Tco-3-20-004vB 22/05/2016


Download 86.95 Kb.
Pdf ko'rish
Sana14.08.2018
Hajmi86.95 Kb.

 

 

 



 

 

 



 

 

Sandy Ridge Facility 



 

 

 



 

 

 



 

TCO-3-20-004vB 

22/05/2016 

 

 

Revision 

Date 

Description 

 

Signatures 

 

 

 



 

Originator 

Checked 

Approved 

B 

22/05/2016 

Approved 

DV 


MI, RP, SR 

DV 


 

 

 

 

 

 

 

A: 

Suite 2, Level 10, 151 Castlereagh Street Sydney NSW 2000



 

T: 


+61 2 8257 3395 

F: 



+61 2 8233 6199

 

W: 



Tellusholdings.com.au 

ABN: 



97 138 119 829

 


TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

 

 

Key Features of the Proposed Sandy Ridge Facility

 

 



Tellus Holdings Ltd (“Tellus”) 

 



 

Tellus is an infrastructure development company in the business of creating economic, social and 

environmental value from waste salt and clay resources 

 



Tellus supports releasing valuable materials back into the circular economy or storing them safely 

until they can. 



 

Project

 



 

The Proposal is to develop a dual revenue business comprising a kaolin open cut mine for kaolin clay 

sales used in ceramics and using the voids resulting from mining for the secure storage and isolation 

of hazardous and intractable waste and recovery of valuable materials using a best practice safety 

case (“Facility”). 

 

 



Key benefits

 



 

Unique dual revenue business that commercialises an industrial bulk commodity kaolin and provides 

safe management solutions for difficult to manage hazardous waste resources 

 



Future potential recovery of valuable materials 

 



Long term jobs, major investment and business opportunities in remote regional Australia 

 



Diversification of the economy by an environmental infrastructure business with strong social, 

environmental and economic values 

 

Royalties, taxes and levies over 25 year term could support other parts of the economy 



 

Employment and business opportunities that can support local and wider communities. 



 

 

Location

 



 



Located approximately 140 km north-west of Kalgoorlie, Western Australia (WA). 

 

 



Project life

 



 

26 years - site can be expanded for generations (1 year build, 25 year operation). 

 

 

Jobs



 

 



Jobs during the build phase: approximately 90 

 



Jobs during the operation phase: approximately 23 direct and 46 indirect (2x multiplier). 

 

 



Strategy

 



 

The proposed development reflects the objectives of the Government’s regional economic 

development agenda  by diversifying the economy by providing an environmental utility business 

that  can increase trade, provide long term jobs in regional Australia and provide enabling 

infrastructure  services to the mining, oil and gas, manufacturing, utility and agricultural industry. 

 

 



TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

 

 

Geology

 



 

260 million year old  Sandy Ridge kaolin is approximately 160 km long, 20 km wide, flat, 6 m  deep, 

kaolin thickness 7 to 24m thick, average 14m 

 



Weathering of the granite has been in two phases: 

o

 



Phase 1 started 260 M years and finished 70 M years ago 

o

 



Phase 2 started 55 M years and finished 15 M years ago

 



 

A thick impermeable silcrete layer above the kaolin was formed about 15 M years ago when the 

climate became arid. 

Commodity Quality

 



 

Primary kaolin type, export quality predominantly suitable for tableware ceramics. Also suitable for 

glass fibre, ceramics, paint and other industrial applications in the growing Asian market. 

 

 



JORC Resource

 



 

41.3 million tonnes kaolinised granite Inferred Resource 

 

Refer to Media Release 19 June 2014 Sandy Ridge – JORC Resource Estimation. 



 

 

Climate

 



 



Climate - Semi-arid desert Mediterranean 

 

 



Surface (hydrology)

 



 

Rainfall - over 250 mm per annum, evaporation greater than 2,000 mm per annum 

 

 

Ground water (hydrogeology)



 

 



No water table. This is due to any rain being absorbed by shallow surficial sands and then 

evaporated or evapo-transpirated and the impermeability of the deeper geologic profile 

 

No credible scenario can be developed that involves generation of a saturated zone and migration of 



a contaminated plume from the isolation cells 

 



This is further confirmed by the fact that monitoring wells in the area have been tested for more than 

20 years and have always been dry. 

 

 

Environmental suitability for an arid near surface geological repository



 

 



Geologically stable - It has very low seismicity and no volcanic or tectonic activity 

 



Natural geological barrier 

o

 



Clay bed is laterally extensive, thick, has been stable for millions of years, and is capped by a 

natural store and release type impermeable layer 

o

 

The in situ clay has very low permeability 



o

 

When combined with the thickness and extent of the clay it will not transmit waste off-site, 



even if a solute (water) was present 

 



Other features: Very low rates of erosion; lack of commercial mineral deposits; it is an area of 

extremely low population (non-permanent camp approximately 52 km away); no potential for 

medium to high value agriculture; the site has no special environmental features and no special 


TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

cultural  or historical significance has been identified through a completed heritage study and 

consultation  with stakeholders familiar with the area 

 



There is little credible risk to human health or the environment from suitably conditioned and 

packaged wastes that might be stored and isolated at the Sandy Ridge Facility 

 

To further underpin this assertion the Mount Walton East Intractable Waste Disposal facility (IWDF), 



Australia's only Class V waste disposal  facility is located immediately to the east of the 

development envelope as the locality has previously  been recognised for its suitability for 

intractable wastes and has a 22 year safe operating history. 

