The world bank monthly operational summary


(R) Climate Change Development Policy (Ln. 79150-ID)


Download 1.7 Mb.
Pdf ko'rish
bet13/29
Sana07.03.2017
Hajmi1.7 Mb.
#1871
1   ...   9   10   11   12   13   14   15   16   ...   29

(R) Climate Change Development Policy (Ln. 79150-ID): The

objective is to support the Government in (a) achieving a lower car-

bon development path; (b) preparing for a post-2012 global climate

change regime; (c) setting up a conducive policy, regulatory and in-

stitutional setting; and (d) accessing global climate finance opportu-

nities and carbon markets. The loan was signed on 23 June 2010.

Environmental Assessment Category U. Project: P120313. US$ 200.0

(IBRD). Consultants will be required. Ministry of Finance, J1. Lapan-

gan Banteng Timur No. 2-4, Indonesia, Tel: (62-21) 384-1067, Fax: (62-

21) 380-8395, Contact: Maurin Sitorus, Director for Loan and Grant



(R) Mainstreaming Globally-Important Biodiversity Conser va-

tion in Production Forest: The objective is to conser ve globally sig-

nificant forest biodiversity by enhancing the sustainability of production

forest management through development of alternative non-timber

income sources. Pre-appraisal scheduled for 16 August 2010. Envi-

ronmental Assessment Category B. Project: P112419. US$ 3.3 (GEFU).

Consultants will be required. Burung Indonesia, Jl. Dadali 32, Bogor,

Indonesia, Tel: (62-251) 835-7222, Fax: (62-251) 835-7961, E-mail:

birdlife@burung.org, Contact: Listya Kusuma Wardhani, Director of

Development

(R) Sustainable Management of Agricultural Research and Tech-

nology Dissemination (SMAR TD): The objective is to strengthen

Indonesian Agency for Agriculture Research and Development

(IAARD)’s capacity to develop and disseminate international best prac-

tice technologies for improved agricultural productivity, profitability and



AUGUST 2010

Monthly Operational Summary

PAGE 35

sustainability, especially the dual role of IAARD in research and out-

reach to farmers. Decision Meeting scheduled for 15 October 2010. En-

vironmental Assessment Categor y B. Project: P117243. US$ 60.0

(IBRD). Consulting services to be determined. Agency for Agricultural

Research and Development, Jl. Ragunan No. 29, Pasar Minggu, In-

donesia, Tel: (62-21) 780-1242, Fax: (62-21) 780-0644, Contact: Dr. H.

Sumarjo Gatot Irianto, Director General



Education

(N) Research and Innovation in Science and Technology: The

objective is to create an enabling environment for research and de-

velopment in science and technology, and to strengthen the human re-

sources and per formance incentives of key public science and

technology institutes in Indonesia. Project Appraisal Document sched-

uled for 1 October 2010. Environmental Assessment Category C. Pro-

ject: P121842. US$ 95.0 (IBRD). Consulting services and implementing

agency(ies) to be determined.



(R) Life Skills Education for Employment and Entrepreneurship

(LSE3): The objective is to increase employment and earnings of dis-

advantaged youth (young women, drop outs, poor) through improved

market oriented skills training and entrepreneurship. Negotiations

scheduled for 28 September 2010. Environmental Assessment Category

C. Project: P100763. US$ 35.0 (IBRD). Consultants will be required.

Ministry of National Education, Directorate General of Non Formal and

Informal Education, E Building, 3rd Floor, Jl. Jend. Sudirman, Senayan,

Jakarta, Indonesia, Tel: (62-21) 572-5033, Fax: (62-21) 572-5487, Con-

tact: Dr. Hamid Muhammad, Director General, Non Formal and In-

formal Education



BOS Knowledge Improvement for Transparency and Account-

ability Additional Financing: The objectives are to: (a) improve the

usage of the Bantuan Operasional Sekolah (BOS) block grant to

schools by preparation improvement plans; (b) strengthen the super-

vision and monitoring mechanisms between schools and district edu-

cation offices; and (c) simplify the complaint resolution mechanisms

and linking these with service improvement. Bank Approval com-

pleted on 8 June 2010. Environmental Assessment Category C. Pro-

ject: P119125. US$ 500.0 (IBRD). Consultants will be required. Ministry

of National Education, Government of Republic of Indonesia, E Build-

ing, 5th Floor, Jln. Jend. Sudirman, Senayan, Indonesia, Tel: (62-21) 572-

5057, Fax: (62-21) 572-5606, E-mail: Bos@dit-plp.go.id, Contact: Prof.

Suyanto, Director General



Energy and Mining

(R) Geothermal Clean Energy Investment: The objective is to in-

crease the utilization of clean geothermal-based electricity in order to

reduce pollution and improve the environment. Pre-appraisal com-

pleted on 25 June 2010. Decision Meeting scheduled for 15 September

2010. Environmental Assessment Category A. Project: P113078. US$

500.0 (IBRD). Consulting services to be determined. Pertamina Ge-

othermal Energy (PGE), Menara Cakrawala Lantai, 15th Floor, Jl. MH

Thamrin no.9, Indonesia, Tel: (62-21) 3983-3222, Fax: (62-21) 3983-

3230, E-mail: info@pgeindonesia.com, Contact: Abadi Purnomo, Pres-

ident Director



(R) Power Transmission Development (Ln. 79400-ID): The ob-

jective is to provide support for PLN to strengthen and expand 4 ma-

jor 500 kV substations in Java-Bali and upgrade the 275kV systems from

Lahat to Kliranjao in Sumatra. Bank Approval completed on 8 July 2010.



Signing scheduled for 28 July 2010. Environmental Assessment Cate-

gory B. Project: P117323. US$ 225.0 (IBRD). Consultants will be re-

quired. PLN (Persero), Jl. Trunojoyo Blok MI/135, Jakarta, Indonesia,

Tel: (62-21) 726-1875/726-1122, Fax: (62-21) 722-1330, Contact: Djoko

Prasetijo, Deputy Director for System Planning

Extended Deployment of the PLN Enterprise Resource Planning:

The objective is to assist Pt. Perusahaan Listrik Negara (PLN) with the

extended deployment of the enterprise resource planning under Java-

Bali Power Sector Restructuring and Strengthening Project to integrate

the Business Units outside Java-Bali into one common business sys-

tems platform. Bank Approval completed on 8 June 2010. Environ-

mental Assessment Category C. Project: P116855. US$ 30.0 (IBRD).

No consultants are required. PLN (Persero), Jl. Trunojoyo Blok

MI/135, Jakarta, Indonesia, Tel: (62-21) 726-1875/726-1122, Fax: (62-

21) 722-1330, Contact: Setio Anggoro Dewo, Finance Director



Upper Cisokan Pumped Storage Power: The objective is to improve

the efficiency of the power generation system in Java-Bali through

the development of a Pumped Storage hydropower plan and the im-

plementation of an institutional and TA program to improve PNL’s

managerial and operational capabilities. Decision Meeting scheduled

for 20 September 2010. Environmental Assessment Category A. Pro-

ject: P112158. US$ 530.0 (IBRD). Consulting services to be deter-

mined. PLN (Persero), Jl. Trunojoyo Blok MI/135, Jakarta, Indonesia,

Tel: (62-21) 726-1875/726-1122, Fax: (62-21) 722-1330, Contact: Bam-

bang Praptono, Director for Planning and Technology



Industry and Trade

Hydrochlorofluorocarbon (HCFC) Phase-out in the Foam Sec-

tor: The objective is to assist Indonesia in meeting the HCFC phase-

out obligations in the foam sector to the Montreal Protocol. Project

Concept Review Meeting scheduled for 29 July 2010. Environmental

Assessment Category B. US$ 20.0 (MPIN). Consultants will be required.

Ministry of Environment, Otorita Batam Building A 6 th Floor, Jakarta,

Indonesia, Tel: (62-21) 858-0107, Fax: (62-21) 859-06678, E-mail: gem-

pur@menlh.go.id, Contact: Mohd. Gempur Adnan, Deputy Minister

for Environmental Pollution Control



Public Administration, Law, and Justice

(R) Local Government and Decentralization (Ln. 79140-ID): The

objective is to improve the usage (execution, effectiveness and deliv-

ery of outputs) of the specific Cetnral Government Capital (DAK)

Grants within sub-national governments (district governments, Kota

and Kabupaten). This project will be a pilot in five Provinces, to reim-

burse a portion of the DAK transfers. The loan was signed on 23 June



2010. Environmental Assessment Category B. Project: P111577. US$

220.0 (IBRD). Consultants will be required. Ministry of Finance, J. La-

pangan Banteng Timur 2-4, Jakarta, Indonesia, Tel: (62-21) 3435-7768,

350-9442, Fax: (62-21) 350-9443, Contact: Mr. Herry Purnomo, Acting

Director General of Fiscal Balance

(R) Seventh Development Policy Loan: The objective is to im-

prove investment climate, strengthen public financial management, and

enhance poverty alleviation and service delivery efforts. Project Con-

cept Review Meeting completed on 25 June 2010. Decision Meeting

scheduled for 22 October 2010. Environmental Assessment Category

U. Project: P117874. US$ 500.0 (IBRD). Consultants will be required.

Coordinating Ministr y for Economic Affairs, PAIK,Building,4th Fl

Ministry of Finance, Jl. Lapangan Banteng Timur No. 2-4, Pusat, In-

donesia, Tel: (62-21)345-6714, Fax: (62-21) 345-6817, E-mail: rizalluk-

man7@yahoo.com, Contact: Dr. Ir. Rizal Affandi Lukman, PhD Assistant

to Deputy Minister

Postgraduate and Non-degree Scholarship Program for Civil

Servants and Overseas Higher Education Institutions (HEI): The

objective is to support the provision of foreign and domestic degree

and non-degree programs for key staff in eligible government agen-

cies. Appraisal scheduled for 16 August 2010. Environmental Assess-

ment Category C. Project: P118150. US$ 100.0 (IBRD). Consultants will

be required. State Ministry for Planning and Development, Gedung

Asmen, 2nd Floor, Jl. Taman Suropati No. 2, Jakarta, Indonesia Tel/Fax:

(62-21) 314-8551, E-mail: dewobjp@bappenas.go.id, Contact: Mr. Dwi

Wahyu Atmaji, Director for State Apparatus

Strengthening Statistics: The objective is to support improved data

reporting and statistical capacity in Indonesia through the development

of a World Bank-financed Statistical capacity building program (STAT-

CAP). Decision Meeting scheduled for 2 September 2010. Environ-

mental Assessment Category C. Project: P106384. US$ 65.0 (IBRD).

Consultants will be required. Central Bureau of Statistics, Jl. Dr. Su-

tomo 6-8, Jakarta 10710, Indonesia, Tel: (62-21) 381-0291, Fax: (62-21)

385-7046, E-mail: bpshq@bps.go.id, Contact: Toto E. Sastrasuanda,

Deputy Director General

Transportation

(R) Road Asset Preser vation: The objective is to improve the us-

age (execution, effectiveness and deliver y of outputs) of the road

preservation allocations within DGH. Project Concept Review Meet-


PAGE 36

Monthly Operational Summary

AUGUST 2010

ing scheduled for 13 December 2010. Environmental Assessment Cat-

egory C. Consulting services and implementing agency(ies) to be de-

termined.



Aceh Infrastructure Ser vices Strengthening: The objective is to

facilitate post-disaster economic recovery and development in Aceh:

(i) by expanding priority roads, flood control and water supply infra-

structure; and (ii) strengthen the capacity of local government to plan,

implement, and operate and maintain infrastructure assets in a sus-

tainable manner. This project is on hold until further notice. Environ-

mental Assessment Category B. US$ 35.0 (ACEH). Consulting services

to be determined. Ministry of Public Works, MPW, Jl.Pattimura No.20,

Kebayoran Baru, Jakarta Selatan 12110, Indonesia, Tel: (62-21) 7279-

6158, Fax: (62-21) 7279-6155, E-mail: suryaningsih25@hotmail.com



Western Indonesia National Roads Improvement: The objective

is to sustain regional economic competitiveness and social well-being

by upgrading substandard roads that have been reclassified as na-

tional and strategic roads to the required national standards and by elim-

inating traffic bottlenecks along strategic and national roads and to

enhance road sector management capacity. Decision Meeting sched-

uled for 4 October 2010. Environmental Assessment Category A. Pro-

ject: P090990. US$ 80.0 (IBRD). Consultants will be required. Ministry

of Public Works, Jl. Pattimura No. 20, Jakarta Selatan, Indonesia, Tel:

(62-21) 720-0281, Fax: (62-21) 720-1760, Contact: Taufik Widjoyono, Di-

rector of Planning, Directorate General of Highways

Water, Sanitation and Flood Protection

(R) Fourth Infrastructure Development Policy Loan: The objectives

are to: (a) increase the quantity and efficiency of central government

spending on infrastructure by improved public service obligation (sub-

sidy) policy, and expenditure planning and budgeting; and (b) im-

prove sub-national infrastructure service through increased sub-national

government spending and an improved incentives framework. Project



Concept Review Meeting completed on 25 June 2010. Decision Meeting

scheduled for 23 September 2010. Environmental Assessment Cate-

gory U. Project: P118531. US$ 200.0 (IBRD). Consulting services to

be determined. Coordinating Ministry for Economic Affairs, PAIK,Build-

ing,4th Fl Ministry of Finance, Jl. Lapangan Banteng Timur No. 2-4,

Pusat, Indonesia, Tel: (62-21)345-6714, Fax: (62-21) 345-6817, E-mail:

rizallukman7@yahoo.com, Contact: Wahyu Utomo, Ministry of Fi-

nance

(R) Infrastructure Guarantee Fund: The objective is to help strengthen

the institutional capacity of the Infrastructure Guarantee Fund as a sin-

gle window for appraising infrastructure public-private partnership sub-

projects requiring Government of Indonesia guarantees, and providing

the eligible subprojects with appropriate guarantee support. Decision

Meeting scheduled for 30 July 2010. Environmental Assessment Cate-

gory A. US$ 510.0 (IBRD). Consultants will be required. Indonesia In-

frastructure Guarantee Fund, Sampoerna Strategic Square, South

Tower, 14th Floor, Jl, Jenderal Sudirman Kav Indonesia, Contact:

Sinthya Roesly, President Director

(R) Second Water Resources and Irrigation Sector Manage-

ment: The objective is to further improve the sector governance and

management capacity, water resources and irrigation management

performance and sustainability, as well as irrigated agriculture pro-

ductivity in the Project provinces and river basins. Decision Meeting



scheduled for 20 September 2010. Environmental Assessment Cate-

gory B. Project: P114348. US$ 100.0 (IBRD). Consulting services to

be determined. Ministry of Public Works, Jl. Pattimura No. 20, Jakarta

Selatan, Indonesia, Tel: (62-21) 720-0281, Fax: (62-21) 720-1760, Con-

tact: Ir. Hartoyo Supriyanto, M. Eng, Director and Secretary of NPMU

WISMP and NTB



(R) Third National Program for Community Empowerment in

Rural Areas (Ln. 78670-ID): The objective is to support PNPM in

2010 and 2011 nation-wide, allowing the GoI to firm up plans for fur-

ther decentralized and institutionalization of its primer community

poverty alleviation program and permit larger block grant investment

funds for the poorest third of all sub-districts. The loan was signed on

9 April 2010. Environmental Assessment Category B. Project: P115052.

US$ 785.0 (IBRD). No consultants are required. DG Community and

Village Empowerment - Ministry of Home Affairs (MOHA), Jl. Raya

Pasar Minggu km 19, Jl. Medan Merdeka Utara No. 7, Indonesia, Tel:

(62-21) 794-2373, Fax: (62-21) 794-2374, E-mail: ppkpmd@yahoo.com,

Contact: Dr. Ayip Muflich, SH, MSi, Director General



(R) Water Supply Output Based Disbursement: The objectives

are to assist the Government to implement policies in increasing lo-

cal government investments to improve and to expand sustainable

water supply and sanitation services for urban population, especially

for the poor. Project Concept Review Meeting scheduled for 17 December

2010. Environmental Assessment Category B. Consultants will be re-

quired. Ministry of Public Works, Directorate General of Human Set-

tlements, Jl. Pattimura No. 20, Jakarta Selatan, Indonesia, Tel: (62-21)

7279-6158, Fax: (62-21) 7279-6155



Jakarta Urgent Flood Mitigation: The objectives are to introduce

improved Operations and Maintenance practices in four pilot areas: (a)

Dredging, modern technology and best practice; (b) Environmental,

responsible sludge disposal; (c) Social, equitable resettlement practices;

and (d) Institutional, coordinated routine maintenance planning and

practice. Decision Meeting scheduled for 25 August 2010. Environmental

Assessment Category A. Project: P111034. US$ 150.0 (IBRD). Con-

sulting services to be determined. Ministry of Public Works, Jl. Pat-

timura 20, Jakarta, Indonesia, Tel: (62-21) 726-2366, Fax: (62-21)

726-1292, E-mail: suryaningsih25@hotmail.com, Contact: Ir. Widagdo,

Director for River, Lake and Reservior/Head of PMU, DGWR,MPW

Kiribati

Public Administration, Law, and Justice

(R) Adaptation Phase III: The objective is to implement climate adap-

tation and disaster risk reduction priority measures. Project Concept Re-



view Meeting completed on 25 June 2010. Decision Meeting scheduled

for 15 October 2010. Environmental Assessment Category B. US$ 3.0

(GEFU). Consulting services and implementing agency(ies) to be de-

termined.

