 

improve mobility along the most strategic mass transit corridors; (b) 

improve accessibility for the poor through feeder services and fare in-

tegration; and (c) build greater institutional capacity at the national and 

local level. Project Concept Review Meeting completed on 3 September 



2010. Decision Meeting scheduled for 12 October 2010. Environmen-

tal Assessment Category B. US$ 350.0 (IBRD). Consultants will be 

required. Ministry of Transport, Av. El Dorado CAN, Colombia, Tel: 

(57-1)  324-0800,  E-mail:  mintrans@mintransporte.gov.co,  Contact: 

Carolina Camacho, Coordinadora Sistemas Integrados de Transporte

Water, Sanitation and Flood Protection

(R) Rio Bogota Environmental Infrastructure: The objective is to 

transform the Rio Bogota from an environmental liability into an ur-

ban set for the metropolitan region by improving water quality, reduc-

ing flood risk, and creating a series of multi-functional parks along 

the river. Bank Approval scheduled for 11 November 2010. Environ-

mental Assessment Category A. Project: P111479. US$ 250.0 (IBRD). 

Consultants  will  be  required.  Corporacion  Autonoma  Regional  de 

Cundinamarca, Carrera 7 No. 36-45, Bogota, Colombia Tel/Fax: (57-

1)  320-900  Ext.  1400,  E-mail:  jplata@car.gov.co,  Contact:  Garcia 

Jorge Plata, Project Manager



Barranquilla Flood Management: The objectives are to assist: (a) the 

Flood Risk Reduction Investments; (b) strengthen the municipal gov-

ernment institution; and (c) resettlement of people in high risk areas, 

and compensation for involuntary loss of land. Project Concept Re-

view Meeting scheduled for 2 November 2010. Environmental Assess-

ment Category A. US$ 150.0 (IBRD). Consultants will be required. 

Secretariat of Plannig District of Barranquilla, Calle 34 No. 43-31, Co-

lombia, Tel: (57-317) 641-7757, E-mail: mabuchaibe@ barranquilla.

gov.co, Contact: Maria Elia Abuchaibe, Secretary of Planning 

National Macroproyectos Social Interest Program: The objectives 

are to: (a) increase access to affordable land and housing solutions 

for over 200,000 households; and (b) develop and pilot approaches 

to access capital markets to finance the program as a means to re-

duce and ultimately eliminate in the medium-term the need for public 

financing  of  infrastructure.  Negotiations  scheduled  for  15  October 

2010. Environmental Assessment Category B. Project: P110671. US$ 

40.0 (IBRD). Consultants will be required. Ministry of Environment, 

Housing, and Territorial Development, Calle 37 No. 8-40, 3er Piso, 

Bogota, Colombia, Tel: (57-1) 332-3400, Fax: (57-1) 332-3400 Ext. 

1265, Contact: Luis Felipe Henao Cardona, Viceministro

Dominican Republic

Health and Other Social Services

Second Performance and Accountability of Social Sectors Devel-

opment Policy Loan: The objective is to improve results in social 

sectors (mainly social protection, education and health), preserving in 

the short term, and enhancing in the medium term, the human capital 

of the poorest citizens. Project Concept Review Meeting completed 

on 11 August 2010. Decision Meeting scheduled for 22 September 

2010. Environmental Assessment Category U. Project: P121778. US$ 

150.0 (IBRD). No consultants are required. Ministerio de Hacienda, 

Avenida  Mexico  No.  45,  Gazcue,  Dominican  Republic,  Tel:  (809) 

687-5131,  Fax:  (809)  688-8838,  Contact:  Enrique  Fernandez,  Sub-

Director General



El Salvador

Health and Other Social Services

Strengthening the Public Health Care System: The objectives are 

to: (a) expand the coverage of priority health care services with special 

focus to the rural population; and (b) strengthen the capacity of the 

MSPAS, Health Regions and SIBASI to steward, manage and deliver 

health care services. Project preparation is underway. Environmental 

Assessment Category B. Project: P117157. US$ 80.0 (IBRD). Con-

sultants will be required. Ministry of Health, Ministerio de Salud, San 

Salvador, El Salvador, Tel: (503-2) 205-7332, Fax: (503-2) 271-0008, 

Contact: Eduardo Espinoza, Viceministro de Policas de Salud

Public Administration, Law, and Justice

(R) Fiscal Management and Public Sector Performance Technical 

Assistance Loan (Ln. 78120-SV): The objective is to enhance gov-

ernment’s institutional capacities in the areas of public financial man-

agement in order to improve efficiency, effectiveness and transpar-

ency of government’s budget planning and implementation as well as 

to strengthen capacities of the Ministry of Finance for a more effective 

and transparent fiscal management. Signing tentatively scheduled for 



late-October 2010. Environmental Assessment Category C. Project: 

P095314. US$ 20.0 (IBRD). No consultants are required. Technical 

Secretariat of the Presidency, Alameda Manuel E. Araujo No. 5500, 

San Salvador, El Salvador, Tel: (503) 248-9250, Contact: Segovia Al-

exander, Technical Secretary of the Presidency 

Public Finance Development Policy Loan: The objective is to support 

the Government to improve the fiscal management with policy mea-

sures to expand fiscal space and improve public finance management 

and  transparency.  Project  identification  is  underway.  Environmental 

Assessment Category U. US$ 80.0 (IBRD). Consulting services to be 

determined. Ministry of Finance, Boulevard de los Heroes No. 1231, 

Edificio Los Cerezos, San Salvador, El Salvador, Tel: (503) 2237-3051, 

Fax: (503) 2237-6419, E-mail: rina.djarquin@mh.gob.sv, Contact: Rina 

Castellanos de Jarquin, Directora General de Inversion y Credito

Water, Sanitation and Flood Protection

(R)  Disaster  Risk  Management  Development  Policy  Loan  CAT 

DDO: The objective is to enhance the government’s capacity to im-

plement  its  disaster  risk  management  program  for  natural  disasters 

as part of its disaster risk management national framework. Project 

Concept Review Meeting completed on 2 September 2010. Decision 

Meeting  scheduled  for  15  November  2010.  Environmental Assess-

ment Category U. Project: P122640. US$ 50.0 (IBRD). No consultants 

are required. Ministerio de Hacienda, Blvd De Los Heroes No. 1231, 


PAGE 76 

Monthly Operational Summary  

OCTOBER 2010

Edificio Ministerio de Hacienda, San Salvador, El Salvador, Tel: (503-

22) 443002, Fax: (503-22) 257-491

Guatemala

Health and Other Social Services

(R)  Expanding  Opportunities  for  Vulnerable  Groups  (Ln. 

77830GT): The objective is to contribute to the Government’s strat-

egy to increase the use of education, health and rural infrastructure 

services by the extreme poor in the most vulnerable municipalities, 

by boosting their demand for those services and strengthening sec-

tor  capacity  to  deliver  them.  Signing  scheduled  for  30  November 

2010. Environmental Assessment Category B. Project: P107416. US$ 

114.5 (IBRD). Consultants will be required. Ministry of Finance and 

Economy,  8va Avenida  20-87,  Zona  1,  Edificio  Finanzas  Publicas, 

Guatemala City, Guatemala, Tel: (502) 2248-5029, Fax: (502) 2248-

5005, E-mail: lalejos@minfin.gob.GT, Contact: Juan Alberto Fuentes 

Knight, Minister



Industry and Trade

Download 2 Mb.

Do'stlaringiz bilan baham:
1   ...   21   22   23   24   25   26   27   28   29




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling