All population may be extinct. In America in 20 century,carbhuntion overvelmin and after this


Download 71.18 Kb.
Sana05.01.2022
Hajmi71.18 Kb.
#230144
Bog'liq
Hurramshox

  • An EIA is an important process for evaluating the likely environmental impact of a proposed project. It makes a scientific estimate of the likely impacts of a project, such as a mine, irrigation dam, industrial unit or waste treatment plant. It is a process whereby people’s views are taken into consideration for granting final approval to any developmental project or activity. It is basically, a decision-making tool to decide whether the project should be approved or not.
  • Some prosesse not only impact to the enviormrnt but also to the social and economy,real example of this fishing,as we know there is time to fishing because of breadin of the fish it is prohibited to hunt or fish ,because it impact to the food chain in ocean or sea ecosystem or in another word if one part of chain break down
  • all population may be extinct .In America in 20 century ,carbhuntion overvelmin and after this
  • The draft notification is issued under the powers vested in the central government under the Environment (Protection) Act, 1986 to take all such measures for “protecting and improving the quality of the environment.
  • According to the government, the new notification is being brought in order to make the process more transparent and expedient by the implementation of an online system, further delegation, rationalisation and standardisation of the process. However, the environmentalist said that the draft will further dilute the EIA process.
  • Also in Uzbekistan not only our country but also in borderd countris Orol sea problem.dehydreation of sea salt which abandond on earth fly to air and impact to the peoples’ inhalation sytem
  • This dust plames contains mainly salt which enter to the human body and does not dugessted and reamin afte long time it became a stone
  • Screening: The project plan is screened for scale of investment, location and type of development and if the project needs statutory clearance.
  • Scoping: The project’s potential impacts, zone of impacts, mitigation possibilities and need for monitoring.
  • Collection of baseline data: Baseline data is the environmental status of study area.
  • Impact prediction: Positive and negative, reversible and irreversible and temporary and permanent impacts need to be predicted which presupposes a good understanding of the project by the assessment agency.
  • Mitigation measures and EIA report: The EIA report should include the actions and steps for preventing, minimizing or by passing the impacts or else the level of compensation for probable environmental damage or loss.
  • Public hearing: On completion of the EIA report, public and environmental groups living close to project site may be informed and consulted.
  • Decision making: Impact Assessment Authority along with the experts consult the project-in-charge along with consultant to take the final decision, keeping in mind EIA and EMP (Environment Management Plan).
  • Monitoring and implementation of environmental management plan: The various phases of implementation of the project are monitored.
  • Assessment of Alternatives, Delineation of Mitigation Measures and Environmental Impact Assessment Report: For every project, possible alternatives should be identified, and environmental attributes compared. Alternatives should cover both project location and process technologies.

Download 71.18 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling