Official use only


(R) Third VIGISUS Disease Surveillance and Control


Download 1.27 Mb.
Pdf ko'rish
bet27/30
Sana15.12.2019
Hajmi1.27 Mb.
1   ...   22   23   24   25   26   27   28   29   30

(R) Third VIGISUS Disease Surveillance and Control: The ob-

jectives are to: (i) reduce mortality and morbidity from communica-

ble and non-communicable diseases and exposure to risk factors

associated with ill health, and (ii) improve the health outcomes of in-

digenous populations. Appraisal completed on 4 May 2010. Negotiations

tentatively scheduled for mid-July 2010.

Environmental Assessment Cat-

egory B. Project: P101518. US$ 100.0 (IBRD). Consultants will be re-

quired. Secretaria de Vigilancia em Saude (SVS), Esplanada dos

Ministerios, Edificio Sede, 1er Andar, Sala 105 CEP 70058-900, Brasilia,

DF, Brazil, Tel: (55-61) 3226-2163, E-mail: regina.mello@saude.gov.br,

Contact: Regina Coelli de Mello, Secretaria

Indigenous Peoples Sustainable Development: The objective is

to improve the protection, conservation and sustainable development

of indigenous lands with respect to indigenous peoples and natural re-

sources. Project preparation is underway. Environmental Assessment

Category B. US$ 40.0/11.5 (IBRD/KFW). Consultants will be required

for both the Bank and KfW have contracted consultancies to assist FU-

NAI in preparation, focusing on the project document, the administrative

and financial flows, safeguard issues, among others. Implementing

agency(ies) to be determined.

Second Bolsa Família: The objectives are to: (a) consolidate Bolsa

Familia management and Cadastro Unico (CU); (b) strengthen gov-

ernance; (c) consolidate Ministry of Social Development monitoring

and evaluation system; and (d) promote innovations and strategies to

link population of the CU to skills development, income-generation, pro-

ductive inclusion initiatives. Negotiations pending Government con-

firmation. Environmental Assessment Category C. Project: P101504.

US$ 200.0 (IBRD). Consultants will be required. Ministry of Social De-

velopment and Eradication of Hunger, Esplanda dos Ministerios, Bloco

C, 5o Andar Gabinete, CEP, Brasília, Brazil, Tel: (55-61) 3433-1001,

Fax: (55-61) 3433-1025, Contact: Arlete Sampaio, Executive Secretary

Public Administration, Law, and Justice

(R) Federal Integrated Water 

Sector:

The objective is to assist the

Federal water sector institutions use better instruments to design, im-

plement, and monitor sector policies and programs in an integrated man-

ner. Decision Meeting scheduled for 29 June 2010. Environmental

Assessment Category B. US$ 97.6 (IBRD). Consultants will be re-

quired. Ministerio das Cidades, SNSA, SAUS Quadra 01 Bloco H Ed.

Telemundi II, Brasilia DF, Brazil, Tel: (55-61) 2108-1414, Fax: (55-61)

2108-1144, E-mail: gabinete-snsa@cidades.gov.br, Contact: Leodegar da

Cunnha Tiscoski, Secretary. Agencia Nacional de Aguas, SPO, ea 05

Quadra 03 Bloco M, Brasilia DF, Brazil, Tel: (55-61) 2109-5159, Fax:

(55-61) 2109-5758, E-mail: paulovarella@ana.gov.br, Contact: Paulo

Lopes Varella Neto, Director. Ministerio da Integracao Nacional, Es-

planada dos Ministerios Bl E Sala 900, Brasilia DF, Brazil, Tel: (55-61)

3414-5828, Fax: (55-61) 3414-5493, E-mail: marcelo.borges@integra-

cao.gov.br, Contact: Marcelo Borges, Secretary. Ministerio do Meio Am-



PAGE 74

Monthly Operational Summary

JULY 2010

biente, SEPN 505 Bl B Sala 20, Brasilia DF, Brazil, Tel: (55-61) 3105-

2100, Fax: (55-61) 3105-2015, E-mail: silverio.costa@mma.gov.br, Con-

tact: Silvano Silverio da Costa, Secretary

(R) Municipality Fiscal Consolidation for Efficiency and Growth

Development Policy Loan: The objective is to support the new ad-

ministration of Rio de Janeiro City in its reforms plan on education,

health, public sector management and private sector development.

Negotiations completed on 25 May 2010. Bank Approval scheduled for

1 July 2010.

Environmental Assessment Category U. Project: P111665.

US$ 1045.0 (IBRD). No consultants are required. Secretaria de Fazenda,

Rua Afonso Cavalcanti 455, Cidade Nova, Rio de Janeiro, Brazil, Tel:

(55-21) 2503-3500, Contact: Ariane di Lorio, Assessor

(R) Sao Paulo Sustainable Rural Development and Access to Mar-

kets (Ln. 79080-BR): The objective is to support the State of São

Paulo to increase the competitiveness of family agriculture in its ter-

ritory while improving environmental sustainability. Signing scheduled

for 16 September 2010.

Environmental Assessment Category B. Pro-

ject: P108443. US$ 78.0 (IBRD). Consultants will be required. Secre-

taria de Agricultura e Abastecimento, Avenida Miguel Stefano, 3.900,

04301-903, Sao Paulo, Brazil, Tel: (55-19) 3743-3721/02, Fax: (55-19)

3743-3705, E-mail: brunelli@cati.sp.gov.br, Contact: Joao Brunelli Ju-

nior, Project Coordinator

Minas Gerais Partnership II SWAp Additional Financing: The

objectives are to: (a) improve the efficiency and effectiveness of pub-

lic resource use and allocation for economic and social development;

(b) support the adoption of innovations in public management by the

Borrower; and (c) support the Borrower in strengthening its results-

based management system of monitoring and evaluation of results. Sign-

ing scheduled for 6 July 2010. Environmental Assessment Category

B. Project: P119215. US$ 461.0 (IBRD). Consultants will be required.

Secretariat of Planning and Management, Rua Tomaz Gonzaga, 686 Belo

Horizonte, Brazil, Tel: (55-31) 3290 8223, Fax: (55-31) 3290-8345, E-mail:

thiago.toscano@planejamento.mg.gov.br, Contact: Tiago Toscano,

Deputy Secretary of Planning and Management



Rio de Janeiro Public Sector Modernization: The objective is to

assist the government of the state in its public sector modernization

efforts by providing technical assistance on: (i) the design and im-

plementation of performance management mechanisms for selected

agencies; (ii) the design and implementation of institutional reforms;

and (iii) other public sector modernization initiatives. Negotiations

tentatively scheduled for late-June 2010. Environmental Assessment

Category C. Project: P106768. US$ 18.7 (IBRD). No consultants are

required. Secretariat of Planning and Management of the Govt of Rio

de Janeiro, Av. Erasmo Braga, No. 118, Centro, Brazil, Tel: (55-21) 2292-

5100, Fax: (55-21) 2533-5979, Contact: Francisco Caldas, Under-Secretary

General for Planning and Management



Transportation

(R) Mato Grosso do Sul State Road Transport (Ln. 78720-BR):

The objectives are: (a) modernize the state fiscal administration, (b)

improve the state capacity to protect biodiversity and manage natural

resources in a sustainable fashion, and (c) increase capacity in the man-

agement of transport public investment programs. Signing tentatively

scheduled for mid-July 2010.

Environmental Assessment Category B.

Project: P118410. US$ 300.0 (IBRD). No consultants are required.

Agencia Estadual de Gestao de Empreendimentos de Mato Grosso do

Sul, Av. Desembargador Jose Nunes da Cunha, Bloco 14, Gampo

Grande, MS, Brazil, Tel: (55-67) 3318-5538, Fax: (55-67) 3318-5386, E-

mail: coordenacao.pde@agesul.ms.gov.br, Contact: Juliana Pegolo,

Project Coordinator



Sao Paulo Metro Line 4-Phase 2 (Ln. 78690-BR): The objec-

tive is to improve the quality of service provided to the urban trans-

port users in the area of influence of the new Line 4 stations and

facilitate the integration between metro and bus at those stations.

Signing tentatively scheduled for mid-July 2010, pending Senate approval.

Environmental Assessment Categor y A. Project: P106390. US$

130.0/130.0 (IBRD/JBIC). Consultants will be required to assist in the

preparation of bidding documents and to review detailed engineering

designs Companhia do Metropolitano de Sao Paulo, Rua Boa Vista 175,

Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291-5494, Fax:

(55-11) 3291-2890, E-mail: egranado@metrosp.com.br, Contact: Ernesto

Granado, Coordinator PMU



(R) Sao Paulo Metro Line 5 (Ln. 78550-BR): The objective is to

improve mobility for public transport users in the Capão Redondo-Largo

Treze-Chácara Klabin corridor in a cost-efficient and environmentally

friendly way. Signing awaiting Senate approval. Environmental As-

sessment Category A. Project: P116170. US$ 650.4/481.0 (IBRD/IADB).

Consultants will be required for assessment of train and systems spec-

ifications, project management and supervision Companhia do Met-

ropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo,

SP, Brazil, Tel: (55-11) 3291-5494, Fax: (55-11) 3291-2890, E-mail:

egranado@metrosp.com.br, Contact: Ernesto Granado, Coordinator

PMU

(R) Sao Paulo State Feeder Roads Additional Financing: The ob-

jective is to scale up support to the State in improving the efficiency

of the paved municipal road network. Negotiations completed on 11 June

2010. Bank Approval scheduled for 3 August 2010.

Environmental As-

sessment Category B. Project: P118077. US$ 326.8 (IBRD). Consultants

will be required for local and international consultancy for Project

Preparation, notably on highway engineering. Departamento de

Estradas de rodagem do Estado de Sao Paulo (DER/SP), Avenida do

Estado 777, 3o Andar, Ponte Pequena, Sao Paulo, SP, Brazil, Tel: (55-

11) 3311-1401, Fax: (55-11) 3311-0973, E-mail: delson@sp.gov.br, Con-

tact: Delson Jose Amador, Superintendente

(R) Sao Paulo Trains and Signaling Additional Financing: The

objective is to continue to improve the quality of service offered to SPMR

users by acquiring additional 9 trains for Line 11 of the São Paulo sub-

urban railway (CPTM). Negotiations tentatively scheduled for late-June



2010.

Environmental Assessment Category B. Project: P117122. US$

112.9 (IBRD). Consultants will be required for project management and

supervision/reception of trains. Companhia Paulista de Trens Met-

ropolitanos, Rua Boavista, 185-2 Andar BI. A, Centro Sao Paulo, Sao

Paulo, SP, Brazil, Tel: (55-11) 3101-7141, E-mail: eduardo.graziano@cptm.

sp.gov.br, Contact: Eduardo Graziano, Coordinator UGP

(R) Tocantins Integrated Sustainable Regional Development:

The objective is to contribute to stimulate a poised and sustainable eco-

nomic growth of the State of Tocantins by improving accessibility of

the population, territories and productive systems to services, re-

sources and markets, while ensuring sustainable use of natural re-

sources and the protection of fragile ecosystems. Project Concept



Review Meeting scheduled for 10 August 2010.

Environmental Assess-

ment Category A. US$ 300.0 (IBRD). Consulting services and imple-

menting agency(ies) to be determined.



Water, Sanitation and Flood Protection

(R) Bahia Integrated Health and Water Management SWAp:

The objective is to: (i) increase access to clean water, sanitation, and

basic health care in at least 10 State priority municipalities most affected

by IID, and (ii) improve neonatal health care in 25 selected reference

hospitals using a Baremo of quality and efficiency. Appraisal completed

on 18 May 2010. Negotiations scheduled for early-August 2010.

Envi-


ronmental Assessment Category B. Project: P095171. US$ 60.0 (IBRD).

Consultants will be required. State of Bahia, Av. Luis Viana Filho 400,

4o Andar, Centro Administrativo, Salvador, BA, Brazil, Tel: (55-71)

3115-3550, Fax: (55-71) 3371-3237, Contact: Jorge Jose Santos Pereira

Solla, Secretario de Estado de Saude

(R) Integrated Solid Waste Management and Carbon Finance:

The objective is to scale-up public and private investments in munici-

pal solid waste management treatment and disposal, while ensuring

financial and technical viability and reducing environmental and social

impacts. Negotiations scheduled for 5 July 2010. Environmental As-

sessment Category F. Project: P106702. US$ 50.0 (IBRD). Consultants

will be required during implementation, and to assist public sector in

preparing solid waste and carbon finance projects, including feasibil-

ity studies, environmental assessments, technical and financial analy-

sis, institutionasl framework and propose cost recovery mechanisms.

Caixa Economica Federal, SBS Quadra 4 Lotes 3/4, Ed. Matriz I, 11

Andar-GEAIN, Brasilia, Brazil, Tel: (55-61) 3206-4911, E-mail: gesan@

caixa.gov.br, Contact: Adailton Ferreira Trindade, Gerente Nacional

JULY 2010

Monthly Operational Summary

PAGE 75


PAGE 76

Monthly Operational Summary

JULY 2010

Sao Paulo Water Recovery REAGUA (Ln. 78700-BR): The ob-

jective is to increase water availability in the critical watersheds of the

State of Sao Paulo. Signing scheduled for 31 August 2010. Environmental

Assessment Category B. Project: P106703. US$ 64.5 (IBRD). Consul-

tants will be required for assistance to the State Secretariat of Water

and Energy to manage and verify results during implementation. Sec-

retaria de Estado de Saneamento e Energia, Rua Bela Cintra 847, 14o

Andar, Bairro Consolacao, Sao Paulo, SP, Brazil, Tel: (55-11) 3218-

5500, E-mail: dilmapena@sp.gov.br, Contact: Ms. Dilma Pena, Secre-

taria


(R) Sergipe Water: The objective is to promote efficient and sustainable

water use in targeted municipalities of the Sergipe river basin, by im-

proving water resources management and regulatory tools, reducing

the pollution load discharged into rivers and increasing water services

productivity. Decision meeting tentatively scheduled for early-July 2010.

Environmental Assessment Category A. Project: P112074. US$ 70.3

(IBRD). Consultants will required to: (a) prepare environmental and

social assessments, economic and financial assessments, development

of project operation manual, irrigation services assessments, utility cor-

porate reform and non-revenue water program; and (b) implementa-

tion. State Secretariat of Environment and Water Resources - Sergipe,

Av. Prefeito Heraclito Rollemberg, S/N, Sergipe, Brazil, Tel: (55-79) 3179-

7300, Fax: (55-79) 3179-7302, Contact: Ailton Francisco da Rocha, Pro-

ject Coordinator



Brasilia Environmentally Sustainable Additional Financing: The

objective is to reduce regional inequalities and ensure quality of wa-

ter resources in the Federal District and Brasilia Metropolitan Region

through environmental planning and management activities, poverty

reduction interventions and environmental rehabilitation in the most

critical river basins. This project is on hold until further notice. Envi-

ronmental Assessment Category A. US$ 57.6 (IBRD). Consulting ser-

vices and implementing agency(ies) to be determined.



Chile

Energy and Mining

Climate Change and Energy: The objective is to support energy ef-

ficiency, renewable energy and other clean technologies that would re-

duce emissions of greenhouse gases. Project Concept Review Meeting

scheduled for 20 September 2010. Environmental Assessment Cate-

gory B. US$ 50.0 (IBRD). Consultants will be required. Implementing

agency(ies) to be determined.



Public Administration, Law, and Justice

Social Protection Technical Assistance Additional Financing:

The objectives are to support the efforts of the Government to im-

plement Chile Solidario and lay the foundation of a national system of

social protection. Additional resources are needed to implement ad-

ditional activities to scale up the project’s impact and development ef-

fectiveness. Signing pending clearance from Treasury Department.

Environmental Assessment Category C. Project: P114774. US$ 3.0

(IBRD). Consultants will be required. Ministry of Finance, Teatinos

120, Santiago, Chile, Tel: (56-2) 675-1702/1727, E-mail: xserqueira@mide-

plan.cl, Contact: Ximena Serqueira, Coordinadora de Implementacion

Administrativa del

Water, Sanitation and Flood Protection

(R) Earthquake Early Recover y and Damage Assessment:

The objective is to finance the recovery and damage assessment of

Chile after the February 27, 2010 (8.8 magnitude) earthquake. This

project is no longer in the lending program. Further reporting will be

discontinued.

Environmental Assessment Category B. US$ 500.0

(IBRD). No consultants are required. Implementing agency(ies) to

be determined.



Colombia

Agriculture, Fishing, and Forestry

National Protected Areas Additional Financing: The objective is

to promote the consolidation and long-term sustainability of Colombia’s

National Protected Areas System (NPAS) through designing and im-

plementing a Protected Areas Conservation Trust Fund. Decision

Meeting scheduled for 9 August 2010. Environmental Assessment

Category B. Project: P112106. US$ 4.0 (GEFU). Consultants will be re-

quired. Patrimonio Natural, Calle 72 No. 10-70, Edificio Centro Avenida

Chile, Torre A, Bogota, Colombia, Tel: (57-1) 211-5545, E-mail: agalan@

patrimonionatural.org.co, Contact: Alberto Galan, Director

Second Agricultural Transition: The objective is to: (a) consolidate

the progress in the establishment of a diversified agricultural innova-

tion system and strengthen Colombia’s sanitary and phytosanitary

systems; (b) establish novel ways for technical assistance to agricul-

ture producers. Project Concept Review Meeting scheduled for 25

June 2010. Environmental Assessment Category B. US$ 30.0 (IBRD).

Consultants will be required. Ministry of Agriculture, Av. Jimenez 7-

65, Colombia, Tel: (57-1) 341-9005, Fax: (57-1) 284-1775, E-mail: clau-

dia.uribe@minagricultura.gov.co, Contact: Claudia Uribe, Coordinadora

del PTA


Education

(R) Education System Modernization: The objectives are to sup-

port: (a) the planned institutional transformation of Instituto Colom-

biano para el Fomento de la Educacion Superior (ICFES) from a public

entity to a semi public entity; and (b) technical and institutional capacity

of ICFES to analyze, monitor and report student assessments. Deci-

sion Meeting scheduled for 30 June 2010.

Environmental Assessment

Category C. Project: P106693. US$ 13.2 (IBRD). Consultants will be

required. Instituto Colombiano para el Fomento de la Educacion Su-

perior, Margarita Pe, Director, Colombia, Tel: (57-1) 341-228, E-mail:

mpena@ices.org, Contact: Margarita Pena, Directora



(R) Science, Technology and Innovation: The objective is to include

activities supporting the implementation of the recently approved sec-

tor policy for Science, Technology and Innovation by the Government

of Colombia. Negotiations completed on 1 June 2010. Bank Approval



scheduled for 13 July 2010.

Environmental Assessment Category B. Pro-

ject: P117590. US$ 25.0 (IBRD). Consultants will be required. Colom-

bian Institute for the Development of Science and Technology

(COLCIENCIAS), Transversal 9 A Bis 132 28, Bogota, Colombia, Tel:

(57-1) 1625-8480, E-mail: jfmiranda@colciencias.gov.co, Contact: Juan

Francisco Miranda, Director General

Early Childhood: The objective is to support the government in im-

proving access to quality early childhood development services. Pro-

ject Concept Review Meeting scheduled for 30 September 2010.

Environmental Assessment Category B. US$ 40.0 (IBRD). Consul-

tants will be required. Implementing agency(ies) to be determined.

Public Administration, Law, and Justice

Sustainable Development Additional Financing: The objective is

to ensure sustained progress through technical assistance and in-

vestment in three of the four thematic areas of the original loan: (i) en-

vironmental health: outdoor air quality and a hand washing campaign,

(ii) integrated water resources management, and (iii) planning and over-

sight of environmental management. Decision Meeting scheduled for

27 September 2010. Environmental Assessment Category C. US$ 10.0

(IBRD). Consultants will be required. Ministry of Environment and Na-

tional Planning Department, Calle 37 No. 8-40, Bogota, Colombia, Tel:

(57-1) 332-3400, Ext. 1194, Fax: (57-1) 332-3429, E-mail: lnino@mi-

nambiente.gov.co, Contact: Lucy Amparo Nino Carrillo, Coordinadora

de Banca Multilateral



Transportation

Integrated Mass Transit System Third Additional Financing:

The objective is to deliver high quality and sustainable BRTS in selected

medium and large cities to improve mobility along the most strategic

mass transit corridors; improve accessibility for the poor through

feeder services and fare integration; and build greater institutional ca-

pacity at the national and local level. Project Concept Review Meeting

scheduled for 28 June 2010. Environmental Assessment Category B.

US$ 600.0 (IBRD). Consultants will be required. Ministry of Transport,

Av. El Dorado CAN, Colombia, Tel: (57-1) 324-0800, E-mail: mintrans@

mintransporte.gov.co, Contact: Carolina Camacho, Coordinadora Sis-

temas Integrados de Transporte


Water, Sanitation and Flood Protection

National Macroproyectos Social Interest Program: The objec-

tives are to: (a) increase access to affordable land and housing solu-

tions for over 200,000 households; and (b) develop and pilot approaches

to access capital markets to finance the program as a means to reduce

and ultimately eliminate in the medium-term the need for public fi-

nancing of infrastructure. Negotiations to be scheduled. Environmental

Assessment Category B. Project: P110671. US$ 40.0 (IBRD). Consul-

tants will be required. Ministry of Environment, Housing, and Terri-

torial Development, Calle 37 No. 8-40, 3er Piso, Bogota, Colombia,

Tel: (57-1) 332-3400, Fax: (57-1) 332-3400 Ext. 1265, Contact: Luis Fe-

lipe Henao Cardona, Viceministro



Download 1.27 Mb.

Do'stlaringiz bilan baham:
1   ...   22   23   24   25   26   27   28   29   30




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2020
ma'muriyatiga murojaat qiling