nancing: The objective is to scale up of the existing PFMAP to ac-

commodate support for enhanced capacity building and systems

implementation for Accounting, Financial Management and Procure-

ment reform including the provision of funding for the Independent

Procurement Agent. Project Concept Review Meeting scheduled for

30 June 2010. Environmental Assessment Category C. US$ 11.0 (IDA

Grant). Consultants will be required. Ministry of Economy and Fi-

nance, St 92, Sangkat Wat Phnom, Khan Daun Penh, Phnom Penh, Cam-

bodia, Tel: (855-23) 722-964, Fax: (855-23) 430-745, E-mail: rcs.mef@

online.com.kh, Contact: Dr. Sok Saravuth, Budget Director



Second Public Financial Management: The objective is to strengthen

the Public Financial Management/Public Administration including

Budget Formulation, Budget Execution, Accounting and Financial Re-

porting, External Audit and Oversight as well as complementary Ca-

pacity Building and Human Resource Development. Project Concept

Review Meeting scheduled for 30 June 2010. Environmental Assess-

ment Category C. US$ 13.5 (IDA Credit). Consultants will be required.

Ministry of Economy and Finance, 92, Phnom Penh, Cambodia, Tel:

(855-23) 722-964, Fax: (855-23) 430-745, E-mail: rcs.mef@online.com.kh,

Contact: Dr. Saravuth Sok, Manager of Steering Committee Secre-

tariat

Transportation

(R) Second Rural Investment and Local Governance: The objective

is to broaden from the commune-level rural investment and local gov-

ernance support initiated under the predecessor project to the district

level using the new institutional framework established under the re-

cently promulgated Organic Law on Decentralization and Deconcen-

tration. Project Concept Review Meeting scheduled for 15 June 2010.

Environmental Assessment Category B. Project: P096505. US$ 40.0 (IDA

Credit). Consulting services to be determined. NCDD Secretariat,

Ministry of Interior, 275 Norodom Boulevard, Khan Chamkarm, Ph-

nom Penh, Cambodia, Tel: (855-23) 361-900, 362-175, Fax: (855-23)

724-419, E-mail: info@ncdd.gov.kh; chhieng.yanara@crdb.gov.kh, Con-

tact: H.E. Chhieng Yanara, Director, NCDD Program Support Team



(R) Typhoon Ketsana Emergency Recovery: The objective is to re-

store the level of services in a sustainable manner in selected community

infrastructure in the Typhoon Ketsana affected areas as part of post

disaster reconstruction and rehabilitation for the Government of Cam-

bodia. Decision Meeting scheduled for 25 May 2010. Environmental

Assessment Category B. Project: P121075. US$ 40.0 (IDA Credit).

Consulting services to be determined. Ministry of Rural Development,

Corner Russian Blvd. Street 169, Phnom Penh, Cambodia, Tel: (855-

12) 938 072, Fax: (855-23) 426-823 or 844-160, E-mail: wbpiu2_prip@cam-

net.com.kh, Contact: Mr. Sao Chivoan, Secretary of State



Water, Sanitation and Flood Protection

(R) Second Provincial and Peri-Urban Water Supply: The objective

is to expand the water supply and sanitation infrastructure services in

peri-urban and rural areas in fulfilling the Millennium Development

Goals (MDG) by 2015. This project is on hold until further notice. En-

vironmental Assessment Category B. US$ 15.0 (IDA Credit). Con-

sulting services and implementing agency(ies) to be determined.



China

Agriculture, Fishing, and Forestry

(N) Ningxia Desertification Control and Ecological Protection:

The objective is to improve the demonstration and extension of inno-

vative models, the ecological environment on the Eastern Bank of the

Yellow River in Ningxia Hui Autonomous Region of China. Project

Concept Review Meeting scheduled for 22 June 2010. Environmental

Assessment Category B. US$ 80.0 (IBRD). Consultants will be re-

quired. Ministry of Finance, PRC, China

(R) Henan Yellow River Ecological Livestock: The objective is to

address animal waste management on medium sized beef and dairy

farms in Hunan. Negotiations completed on 20 April 2010. Bank Approval

scheduled for 27 May 2010.

Environmental Assessment Category B.

Project: P100455. US$ 80.0 (IBRD). Consultants will be required. Gov-

ernment of Henan, Henan Provincial Bureau of Animal Husbandry,

Zhengzhou, Henan, China, Tel: (86-371) 6577-8978, Fax: (86-371) 6577-

8979, E-mail: 13837131366hn@163.com, Contact: Mr. Yuntao Zhang,

Director of PMO

(R) Integrated Forestry Development: The objective is to demon-

strate sustainable management and operation models for multifunction

forest plantations with significant public goods benefits. Negotiations

scheduled for 20 May 2010. Environmental Assessment Category B.

Project: P105872. US$ 100.0 (IBRD). No consultants are required.

State Forestry Administration, 18 East Street, Hepingli, China, Tel: (86-

10) 8423-9030, Fax: (86-10) 6421-7796, E-mail: pmcsfa@forestry.gov.cn,

Contact: Mr. An Fengjie, Director of WB Loan Project Management

Center

(R) Second Water Conservation: The objectives are: (a) to increase

farmer income (b) to promote sustainable use of water resources with

reduced water consumption for irrigation, and (c) to mitigate and adapt

the impact of global climate change on irrigated agricultural production

with added adaptive technologies and measures. Preappraisal is

underway.

Environmental Assessment Category B. US$ 80.0 (IBRD).

Consulting services to be determined. Ministry of Water Resources,

Ningzia, Shanxi and Hebei Provinces, Beijing, China, Tel: (86-10) 6320-

2127, E-mail: liubin6@mwr.gov.cn, Contact: Mr. Bin Liu, Director of

PMO


(R) Shandong Ecological Afforestation (Ln. 78820-CN): The ob-

jective is to improve the environmental conditions of Shandong’s most

fragile land areas through afforestation by: (a) stabilizing the fragile

conditions of the alluvial land areas; (b) reducing soil and water ero-

sion of some degraded mountainous areas; and (c) stabilizing sandy

soils. Signing scheduled for 30 August 2010. Environmental Assessment

Category B. Project: P112759. US$ 60.0 (IBRD). Consultants will be

required. Shandong Provincial Forestry Department, Mr. Jia Gang, Di-

rector PMO, No. 42 Wenhua East Road, China, Tel: (86-531) 8855-

7700, Fax: (86-531) 8855-7747, 8856-2506, E-mail: guanghuaqin@163.

com, Contact: Sun Yugang, Director of Project Management Office

(R) Sichuan Wudu Irrigated Agriculture Development: The ob-

jectives are to: (a) increase farmers’ irrigated agricultural incomes by

increasing the land under irrigation and by providing a more reliable

water supply for drought protection; and (b) provide a complementary

package of integrated agricultural inputs, support services, adaptive

research, training and technical assistance. Project Concept Review



Meeting is scheduled in mid-May 2010.

Environmental Assessment

Category A. US$ 100.0 (IBRD). Consulting services and implement-

ing agency(ies) to be determined.



(R) Sustainable Development in Poor Rural Areas: The objectives

are to: (a) provide the poorest villages and households with the poverty

reduction measures and assistance that they believe are most needed,

(b) improve the well-being of rural migrants living in urban areas, and

(c) help rural communities to identify and analyze climate change

adaptation risks. Negotiations completed on 15 April 2010. Bank Ap-



proval scheduled for 10 June 2010.

Environmental Assessment Cate-

gory B. Project: P099751. US$ 100.0 (IBRD). Consultants will be

required. Foreign Capital Project Management Center, 25 Floor, Tower

A, Disan Zhiye (Dongyu), Shuguang Xili,Jia 1, Chaoyang District, Bei-

jing, China, Tel: (86-10) 8261-7155, Fax: (86-10) 8261-7165, E-mail:

fcpmc@public2.bta.net.cn, Contact: Xia Gengsheng, Deputy Director


PAGE 28

Monthly Operational Summary

JUNE 2010

(R) Sustainable Development in Poor Rural Communities-GEF:

The objective (an integral component of Sustainable Development in

Poor Rural Areas Project) is to demonstrate improved sustainable land

management through innovative community pilots addressing vul-

nerability to climate change in poor rural areas for introduction and

mainstreaming into the main project’s CDD approach. Negotiations com-



pleted on 15 April 2010. Bank Approval scheduled for 10 June 2010.

En-


vironmental Assessment Category B. Project: P101844. US$ 4.3 (GEFU).

Consultants will be required. Ministry of Agriculture, 25 Floor, Tower

A, Disan Zhiye Building, Shuguang Xili, Jia 1 Chaoyang District, Bei-

jing, China Tel/Fax: (86-10) 6500-3273, E-mail: fcpmc@public2.bta.net.cn,

Contact: Xia Gengsheng, Deputy Director

(R) Xinjiang Turfan Water Conservation: The objective is to improve

water allocation in consumptive use terms to increase overall water pro-

ductivity and promote sustainable use of water resources in the arid

Turpan Basin of Xinjiang Uygur autonomous Region. Negotiations



completed on 12 May 2010. Bank Approval scheduled for 17 June 2010.

Environmental Assessment Category A. Project: P111163. US$ 100.0

(IBRD). Consultants will be required. Government of Xinjiang Uygur

Autonomous Region, China, Tel: (86-995) 625-5579, Fax: (86-995) 625-

5289, E-mail: yyx.ycj@126.com, Contact: Cao Peiwu, Director of PMO

Sustainable Management and Biodiversity Conser vation of the

Lake Aibi Basin: The objectives are to provide management strate-

gies and mechanisms to: (a) restore the Basin’s productive and pro-

tective functions; (b) conserve its wetland ecosystems; and (c) restore

its ecological functions and measureable reductions of land degrada-

tion. Decision Meeting scheduled for 30 July 2010. Environmental As-

sessment Category B. US$ 3.6 (GEFU). Consultants will be required.

PRC-GEF Partnership for Land Degradation in Dryland Ecosystems,

(GEF-OP12), No. 12 Heilongjiang Road, Urumqi, China, E-mail: Xin-

jiang@gefop12.cn, Contact: Xiaoshou Yan, National Project Director.

Xinjiang Project Executive Office, No. 12 Heilongjiang Road, Urumqi,

Tel: (86-991) 581-8587, Fax: (86-991) 581-3241, E-mail: Xinjiang@ge-

fop12.cn


Education

(R) Second Liaoning and Shandong-Technical and Vocational Ed-

ucation and Training: The objective is to support demand-driven de-

sign investments in Technical and Vocational Education and Training

(TVET) in Liaoning and Shandong Provinces. Negotiations completed

on 22 April 2010. Bank Approval scheduled for 1 June 2010.

Environ-


mental Assessment Category C. Project: P117107. US$ 40.0 (IBRD).

Consultants will be required.

Ministry of Finance, San Li He Lu, China,

Tel: (86-10) 6855-1124, Fax: (86-10) 6855-1125, E-mail: Mofhansu@gmail.

com, Contact: Ms. Han Su, Deputy Director



Energy and Mining

(N) Technology Needs Assessment: The objective is to enhance

China’s capacity to identify and prioritize climate mitigation and adap-

tation technology needs, and to create a stronger enabling environment

for the accelerated transfer, development and deployment of the pri-

oritized technologies. Preparation scheduled for 21 June 2010. Envi-

ronmental Assessment Category C. US$ 5.0 (GEFU). Consultants will

be required to provide support for four preparation studies (TORs

ready and available on demand) and will be covered by budget from

the World Development Report (WDR). National Development and Re-

form Commission, Beijing, China



(R) Energy Efficiency Promotion in Industry: The objective is to

improve energy efficiency and reduce greenhouse gas (GHG) emis-

sions in key industrial sectors in China by addressing both the man-

agement and technical aspects of rational use of energy. Project Concept

Review Meeting scheduled for 17 May 2010. Environmental Assess-

ment Category C. US$ 4.0 (GEFU). Consulting services to be deter-

mined. Ministry of Industry and Information Technology, 13 West

Chang An Ave., Beijing, China, Tel: (86-10) 6601-7131, Fax: (86-10) 6601-

2611, Contact: Yang Tiesheng, Deputy Director General

(R) Inner Mongolia Biomass Heat and Power: The objective is to

provide clean power and heating services to the residents of Xing’an

Meng in Inner Mongolia. This project is on hold until further notice. En-

vironmental Assessment Category B. US$ 30.0 (IBRD). Consultants

will be required. Beijing Fanfuchun Forest Resource Development

Company, 1 Floor Shuguang Mansion Tower C. No. 5, Jingshun Road,

Chaoyang District, Beijing 100028, China, Tel: (86-10) 8449-0444, Fax:

(86-10) 8449-0370



(R) Provincial Energy Efficiency Scale-up Program: The objec-

tive is to achieve energy savings through strengthening suitable provin-

cial level policies, institutional and financial mechanisms in Shandong,

Shanxi and Jiangxi Provinces. Decision Meeting scheduled for 29 July



2010.

Environmental Assessment Category C. Project: P114182. US$

13.4 (GEFU). Consulting services to be determined. Shandong Provin-

cial Energy Saving Office, No. 1 of Shengfu Qianjie, Lixia District, Ji-

nan City, China, Tel: (86-531) 8692-0176, Fax: (86-531) 8612-0571,

E-mail: Liangzj111@sohu.com, Contact: Zhao Xudong, Director. Shanxi

Project Management Office, Shanxi Provincial Finance Bureau, No.

345 of Yingze Street, Taiyuan City, China, Tel: (86-351) 202-4908, Fax:

(86-351) 404-5332, E-mail: lsr6080@126.com, Contact: Wang Yanming,

Director. Jiang Xi Project Management Office, No. 1 of North 1 Rd,

Provincial Gov Cpd, Jiangxi Provincial Energy-Conservation, Nan-

chang, China, Tel: (86-791) 621-7040 Ext:8003, Fax: (86-791) 623-9184,

E-mail: jxjianceke@yahoo.com.cn, Contact: Wan Shengqing, Director

(R) Second Energy Efficiency Financing: The objective is to scale-

up commercial debt financing for energy efficiency (EE) investment

across China through an EE financing debt facility (the Facility) to be

created and managed by Minsheng Bank. Negotiations completed on



12 May 2010. Bank Approval scheduled for 22 June 2010.

Environmental

Assessment Category F. Project: P113766. US$ 100.0 (IBRD). Con-

sultants will be required. China Minsheng Banking Corp. Ltd., No 2,

Fuxingmennei Ave., Xicheng Distric, Beijing, China, Tel: (86-10) 5912-

3680, Fax: (86-10) 5978-1198, Contact: Mr. Minghui Huang, General

Manager, Trade Finance Department

(R) Shandong Energy Efficiency: The objective is to achieve energy

savings through (a) investments in selected projects in Shandong

Province and (b) strengthening suitable provincial level policies, in-

stitutional and financial mechanisms in Shandong, Shanxi and Jianxi

Provinces. Decision Meeting scheduled for 28 May 2010. Environmental

Assessment Category A. Project: P114069. US$ 140.0 (IBRD). Con-

sulting services and implementing agency(ies) to be determined.

(R) Urumqi District Heating: The objective is to develop the co-

generation central heating, make effective use of energy, to save en-

ergy and reduce emission and meliorate the environment in Urumqi.

Project Concept Review Meeting scheduled for 17 May 2010.

Environ-


mental Assessment Category U. US$ 100.0 (IBRD). Consultants will

be required. Beijing Gas and Heating Engineering Design Institute,

No. 40A, Xiaojiangfang Hutong, Xidan Beidajie, Beijing, China, Tel: (86-

10) 6606-9691, Fax: (86-10) 6601-7385, E-mail: chjun@gasheat.com.cn,

Contact: Mr. Jia Zheng, Chief Designer

Integrated Gasification Combined Cycle Clean Power Develop-

ment: The objective is to support China’s strategy to develop com-

mercial-scale integrated gasification combined-cycle (IGCC) clean coal

power plants and demonstrate the feasibility of carbon capture and se-

questration (CCS). Preparation is on hold until Government’s approval.

Environmental Assessment Category A. US$ 200.0/10.0 (IBRD/GFCO).

Consulting services to be determined. China Power Investment Cor-

poration, Building 3, No. 28, Financial Street, Xincheng District, Bei-

jing, China, Tel: (86-10) 6629-8000, Fax: (86-10) 6629-8957, Contact:

Xiaolu Zhang, Vice President

Shanxi Energy Efficiency: The objective is to support good energy

efficiency practice in the key energy transformation process and in-

dustrial energy consumption processes, and developing the needed in-

stitutional capacity and policy framework to sustain energy saving

over the long term in Shanxi province. Identification scheduled for 12

July 2010. Environmental Assessment Category A. US$ 300.0 (IBRD).

Consulting services to be determined. Shanxi Hepo Generation, 659

South Street, Yangquan City, China, Tel: (86-353) 226-2568, Contact:

Yin Baohong, Vice General Manager

Sino-Singapore Tianjin Eco-City GEF: The objective is to assist Sino-

Singapore Tianjin Eco-City Administrative Committee to introduce in-

tegrated planning and management approach in development and

implementation. The retroactive financing scheme would be applied

to a part of the green building pilot investment up to the maximum ceil-

ing of US$1.2 million. Negotiations scheduled for 3 June 2010. Envi-

ronmental Assessment Category B. Project: P098915. US$ 6.2 (GEFU).