Transportation

Road Rehabilitation: The objective is to improve the condition of the

Kiribati paved road network and to establish sustainable management

and financing of road maintenance. Preparation is underway. Envi-

ronmental Assessment Category B. Project: P122151. US$ 10.0/10.0/1.1



(IDA Credit/ASDB/GNEZ). Consultants will be required for: (a) de-

sign and supervision of the civil works, (b) road traffic, (c) safety ac-

tion plan, (d) micro-enterprises for road maintenance, and (e) sustainable

financing and management of road maintenance. Ministry of Public

Works and Utilities, Kiribati, Kiribati

Lao People’s Democratic Republic

Education

Catalytic Fund EFA/FTI: The objective is to improve access to and

quality of pre-primary and primary education together with strength-

ening of the related planning and management processes of the sec-

tor required to achieve EFA and MDG2. Negotiations scheduled for

30 July 2010. Environmental Assessment Category C. Project: P114609.

US$ 30.0 (EFAF). Consultants will be required. Ministry of Education,

Lanexang Avenue, Vientiane, Lao People’s Democratic Republic, Tel:

(856-21) 216-004, Fax: (856-21) 212-108, E-mail: sengsomphonep@ya-

hoo.com, Contact: Sengspmphone Viravouth, Director General

Third Education Development: The objective is to support the gov-

ernment of Lao PDR to implement the National Holistic Early Child-

hood Development. Project Concept Review Meeting scheduled for 14

September 2010. Environmental Assessment Category C. US$ 6.0/9.0

(IDA Credit/IDA Grant). Consulting services to be determined. Min-

istry of Education, Lane Xang Avenue, Vientiane, Lao People’s De-

mocratic Republic, Tel: (856-21) 243-672, E-mail: edpiimoe@laotel.com,

Contact: Sengomphone Viravouth, Director General



Energy and Mining

(N) AUSAID Rural Electrification Phase I Additional Financing:

The objective, same as the parent project, is to support scale-up of the

expected outputs and outcomes of the impacts of the Rural Electrifi-

cation Phase I. Negotiations are underway. Environmental Assess-

ment Categor y B. Project: P119715. US$ 9.4 (4HME). Consulting


AUGUST 2010

Monthly Operational Summary

PAGE 37

services will be required for procurement. Electricité du Laos, Nong-

bone Road, PO Box 309, Lao People’s Democratic Republic, Tel: (856-

21) 415-099, Fax: (856-21) 415-039, E-mail: edlpj@laotel.com, Contact:

Gnanhkham Douangsavanh, Project Manager. Ministry of Energy

and Mines, Nongbone Road, Vientiane, Lao People’s Democratic Re-

public, Tel/Fax: (856-21) 415-714, E-mail: solarred@laotel.com, Con-

tact: Elvin Rustamov, PIU Director



(R) Rural Electrification APL Program Phase II-GEF: The ob-

jective is to support the Ministry of Energy and Mines (MEM) and

Electricite du Laos (EdL) in promotion of energy efficiency as well as

renewable energy development to support rural electriciation. Nego-

tiations scheduled for 23 August 2010. Environmental Assessment

Category B. Project: P117177. US$ 3.0 (GEFU). Consultants will be re-

quired for implementation supervision of demand-side management

and energy efficiency promotion, system loss reduction; management

of micro-hydro, biomass and solar energy development for rural elec-

trification. Consulting service will include feasibility study and imple-

mentation supervision of biomass generation projects. Electricite du

Laos, Nongbone Road, PO Box 309, Lao People’s Democratic Repub-

lic, Tel: (856-21) 415-099, Fax: (856-21) 415-039, E-mail: edlpj@lao-

tel.com, Contact: Gnanhkham Douangsavanh, Project Manager.

Ministry of Energy and Mines, PO Box 4708, Nong Bone Road, Vi-

entiane, Lao People’s Democratic Republic Tel/Fax: (856-21) 415-714,

E-mail: anousak_pv@yahoo.com, Contact: Elvin Rustamov, PIU Di-

rector


Industry and Trade

(R) Sixth Poverty Reduction Support (Cr. H5970-LA): The ob-

jective is to assist the Government of Lao PDR in implementation of

the 6th National Social Economic Development Plan (2006-2010). The

grant was signed on 1 July 2010. Environmental Assessment Category

U. US$ 20.0 (IDA Grant). No consultants are required. Ministry of Fi-

nance, 23 Singha Rd Xaysettha District, Post Box No. 46, Vientiane Cap-

ital, Lao People’s Democratic Republic Tel/Fax: (856-21) 412-142,

E-mail: thip61@yahoo.com, tchantha@mof.gov.la, Contact: Mrs. Thip-

phakone Chanthavongsa, Director General



Download 1.7 Mb.

Do'stlaringiz bilan baham:
1   ...   9   10   11   12   13   14   15   16   ...   29




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling