(N) Multisector Infrastructure Rehabilitation Additional Fi-

nancing: The objective remains the same as the original, to establish

an urban water/electricity distribution concession and new generation

facility

. Negotiations scheduled for 3 June 2010. Environmental As-

sessment Category B. Project: P120910. US$ 12.7/6.0/4.0 (IDA Credit/

ECOW/WAEM). No consultants are required. Ministry of Economy,

Plan and Regional Integration, Ministry of Economy, Bissau, Guinea-

Bissau, Tel: (245) 202-172



(N) Recovery and Reform of the Energy Sector: The objective is

to meet the electricity and water supply needs of the country in an eco-

nomically and environmentally sustainable manner in order to contribute

to economic growth and well-being of the population of Guinea Bissau.

Project Concept Review Meeting scheduled for mid-June 2010. Envi-

ronmental Assessment Category A. US$ 10.0/25.0 (IDA Credit/ZMUL).

Consulting services and implementing agency(ies) to be determined.

Public Administration, Law, and Justice

(R) Second Economic Governance Reform Development Pol-

icy Grant: The objectives are to: (a) promote efficiency, transparency

and accountability in the use of public resources through improved pub-

lic financial management; and (b) foster private sector development

mainly through the development of a modern legal framework for pri-

vate investment and improvements of the business environment. Bank

Approval scheduled for 29 June 2010. Environmental Assessment Cat-

egory U. Project: P114937. US$ 6.0 (IDA Credit). Consultants will be

required during preparation. Ministry of Finance, Av Amilcar Cabral,

CP 67, Bissau, Guinea-Bissau, Tel: (245) 320-6163, Fax: (245) 320-

5156, E-mail: jocavaca@hotmail.com, Contact: Jose Carlos Varela

Casimiro, Secretary of State for Treasury

Kenya

Agriculture, Fishing, and Forestry

(R) Adaptation to Climate Change in Arid and Semi-Arid Lands:

The objective is to improve the ability of selected districts and com-

munities of the Arid and Semid-Arid Lands to plan and manage climate

change adaptation measures. Bank Approval completed on 10 June



2010.

Environmental Assessment Category B. Project: P091979. US$

5.5 (GEFU). No consultants are required. Ministry of Finance, The

Treasury, PO Box 30007-00100, Kenya, Tel: (254-20) 338-111, Fax:

(254-20) 228-861, E-mail: njasu@treasury.go.ke, Contact: Laurent

Sedego, Minister



Agricultural Productivity and Sustainable Land Management: The

objectives are to: (a) attain sustainable use of natural resources for higher

productivity and incomes among farmers and (b) maintain critical

ecosystem functions in fragile areas. Bank Approval scheduled for 24

June 2010. Environmental Assessment Category B. Project: P088600.

US$ 0.1/10.0 (BNPP/GEFU). Consultants will be required. Kenya

Agricultural Research Institute (KARI), PO Box 57811, Nairobi, Kenya,

Tel: (254-20) 583-301, Fax: (254-20) 583-344, E-mail: kiome-rm@kari.org,

Contact: Romano Kiome, Director

(R) Coastal Development: The objective is to achieve greater value

and improved livelihood through development of a sustainable man-

agement approach to marine and coastal resources. Negotiations com-

pleted on 21 May 2010. Bank Approval scheduled for 27 July 2010.

Environmental Assessment Category B. Project: P108845. US$ 5.0

(GEFU). Consultants will be required. Kenya Marine and Fisheries Re-

search Institute, PO Box 81651, Kenya, Tel: (254-41) 475-157, E-mail:

juku@kmfri.co.ke, Contact: J Kazungu, Director

(R) Coastal Development: The objective is to achieve greater value

and improved livelihood through development of a sustainable man-

agement approach to marine and coastal resources. Negotiations com-

pleted on 21 May 2010. Bank Approval scheduled for 27 July 2010.

Environmental Assessment Category B. Project: P094692. US$ 35.0/5.0

(IDA Credit/GFCO). Consultants will be required. Kenya Marine and

Fisheries Research Institute, Headquater and Mombasa Station, PO

Box 81651, Monbassa, Kenya, Tel: (254-41) 475-151, Fax: (254-41) 475-

157, E-mail: rpayet@swiofp.net, Contact: Ruphin Bo-elongo, Coordi-

nateur General

Arid and Semi-Arid Lands Sector-Wide Program: The objective

is for the ASAL (arid and semi-arid lands) population to have improved

capacity to increase resilience and productivity of its pastoral and agro-

pastoral livelihood systems. Appraisal scheduled for 13 September

2010. Environmental Assessment Category B. Project: P120959. US$

100.0/30.0/5.0/10.0 (IDA Credit/DANI/DFID/ECEU). No consul-

tants are required. Ministry of State for the Development of Northern

Kenya and Other Arid Lands, Kenya



Education

Basic Education Enhancement Additional Financing: The objectives

are to improve equitable access to both primary and secondary edu-

cation, and improve the quality of primary education. Appraisal sched-

uled for 1 September 2010. Environmental Assessment Category B.

Project: P110437. US$ 70.0/16.1 (IDA Credit/ZBIL). No consultants

are required. Ministry of Education, Jogoo House, Harambee Avenue,

Nairobi, Kenya, Tel: (254-20) 240-089, Fax: (254-20) 214-287, E-mail: nki-

mathi@education.go.ke



Second Education Sector Support Program FTI: The objective

is to support the basic education strategy through the investment pro-

grams. Appraisal scheduled for 30 August 2010. Environmental As-

sessment Category B. US$ 125.0 (EFAF). Consulting services to be

determined. Ministry of Education (MOE), Jogoo House, PO Box

30040, Nairobi, Kenya, Tel: (254-20) 318-581, Fax: (254-20) 214-287, E-

mail: elimu@todays.co.ke

Energy and Mining

(R) Energy Access Expansion (Cr. 47430-KE): The objective is

to help the government meet its electrification targets. Signing sched-



uled for 29 July 2010.

Environmental Assessment Category A. Project:

P103037. US$ 330.0/168.0/220.0/5.0/323.0/84.0 (IDA Credit/EUIB/

FRDE/GPBA/JICA/KFW). Consultants will be required. Contact:

Ms. Tamara Babayan, Director

Power System Development: The objective is to ensure that access

to reliable, cost effective, and high quality supply of electricity is sus-

tained to business enterprises and households. Identification sched-

uled for 31 March 2011. Environmental Assessment Category B. US$

50.0 (IDA Credit). Consulting services and implementing agency(ies)

to be determined.



Finance

(N) Infrastructure Finance and PPP: The objective is to address:

(a) the major gap in financing for the crucial infrastructure invest-



PAGE 16

Monthly Operational Summary

JULY 2010

ment Kenya needs to become a middle income country; and (b) iden-

tify obstacles, including the  need  for regulatory/institutional re-

forms as well as government financial support for PPP projects and

hands on technical advice. Identification scheduled for 9 June 2010. En-

vironmental Assessment Category B. US$ 100.0 (IDA Credit). Con-

sultants will be required for implementation. Implementing agency(ies)

to be determined.



Health and Other Social Services

(R) Health Sector Support: The objective is to implement a sector-

wide reform and strengthening of the health sector. Negotiations com-



pleted on 18 May 2010. Bank Approval scheduled for 29 June 2010.

Environmental Assessment Category B. Project: P074091. US$ 100.0

(IDA Credit). Consultants will be required. Ministry of Public Health

and Sanitation; and Ministry of Medical Services, Afya House, PO

Box 30016-00100, Kenya, Tel: (254-20) 2717077, Fax: (254-20) 2713234,

Contact: Dr. T. Gakuruh, Head, Health Sector Reform Secretariat



Youth Empowerment: The objective is to reduce vulnerability and

invest in people. Bank Approval completed on 4 May 2010. Environ-

mental Assessment Category B. Project: P111546. US$ 60.0 (IDA

Credit). No consultants are required. Power Plants Joint Stock Com-

pany, 326 Jibek Jolu avenue, Bishkek, Kyrgyz Republic, Tel: (996-312)

661-110, E-mail: es@infotel.kg, Contact: Ms. Ludmila Burlui, Executive

Director, MEPIU

Public Administration, Law, and Justice

Judicial Performance Improvement: The objective is to improve

the performance of the judiciary in areas of public accountability, trans-

parency, improvement in oversight and case and trial management. De-

cision Meeting scheduled for 16 September 2010. Environmental

Assessment Category B. Project: P105269. US$ 40.0 (IDA Credit).

Consultants will be required. Judiciary of Kenya, PO Box 30041-00100,

Nairobi, Kenya, Tel: (254-20) 214-632, Fax: (254-20) 333-449, Contact:

Lydia Achode, Chief Registrar



Municipal Program: The objective is to improve service delivery in

urban centers. Bank Approval completed on 4 May 2010. Environ-

mental Assessment Category B. Project: P066488. US$ 100.0/45.0/10.0

(IDA Credit/AFD/SIDA). Consultants will be required. Office of the

Deputy Prime Minister and Ministry of Local Government, Jogoo

House, A Taifa Rd PO Box 30004, Nairobi, Kenya, Tel: (254-20) 223-

346, Fax: (254-20) 243-067, Contact: John K. Karu, Chief Economist

Transportation

Nairobi Urban Toll Road-Partial Risk Guarantee: The objective

is to reduce traffic congestion on Northern Corridor through Nairobi.

Appraisal scheduled for 22 June 2010. Environmental Assessment Cat-

egory B. Project: P103973. US$ 160.0 (GUID). Consulting services to

be determined. Kenya National Highways Authority, PO Box 49714-

00100, Nairobi, Kenya, Tel: (254-20) 801-3842, Fax: (254-20) 271-5483,

E-mail: dg@kenha.co.ke, Contact: Eng. Meshack O. Kidenda, Direc-

tor General. Kenya Urban Roads Authority, IKM Place, 5th Ngong Av-

enue, PO Box 41727-00100, Nairobi, Kenya, Tel: (254-20) 250-8033,

E-mail: kenyaurbanroadsauthority@gmail.com, Contact: Eng. Joseph

Nkadayo, Director General

Water, Sanitation and Flood Protection

Nairobi Metropolitan Services: The objective is to improve three

key public services in the Nairobi Metropolitan Area: Transport, Wa-

ter Supply and Solid Waste Management, and to strengthen the insti-

tutional structures in charge of these services. Decision Meeting

scheduled for 20 September 2010. Environmental Assessment Cate-

gory A. US$ 82.5 (IDA Credit). Consulting services and implement-

ing agency(ies) to be determined.

Slum Upgrading: The objective is to improve living conditions in slums

in selected cities in Kenya, by improving security of tenure and investing

in infrastructure based on plans developed in consultation with the com-

munity. Decision Meeting scheduled for 12 July 2010. Environmental

Assessment Category B. US$ 100.0 (IDA Credit). Consulting services

and implementing agency(ies) to be determined.



Lesotho

Agriculture, Fishing, and Forestry

(R) Smallholder Agriculture Development: The objective is to re-

visit the strategy for sustainable rural economic development by ad-

dressing (i) agro-ecological potential of the land areas; (ii)

market-oriented crop and livestock production; and (iii) performance

of agriculture and rural economic development. Preparation is under-

way.

Environmental Assessment Category B. Project: P119432. US$

10.0/12.0 (IDA Credit/IFAD). Consulting services and implementing

agency(ies) to be determined.



Education

(R) EFA Fast Track Initiative Catalytic Fund: The objective is to

support the Government by: (a) consolidating the gains obtained in

primary education enrollment of boys and girls; (b) improving qual-

ity in primary education; and (c) expanding pro-poor pre-primary ed-

ucation through improvements in school infrastructure, distribution

of qualified teachers, access to good classrooms Bank Approval sched-

uled for 16 June 2010. Environmental Assessment Category B. Pro-

ject: P116426. US$ 20.0/6.8 (FTIE/GIRR). No consultants are required.

Ministry of Education and Training, Constitution Road, PO Box 1279,

Maseru, Lesotho, Tel: (266-22) 324-465, Fax: (266-22) 327-305, Contact:

Mota Sekonyela, Deputy Principal Secretary

Health and Other Social Services

Health Sector PPP Technical Support: The objective is to support

capacity building and provide technical assistance for: (i) the contract

management of the national referral hospital Public-Private Partner-

ship by the Ministry of Health and Social Welfare in particular; and (ii)

the overall management capacity of the Ministry of Finance and De-

velopment Planning for the PPP in general. This project is on hold un-

til further notice. Environmental Assessment Category C. US$ 5.0

(IDA Credit). Consulting services and implementing agency(ies) to be

determined.

Public Administration, Law, and Justice

Second Poverty Reduction Support Credit (Cr. H5560-LS, Cr.

47060-LS): The objective is to support the Government’s response

to the potential impact of the global financial crisis on its growth

prospects by contributing to: (i) strengthen the business environment

and promoting economic diversification; (ii) enhance the effective-

ness of public expenditures; and (iii) improve service delivery in key

sectors. Bank Approval completed on 30 March 2010. Environmental

Assessment Categor y U. Project: P112817. US$ 20.0/5.0 (IDA

Credit/IDA Grant). No consultants are required. Ministry of Finance

and Development Planning (Recipient), PO B 395, Lesotho, Tel: (266)

2232-3703, Fax: (266) 2231-0157, E-mail: mkhethisa@finance.gov.ls,

Contact: Mosito Khethisa, Principal Secretary

Transportation

(R) Integrated Transport Additional Financing: The objective is

to continue the original IT project of high level bridges over rivers Senqu

and Senqunyane. Appraisal completed on 21 May 2010. Negotiations

scheduled for 1 July 2010.

Environmental Assessment Category B. Pro-

ject: P119443. US$ 15.0 (IDA Credit). No consultants are required. Min-

istry of Public Works and Transport, Maseru, Lesotho, Tel: (266-22)

326-973, E-mail: itppm@mopwt.gov.ls, Contact: Ms. Pama, PIU Officer

Liberia

Agriculture, Fishing, and Forestry

(R) Smallholder Tree Crop Revitalization Support: The objective

is to increase tree crop farmer’s income opportunities by rehabilitat-

ing unproductive farms, and by supporting preparation activities toward

the future development of the tree crop sector and effective small-

holder participation, including testing tree crop replanting and new plant-

ing financing mechanisms and institutional arrangements. Preparation

scheduled for 26 July 2010. Environmental Assessment Category B.

Project: P113273. US$ 7.0 (IDA Credit). Consultants will be required

to carry out the Social Assessment and the Environmental Assessment,

as well as drafting the Project Implementation Manual. Other con-

sulting services will be determined. Ministry of Agriculture, Liberia


JULY 2010

Monthly Operational Summary

PAGE 17

Energy and Mining

(N) Electricity System Enhancement: The objective is to improve

and increase access to quality electricity services in Liberia. Prepara-

tion is underway. Environmental Assessment Category B. US$ 5.0

(IDA Grant). Consulting services and implementing agency(ies) to be

determined.

Health and Other Social Services

(N) Youth, Employment, Skills: The objective is to support the

government’s efforts to facilitate pro-poor growth through employ-

ment and improved employability of the unemployed youth population.

Bank Approval scheduled for 22 June 2010. Environmental Assessment

Category B. Project: P121686. US$ 6.0/10.0 (IDA Credit/ACGF). No

consultants are required. Lace and Management Agent, Liberia



Public Administration, Law, and Justice

(R) Re-engagement and Reform Support Program: The objective

is to support the policy measures in the areas of public financial man-

agement (including procurement), the EITI, civil service reform and

the investment environment. Negotiations completed on 9 June 2010.



Bank Approval scheduled for 26 August 2010.

Environmental Assess-

ment Category U. Project: P117279. US$ 11.0 (IDA Grant). Consultants

will be required. Ministry of Finance, Broad Street, Monrovia, Liberia,

Tel: (231-06) 795-302, Contact: Ruphin Bo-elongo, Coordinateur Gen-

eral


Transportation

(R) Road Asset Management: The objective is to finance (with con-

tribution from the Liberia Reconstruction Trust Fund (LRTF)), three

Output and Performance based Road Contracts (OPRC) in Liberia. Pro-

ject Concept Review Meeting scheduled for mid-June 2010.

Environ-


mental Assessment Category B. US$ 165.0 (LRTF). Consulting services

to be determined. Ministry of Finance, Broad Street, Monrovia, Liberia,

Tel: (231-06) 795-302

(R) Urban and Rural Infrastructure Rehabilitation Additional Fi-

nancing: The objective is to support Government to improve the road

access in Monrovia, targeted rural areas, and improve institutional

structure for technical management of the road sector. Appraisal com-

pleted on 20 May 2010. Negotiations scheduled for mid-June 2010.

En-


vironmental Assessment Category B. Project: P121770. US$ 20.0/27.0

(IDA Credit/LRTF). Consultants will be required to monitor output

and performance based road works Infrastructure Implementation

Unit, South Lynch Street, Monrovia, Liberia, Tel: (231) 670-1018



Madagascar

Agriculture, Fishing, and Forestry

Irrigation and Watershed Management: The objective is to contribute

to inclusive rural growth through the promotion of intensification and

diversification in three regions with high potential for agricultural de-

velopment, while promoting sustainable use of infrastructure and soil

and water resources. This project is on hold until further notice. En-

vironmental Assessment Category A. Project: P088887. US$ 5.9 (GEFU).

No consultants are required. Ministry of Agriculture, Livestock and

Fisheries, Bureau BVPI, Nanisana, Antananarivo, Madagascar, Tel:

(261-20) 222-474-385, Fax: (261-20) 222-6561, E-mail: cpnbvpi@blue-

line.mg, Contact: Lantonirina Ramaroson, Coordinateur National



Environmental SWAp Support: The objective is to: (a) strengthen

financial and sustainability of the environmental sector; (b) involve

rural communities in protected areas management; (c) support insti-

tutional reforms and capacity building of MEEFT; and (d) strengthen

environmental governance. Project Concept Review Meeting sched-

uled for 20 July 2010. Environmental Assessment Category B. US$

20.0/10.0/5.0/20.0/5.0 (IDA Credit/FRDE/JBIC/KFW/UNDP). Con-

sulting services and implementing agency(ies) to be determined.



Foundation for Protected Areas and Biodiversity: The objective

is to improve the sustainability of the protected area system by pro-

viding a regular and predictable revenue source over the long term that

will cover part of the system’s recurrent cost through the capitaliza-

tion of the Foundation for Protected Areas and Biodiversity, an al-

ready functioning endowment fund created under EP3. Decision

Meeting scheduled for 15 September 2010. Environmental Assess-

ment Category B. US$ 7.5/6.5/10.0/6.5 (IDA Grant/AFD/GEFU/

KFW). Consulting services and implementing agency(ies) to be de-

termined.



Marine Protected Areas: The objective is to strengthen the sus-

tainable management of Malagasy seascapes, mainstreaming envi-

ronment in the marine productive sectors such as fisheries, aquaculture,

tourism and mining, and associating local populations in the benefits

and management of marine protected areas (MPA). Project Concept

Review Meeting scheduled for 20 July 2010. Environmental Assessment

Category B. US$ 5.0 (GEFU). Consulting services and implementing

agency(ies) to be determined.



Education

EFA Plan-Catalytic Fund: The objective is to finance the EFA plan

for the achievement of the MDG2 by 2015. Decision Meeting sched-

uled for mid-June 2010. Environmental Assessment Category B. Pro-

ject: P114350. US$ 85.1 (EFAF). Consulting services to be determined.

Ministere de l’ Education Nationale, Anosy, BP 267, Antananarivo,

Madagascar, Tel: (261-2022) 28-625, Fax: (261-2022) 62-911, Contact:

Josiane Rabetokotany, Technical Coordinator, UAT

Energy and Mining

Power Sector Guarantee Facility: The objective is to facilitate pri-

vate sector investment in Hydro Power Generation Facilities in Mada-

gascar. The guarantee will cover the Government’s obligations towards

the independent Power Producer with regards to payments and reg-

ulatory risks. Project Concept Review Meeting scheduled for 21 De-

cember 2010. Environmental Assessment Category A. US$ 20.0/40.0

(GUID/ZPCO). Consulting services and implementing agency(ies) to

be determined.



Second Power/Water Sectors Recovery and Restructuring APL:

The objective is to lay the foundation for a sustainable expansion of a

commercially-oriented utility in the most cost-efficient way by invest-

ing in strategically important areas such as: (i) HV interconnections

of the main load-centres; (ii) preparation of the next large scale hydro

facility; (iii) investments and TA necessary. Project Concept Review

Meeting scheduled for 15 March 2011. Environmental Assessment Cat-

egory A. US$ 50.0/50.0/64.0/70.0 (IDA Credit/AFDB/ZBIL/ZPCO).

Consulting services and implementing agency(ies) to be determined.

Health and Other Social Services



Download 1.27 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   30




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2020
ma'muriyatiga murojaat qiling