PROJECT

BRIEF


Lineville Road 

(County M)

Interchange

Schedule: 

June 2013 through May 2015

Location: 

Lineville Road (County M) and I-41 

Brown County

About the I-41 Project:

Construction work on the I-41 Project 

will span over 14 miles in Brown 

County from 2010-2017, and 17 miles 

of highway in Winnebago County 

from 2009-2014.

The project includes: 

•  traffic lanes expanded from four

  to six or more lanes depending on

  the location

•  reconstruction of 13 interchanges

•  improvements to 16 interchanges

•  40 roundabouts

•  17 traffic cameras installed

•  widening the Lake Butte des Morts 

Causeway to eight lanes, plus a 

bike/pedestrian trail with fishing 

access


Questions?

•  Visit the project website:



US41wisconsin.gov

The interchange at Lineville Road 

(County M) in Brown County will 

be reconstructed to improve safety, 

increase capacity and improve traffic 

operations. The bridge will also be 

raised to provide greater vertical 

clearance over I-41. The entrance 

ramps will be rebuilt, and the exit 

ramps will be reconstructed as two-

lane ramps. In addition, I-41 will be 

expanded to six lanes, plus auxiliary 

lanes, from approximately Lineville

Road to the south.

The Lineville Road work will include:

•  Constructing roundabouts at the 

northbound and southbound ramp 

terminals, and at the intersections 

of Lineville Road with East



Deerfield Avenue and West

Deerfield Avenue.

•  Expanding Lineville Road to four 

lanes through interchange area.

•  Constructing a free-flow right-turn 

lane for eastbound traffic at the 

I-41 southbound entrance ramp 

terminal.

Lineville Road (County M) Interchange 

Project Construction Timeline June 2013 through May 2015

PB25v6


(See other side for Traffic Impacts)
background image
Lineville Road 

interchange

s

t

2



he interchange,

A

2015



Major construction activities

are complete; finish work will

continue into 2015.

ugu t - Oc ober  014

T

including access



across I-41 and the

intersections of east

and west Deerfield

Avenue, will CLOSE

for 60 days between

August - October 2014. 



TRAFFIC 

IMPACTS