Assets

 



 

100% owned by Tellus 

 

One granted exploration license, 59 km



over Sandy Ridge kaolin on the Yilgarn Craton 

 

Mining Lease 16/540 applied for in August 2015. 



 

Project stage

 



 

Completed Scoping Study (FEL1) -  Concluded that the Project is technically feasible and economically 

viable and has no fatal flaws 

 



Completed 216 drill-holes (5,917m) 

 



Installed 7 hydrogeological drill holes, additional 6 planned April 2016, (confirm clay bed is dry) 

 



Installed automatic weather station 

 



Environmental fieldwork studies and geotechnical analysis advanced or complete 

 



Completed kaolin pilot – 39 tonne bulk sample processed to produce 9 tonnes of products. Market 

acceptance trials (UK and Asia) at tableware ceramics labs and factories are favourable 

 

Completed independent Value Engineering Studies – identified project definition improvements, 



concluded that the Project is technically feasible and has no fatal flaws 

 



Completed final Pre-Feasibility Study (FEL2) concluded that the Project is technically feasible and 

economically viable and has no fatal flaws 

 

Finalising Bankable Feasibility Study (FEL 3) plan and commencing BFS. 



 

 

Next steps

 



 



Complete Bankable Feasibility Study (FEL3) and Final Investment Decision (FID) 

 



Obtain all necessary regulatory approvals and permits 

 



Undertake additional stakeholder engagement 

 



Early Contractor Involvement (ECI) delivery model selected with intent to develop wrapped Engineer, 

Procure, and Construct (EPC) contract with the Lead ECI Contractor. 

 

 

History



 

 



Sandy Ridge is located adjacent to the WA Governments Mt Walton Intractable Waste Disposal facility 

that has operated safely for over 22 years. 

 

 

Site features



 

 



Surrounding area is all Unallocated (vacant) Crown Land 

 



Relatively close connections to existing rail and road links 

 



Infrastructure, power and water will be constructed on site. 

 

 



Infrastructure features – above ground

 


TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

 



Kaolin Production Stage One: 12,000 tonnes per annum (tpa) 

 



Kaolin plant built to a 40,000 tpa capacity 

 



Stage Two: scale up depending on demand 

 



Upgrade of 100km existing access road to Great Eastern Highway 

 



40 man accommodation village with drive in – drive out staffing 

 



2.5MW diesel power generation 

 



124,000 kL per year water supply with Reverse Osmosis 

 



Kaolin and waste laboratories 

 



Container yard, inspection facilities, materials storage warehouse and, workshop facilities 

 



120m x 65m re-locatable cover over waste storage cell to prevent rainfall ingress and to provide all- 

weather operations 

 

Associated infrastructure including all workshops, offices, hardstand areas, car parks, weighbridge, 



vehicle wash down facility and sealed roads on site 

 



Ancillaries including perimeter security fencing, security gates, rain water harvesting, fire suppression 

system, gas and water monitoring, signage, landscaping and drainage. 

 

Infrastructure features – mining

 



 

Mining method is free-dig open pit using backhoe excavator and articulated trucks 

 

Converted mine pits to engineered clay cells to be 120m long, 60m wide and 23 to 30m deep 



 

Storage and permanent isolation of wastes in voids left from mining. 



 

 

Operational features - kaolin

 



 



First kaolin sales - based on a staged development program 

 



Wet kaolin processing – wash, screen, cyclone, dewater press, dry and bag 

 

 



Operational features – transport of kaolin materials

 



 

Containers - transport of 1 ton bulker bags in shipping containers 

 

Route - road train from Facility to port 



 

Export from Fremantle Port to Asia via container ship. 



 

 

Operational features – transport of storage materials

 



 



Waste packaging and transport systems risk assessed and to be appropriate for the type and nature of 

the waste material 

 

Typical waste packaging comprises multiple packaging layers will be utilised during transport storage 



and isolation. Typically a minimum of two containment layers and often three e.g. plastic lined steel 

drums on a pallet, strapped together, wrapped or hazardous waste rated (double layered) one tonne 

bulker  bags 

 



Pallets placed in sealed 20 or 40 foot shipping containers 

 



Materials always transported “like with like” from various locations in the region to the Sandy Ridge 

Facility 

 

Transport mostly via rail to Kalgoorlie and then road from Kalgoorlie to Sandy Ridge on a regular basis 



 

Only appropriately licensed reputable logistics companies used 



 

Transport to site only with Tellus’ approval (Tellus QA/QC system). 



 

 

Operational features - storage

 


TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

 



First storage sales - subject to approvals, currently under review 

 



By storing “like with like materials” this not only achieves safe storage but also creates opportunities 

for the future long-term, storage, treatment and recovery of valuable materials or the permanent 

isolation of waste 

 



Todays “like with like” waste storage cells potentially become the “mines of tomorrow” 

 



Tellus’ business model mirrors world’s best practice solutions operating in Europe, USA and Canada 

 



The development will start at between 20 - 50,000 tpa but will have licenced capacity of 100,000 

tonnes per annum of Class IV and V Hazardous and Intractable wastes. This is  to accommodate for 

one off campaign  style Emergency Service infrastructure requirements due to a man-made or natural 

disaster  where significant volumes of materials need to be rapidly removed from communities, or 

one off  campaign style transfer of significant mine dumps or tailing ponds containing waste resources 

from a large industrial customer

 



 



Typically, waste during steady state operations will be stored on the surface for no longer than a few 

days before being placed in a cell for storage (retrievable) or permanent isolation (disposal) 

 

Customers - wholesale only 



 

Hours of operation, one shift per day, 8-5pm, seven days a week for unloading and four days for 



waste handling operations and kaolin production. 

 

Safety case

 



 



Tellus' Sandy Ridge safety case is both a written presentation and an operational requirement dealing 

with the technical, management and operational information regarding the hazards and risks of our 

operations and how they are managed and mitigated. 

 



It considers the transport, construction, operation and closure of the Facility drawing on best practice 

examples from around the world which are internationally recognised as suitable to host a geological 

repository. 

 



Tellus will only accept wastes at the Facility if they meet strict waste acceptance criteria and will store 

compatible “like with like” wastes to ensure operational safety and create opportunities for the future 

recovery and reuse of valuable materials. 

 



The safety case is underpinned by the dry arid desert environment and our multi-barrier system

which provides long term containment and isolation. 

 

Waste accepted

 



 

The facilities’ primary objective is to provide West Australia with a licensed Facility that safely allows 

for the storage, treatment, recovery and permanent isolation of bulk waste products 

 



Some of these products may be classified as dangerous or hazardous goods, such as those listed 

wastes under Schedule 1 of  the National Environment Protection (Movement of Controlled Waste 

between States and  Territories) or NEPM 75 

 



The primary source of waste is from industries that use chemicals or compounds in production and 

these may include the aluminum industry, oil drilling and refining (petroleum) industry, the chemical 

and plastic industries, agricultural and pesticide, manufacturing and mining  industry 

 



The Facility may receive Naturally Occurring Radioactive Materials (NORM’s) arising from the mining, 

oil and gas and agricultural fertiliser industry. Tellus will be applying for a Licence (Controlled Action) 

to accept non-nuclear low level radioactive wastes (LLW) such as medical isotopes and sealed 

industrial sources etc. 

 

Waste not accepted

 



 

Nuclear Waste as defined in the Nuclear Waste Storage and Transportation (Prohibition) Act 1999 

 

Intermediate level (ILW) and High level radioactive waste (HLW) 



 

Infectious or clinical materials (excluding pharmaceuticals) 



TELLUS HOLDINGS LTD 

Key Features of the Proposed Sandy Ridge Facility 

TCO-3-20-004vB 22/05/2016 

 



 

 



Uncertified waste (material of unknown origin or chemistry) 

 



Biodegradable wastes - materials which materially decompose (putrescible waste), including 

vegetable matter (food and garden waste) and organic materials 

 

Biodegradable wastes - animal matter - effluent and residues (abattoir effluent, poultry and fish 



processing wastes) 

 



Grease trap waste 

 



Sewage sludge and residues including nightsoil and septic tank sludge 

 



Liquid wastes which cannot be solidified and stabilised before being placed in a cell.

 

 



 

 

Summary of services

 



 



Australia is the world’s second highest emitter of hazardous waste on a per capita basis 

 



The dual use Facility is designed to mine and process kaolin for export and also act as a storage, 

recovery  and permanent isolation facility for equipment and waste materials from the mining, oil 

and gas,  manufacturing and agricultural sectors 

 



The Facility would also provide the WA Government with enabling infrastructure that can accept and 

appropriately manage waste materials generated through normal business and unforeseen man 

made or natural disasters 

 



When the Facility becomes operational, materials would be transported into the engineered clay cells 

for storage or permanent isolation 

 

Recovery opportunities of valuable materials will be pursued and will most likely be subject to 



additional regulatory approvals. 

 

 



 

[End]


 

Document Outline

  • TCO-3-20-004vB
    • Tellus Holdings Ltd (“Tellus”)
    • Project
    • Key benefits
    • Location
    • Project life
    • Jobs
    • Strategy
    • Geology
    • Commodity Quality
    • JORC Resource
    • Climate
    • Surface (hydrology)
    • Ground water (hydrogeology)
    • Environmental suitability for an arid near surface geological repository
    • Assets
    • Project stage
    • Next steps
    • History
    • Site features
    • Infrastructure features – above ground
    • Infrastructure features – mining
    • Operational features - kaolin
    • Operational features – transport of kaolin materials
    • Operational features – transport of storage materials
    • Operational features - storage
    • Safety case
    • Waste accepted
    • Waste not accepted
    • Summary of services


Download 86.95 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2020
ma'muriyatiga murojaat qiling