Consultants will be required. Tianjin Finance Bureau, Tianjin Munic-



JUNE 2010

Monthly Operational Summary

PAGE 29

ipality, Tianjin, People’s Republic of China, No.4, Qufudao Rd., Hep-

ing District, Tianjin, China, Tel: (86-22) 233-0374, Fax: (86-22) 233-

1148, Contact: Mr. Zhang Jiliang, Director



Health and Other Social Services

Guangdong Urban-Rural Social Policy Integration: The objec-

tives are to: (a) develop social security system; and (b) reduce urban-

rural differentials in training opportunities by innovative mechanisms

for skill training for rural/migrant workers, enhancement of the train-

ing capacity, and improving training quality. Project Concept Review

Meeting scheduled for 28 May 2010. Environmental Assessment Cat-

egory C. US$ 80.0 (IBRD). Consulting services to be determined.

Ministry of Finance, No. 3, Nan San Xiang, San Li He, Beijing, China,

Tel: (86-10) 6855 1124, Fax: (86-10) 6855 1125, Contact: Yanning Wang,

Division Director



Industry and Trade

(R) Jilin Food Safety (Ln. 78990-CN): The objective is to improve

food quality and safety in Jilin Province by investing in laboratories,

water supply system, and providing medium-term loans to small and

medium enterprises to expand the production of safe, high-quality

food. Bank Approval completed on 13 May 2010. Environmental As-

sessment Category B. Project: P101716. US$ 100.0 (IBRD). Consultants

will be required for Agriculture and Food Safety. Jilin Provincial Office

for Comprehensive Agricultural Development, Jilin Provincial De-

partment of Finance, 3646 Remin Dajie, Changchun, China, Fax: (86-

431) 855-0972, Contact: Dailiang Liang, Deputy Director



Hydrochlorofluorocarbon (HCFC) Phase-Out Stage I: The objective

is to assist China in meeting its HCFC phase-out obligations to the Mon-

treal Protocol. Those obligation are a production and consumption

freeze in 2013 (defined as production and consumption equal to the

baseline average of 2009 and 2010), and a 10 percent reduction below

the baseline by 2015. Project Concept Review Meeting scheduled for

20 May 2010. Environmental Assessment Category B. US$ 250.0

(MPIN). Consulting services and implementing agency(ies) to be de-

termined.

Public Administration, Law, and Justice

(R) Integrated Rural Economic Development of Demonstration

Towns and Counties: The objectives are to: (a) combine the con-

struction of township and public infrastructure with rural conducive

industrial development; and (b) combine provision of employment op-

portunities for migrants with skills training and capacity building, as

well as combine central budgetary allocation. Project Concept Review

Meeting scheduled for 30 September 2010.

Environmental Assessment

Category B. US$ 200.0 (IBRD). Consulting services and implement-

ing agency(ies) to be determined.



(R) Shandong Confucius and Mencius Culture Heritage Protection

and Development: The objective is to assist Shandong Province in

increasing economic opportunities for local communities through im-

proved heritage protection and interpretation, and sustainable tourism

development. Project Concept Review Meeting scheduled for mid-May



2010.

Environmental Assessment Category B. US$ 50.0 (IBRD). Con-

sulting services and implementing agency(ies) to be determined.

Transportation

Anhui Medium Cities Urban Transport (Ln. 78810-CN): The ob-

jective is to improve mobility on selected main corridors of the mu-

nicipalities of Anqing, Huaibei, Lu’an and Wuhu in Anhui Province of

the Borrower in a safe and efficient manner. Bank Approval scheduled

for 20 May 2010. Environmental Assessment Category B. Project:

P111421. US$ 100.0 (IBRD). Consultants will be required. Anhui Provin-

cial Housing and Urban-Rural Development Department, No. 28, Huan

Cheng Nan Lu, Hefei, Anhui Province, China, Tel: (86-551) 287-1256,

Fax: (86-551) 263-9845, E-mail: liubending@163.com, Contact: Zhou

Yuanlou, Deputy Director, Planning and Financial Division



(R) Anhui Shaying River Channel Improvement: The objective is

to improve the transport infrastructure capacity, efficiency and envi-

ronmental performance of the inland waterway transport (IWT) that

serves the industries of the Shaying River Basin. Decision Meeting



scheduled for 18 August 2010.

Environmental Assessment Category A.

Project: P118647. US$ 100.0 (IBRD). Consulting services to be deter-

mined. Anhui Provincial Communications Department, 8th Floor,

Huayi Mansion, No. 95 Shouchun Road, Hefei, China, Tel: (86-551) 262-

9089, Fax: (86-551) 263-0290, E-mail: apcdpeo@vip.163.com, Contact:

Jie Luo, Deputy Director


Download 1.58 Mb.

Do'stlaringiz bilan baham:
1   ...   6   7   8   9   10   11   12   13   ...   28




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling