Prepared by: Temelsu International Engineering Services Inc. Tashkent, 2016


Download 5.25 Kb.
Pdf ko'rish
bet1/32
Sana24.04.2017
Hajmi5.25 Kb.
  1   2   3   4   5   6   7   8   9   ...   32

The Ministry of Agriculture and Water Resources 
Project Implementation Unit for Water  
Infrastructure (PIU-WI) 
Fergana Valley Water Resources Management 
Phase-II Project 
Environmental Assessment and Management Plan 
Final Report 
DATE:  28 March 2016 
Prepared by: 
Temelsu International Engineering Services Inc. 
Tashkent, 2016
         
 THE WORLD BANK 
SFG2070
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized
Public Disclosure Authorized

 

Environmental Assessment 
FINAL                                                                 
Fergana Valley Water Recourses Management Project, Phase II (FVWRMP-II)
 
Temelsu International Engineering Service Inc.
 
      1 
 
 
The Ministry of Agriculture and Water Resources 
Project Implementation Unit for Water 
Infrastructure (PIU-WI) 
 
 
 
 
Fergana Valley Water Resources Management  
Phase-II Project 
 
 
 
Environmental Assessment and Management Plan 
 
  
 
Final Report  
 
 
 
 
 
 
 
DATE:  28 March 2016 
 
 
Prepared by:  
 
Temelsu International  Engineering  Services Inc 
             
 
 
 
Tashkent, 2016 
          
 

Environmental Assessment 
FINAL                                                                
Fergana Valley Water Recourses Management Project, Phase II (FVWRMP-II)
 
Temelsu International Engineering Service Inc.
 

 
Table of Contents 
EX ECUTIV E SUMMARY
............................................................................................................................................................ 8
 
1.
 
INTRODUCTION
 .....................................................................................................................................................21
 
1.1. Background ............................................................................................................................. 21 
1.2. Objectives .............................................................................................................................. 23 
1.3. Scope and status of this Report  ............................................................................................... 23 
2.LEGAL, POLITICAL, INSTITUTIONAL FRAMEWORK
 ...........................................................................................24
 
2.1. Environmental Sector .............................................................................................................. 24 
2.1.1. Legal and Political Framework  .......................................................................................... 24 
2.1.2. Uzbekistan EA Requirements............................................................................................ 26 
2.1.3. International and  Regional Agreements  ............................................................................. 26 
2.1.4. Institutional Framework ..................................................................................................... 27 
2.1.5. Monitoring and Environmental  Impact Assessment ............................................................. 28 
1.2. Irrigation and Drainage Sector .................................................................................................. 29 
2.2.1. Water Management Policy and Reforms  ............................................................................ 29 
2.2.2. National Water Management Organizations  ....................................................................... 30 
2.2.3. Irrigation and Drainage Management in Fergana Valley  ...................................................... 32 
1.3. Institutional development and capacity building problems  ........................................................... 34 
2.4. Regional Water Management................................................................................................... 35 
3. WORLD  BANK S AFEGUARD POLICI ES
....................................................................................................................37
 
3.1. World Bank EA Requirements.............................................................................................. 37 
3.2. World Bank Safeguard Policies  ............................................................................................ 39 
3.3. The Comparison of  National and Water Bank Environment Assessment Requirements  ........... 40 
4. PROJECT DES CRIPTION
 .................................................................................................................................................42
 
4.1. General ................................................................................................................................... 42 
4.2. Project Area ............................................................................................................................ 42 
4.3. Project Goals and Objectives .................................................................................................... 43 
4.4. Project Components  ................................................................................................................ 43 
4.5. Physical Options ...................................................................................................................... 44 
4.6. Agricultural Modernization  Interventions .................................................................................... 47 
4.7. Institutional Options  ................................................................................................................. 47 
4.8. Environmental and Social Options  ............................................................................................ 48 
5.
 
CURRENT STATE OF  ENVIRONMENT
 .......................................................................................................................49
 
5.1. General  background ................................................................................................................ 49 
5.1.1.  Biophysical resources  ...................................................................................................... 49 
5.1.2.  Water resources  .............................................................................................................. 52 
5.1.3.  Land Res ources and Land  Use  ......................................................................................... 56 
5.1.4.  Use of agrochemicals ....................................................................................................... 57 
5.1.5.  Biological Resources ........................................................................................................ 57 
5.1.6.  Social Resources  ............................................................................................................. 59 
5.1.7.  Climate  Change ............................................................................................................... 59 
1.4. Podshaota-Chodak Irrigation System ........................................................................................ 60 
5.2.1. Physical resources  ........................................................................................................... 60 
5.2.2. Water Res ources  ............................................................................................................. 62 
5.2.3. Land Resourc es and Land Use  ......................................................................................... 65 
5.2.4. Biological  Resources  ........................................................................................................ 66 
5.2.5. Social Resources  ............................................................................................................. 66 
5.3. Isfay ram -Shakhimardan Irrigation System................................................................................. 67 
5.3.1. Physical Resourc es .......................................................................................................... 67 
5.3.2. Water Res ources  ............................................................................................................. 69 
5.3.3. Land Resourc es and Land Use  ......................................................................................... 72 
5.3.4. Social Resources  ............................................................................................................. 73 
5.4. Savay- Akburas ai Irrigation System .......................................................................................... 73 
5.4.1. Physical Resourc es .......................................................................................................... 73 
5.4.2. Water Res ources  ............................................................................................................. 75 
5.4.3. Land resources and Land  Use  .......................................................................................... 76 
5.4.4. Social resources  .............................................................................................................. 77 

Environmental Assessment 
FINAL                                                                
Fergana Valley Water Recourses Management Project, Phase II (FVWRMP-II)
 
Temelsu International Engineering Service Inc.
 

 
6.
 
ASSESSMENT OF  ENVIRONMENTAL IMPACTS
 ...................................................................................................78
 
6.1. Impacts by physical intervention type (physical options)  ............................................................. 78 
6.2. Impacts of Sub-project Locations .............................................................................................. 83 
6.3. Impacts during P roject Implementation and Mitigation  ................................................................ 85 
6.3.1.  Water resources  .............................................................................................................. 85 
6.3.2.  Land resources  ................................................................................................................ 85 
6.3.3.  Traffic, ambient air, noise and dust .................................................................................... 86 
6.3.4.  Terestrial and aquatic flora and fauna ................................................................................ 86 
6.3.5.  Solid and liquid  waste management  .................................................................................. 87 
6.3.6.  Safety and healthy work conditions  ................................................................................... 87 
6.4. Impacts by Project Components ............................................................................................... 87 
6.4.1.  Component A 

 Irrigation  Infrastructure Improvement  ......................................................... 87 
6.4.2.  Component B 

 Support  for Agricultural Modernization  ....................................................... 88 
6.4.3.  Component C -  Institutional Reforms  ................................................................................. 93 
6.4.4.  Component D 

 Project management, audit, monitoring and evaluation, technical assistance 94 
6.5. Long-term impact and mitigation measures  ............................................................................... 94 
6.5.1.  Land Occupation.............................................................................................................. 94 
6.5.2.  Historical and cultural monuments and landscape  .............................................................. 94 
6.5.3.  Impacts Caused  by the Project Infrastructure Operation  ..................................................... 94 
6.6. Overall project impact during Phase  II ....................................................................................... 94 
6.7. Impacts related to climate change  ............................................................................................. 95 
6.8. 
“Without Project” Situation
 ........................................................................................................ 97 
6.8.1. 
“Without Project” Situat
ion: Podshaota-Chodak .................................................................. 98 
6.8.2. 
“Without Project” Situation: Isfairam
-S hahimardan ............................................................. 99 
6.8.3. 
“Without Project” Situation: Savai
-Akburas ai .....................................................................101 
6.9. 
“With Project” Situation
........................................................................................................... 102 
6.9.1. 
“With Project” Situation: Podshaota
-Chodak  .....................................................................102 
6.9.2. 
“With Project” Situation: Isfairam
-Shahimardan .................................................................104 
6.9.3. 
“With Project” Situation: Savai
-Akburasai ..........................................................................107 
6.10. 
Water Balance  with res pect to the Andijan reservoir before and after project ...................... 109 
6.11. 
Impact on Syrdarya River  and Small Rivers  ..................................................................... 112 
6.12. 
Proposed option............................................................................................................. 113 
7.
 
EMERGENCY SITUATIONS ANALYSIS
.................................................................................................... 114
 
7.1. Types of situations ................................................................................................................. 114 
7.2. Mitigation .............................................................................................................................. 114 
8.
 
ENVIRONMENTAL MANAGEMENT PLAN
............................................................................................... 115
 
8.1. Mitigation Plan ....................................................................................................................... 115 
8.2. Environmental Monitoring Plan  ............................................................................................... 118 
9.
 
ENVIRONMENTAL MANAGEMENT PLAN MATRIX. CAPACITY BUILDING
 ............................ 121
 
9.1. Measures aft er Project Completion  ......................................................................................... 126 
9.2. Costs .................................................................................................................................... 126 
10.
 
CONSULTATION AND DISCLOSURE
........................................................................................................ 130
 
11.
 
ANNEX ES
 ............................................................................................................................................................... 132
 
ANNE X 1. List of References ........................................................................................................ 132 
ANNEX  2.  Environmental  Review  Procedure  Guidelines  for  Agricultural  Modernization  Support  and 
Institutional Components .............................................................................................. 133 
ANNE X 3. Consultation log .......................................................................................................... 141 
ANNE X 4. Organizational Charts  .................................................................................................. 143 
ANNE X 5. Supporting tables ........................................................................................................ 148 
ANNE X 6. Water Quality Standards  .............................................................................................. 162 
ANNE X 7. Aquatic recharge management. Best practices  .............................................................. 164 
ANNE X 8. Dam Safety (Operational Policy and Op 4.37)  ............................................................... 165 
ANNE X 9. Stakeholder Consultation Workshops 

 Program, Participants and Question/Responses  . 169 
ANNE X 10. Photoes  .................................................................................................................... 180 
ANNE X 11. Colophon .................................................................................................................. 182 
ANNE X 12. The Endorsement Letter of the SEE............................................................................ 183 
ANNE X 13. Brief Guidance  for the Cumulative  Impact Assessment ................................................ 187 
 

Environmental Assessment 
FINAL                                                                
Fergana Valley Water Recourses Management Project, Phase II (FVWRMP-II)
 
Temelsu International Engineering Service Inc.
 

 
FIGURES 
Figure S. 1. Project area (regional) ..............................................................................................................................................13
 
Figure S. 2. The Overall location of FVWRMP-II sub-projects areas in Fergana Valley......................................................13 
Figure 1.1. Project area (regional)...............................................................................................................................................22
 
Figure 1.2. Project area (Uzbekistan with valley) .....................................................................................................................22
 
Figure 2.1. Organizational structure of water distribution in Uzbekistan............................................................................31
 
Figure 2.2. Naryn-Syrdarya BAIS map.........................................................................................................................................33
 
Figure 2.3. Naryn-Karadarya BAIS map ......................................................................................................................................33
 
Figure 2.4. Syrdarya-Sokh BAIS map ...........................................................................................................................................34
 
Figure 3.1. World Bank Environmental Assessment and Project Cycle ................................................................................38
 
Figure 5.1. Fergana Valley landscape map ................................................................................................................................49
 
Figure 5.2. Ground water table and salinity in Fergana Valley ..............................................................................................51
 
Figure 5.3. Average monthly river discharge in Syrdarya and Naryn Rivers (m
3
/sec) .......................................................53
 
Figure 5.4. Annual river flow of Karadarya River (m
3
/sec)......................................................................................................53
 
Figure 5.5. Key land use categories.............................................................................................................................................56
 
Figure 5.6. Crop pattern of the irrigated agricultural lands....................................................................................................56
 
Figure 5.7. Soil contamination with pesticides, g/kg ...............................................................................................................57
 
Figure 5.8. Protected Ar eas in Fergana Valley ..........................................................................................................................58
 
Figure 5.9. Change of ex treme maximum and minimum air temperatures in Fergana Valley ........................................59
 
Figure 5.10. Trend of air temperature changes by period of observations:........................................................................60
 
Figure 5.11. Sub-project zone in Phodshoota-Chodak system ..............................................................................................61
 
Figure 5.12. Podshaota River discharge hydrograph during years with various water availability.................................62
 
Figure 5.13. Land use structure: (a) area and (b) number of farms ......................................................................................65
 
Figure 5.14. Crop pattern on irrigated lands of the Podshaota -Chodak sub-project ........................................................66
 
Figure 5.15. Isfayramsai-Shakhimardan sub-project area ......................................................................................................67
 
Figure 5.16. Chimyon-Avval groundwater deposit...................................................................................................................70
 
Figure 5.17. Crop pattern on irrigated lands of the Isfayram-Shakhimardan sub-project................................................72
 
Figure 5.18. Sub-project area in Savay- Akburasai Irrigation system ...................................................................................73
 
Figure 5.19. Crop composition of Savay- Akburasai sub-project...........................................................................................77
 
Figure 6.1. Water balance scheme in Podshaota-Chodak project area ............................................................................ 103
 
Figure 6.2. Water balance scheme in Isfayram-Shakhimardan project area.................................................................... 106
 
Figure 6.3. Water balance scheme in Savai -Akburasai project area .................................................................................. 108
 
Figure 6.4. Line scheme of Project impacts on the Syrdarya river flow (in the situation “With Project” and “Without 
Project”) .................................................................................................................................................................. 112
 
 