An examination of public-private partnerships


Download 1.66 Mb.
Pdf ko'rish
bet7/15
Sana20.10.2023
Hajmi1.66 Mb.
#1712111
1   2   3   4   5   6   7   8   9   10   ...   15
Bog'liq
Vrooman An Examination of Public-Private Partnerships Partnership Structure, Policy Marking, and Public Value 2012 Sislen

University o
more solicited
ated by the U
ersity System
rate a new pa
pment would 
parking within
designed to a
te to approve
of Baltimore
d developme
University of B
m in the State 
arking facility,
displace the c
n close proxim
allow develop
e the best fit f
e – Fitzgera
nt proposals 
Baltimore (UB
of Maryland.
student hou
current UB st
mity during th
pment teams 
for the public
ald – Baltim
for the redev
B). The Unive
. The Univers
sing, and offi
taff and stude
he developme
to take some
c good. 
more, MD 
velopment of
ersity of Baltim
sity required 
ice space into
ent parking, t
ent and const
e liberties in t
Pa
f four parcels 
more is fiscal
the 4.26 acre
o the new pro
the developer
truction of th
their proposa
age 33 
that 
ly 

oject.
r was 

als 


Page 34 
The agreement was a 65‐year ground lease with the developer with a one time 10‐year extension. The 
approved development proposal included a structured parking garage with 1,240 spaces, 14,000sf of 
retail space, and 275 residential units. The development would improve the urban area, remain at a 
pedestrian scale, respect the UB institutional standards, provide a parking facility for students, faculty, 
and residents, take advantage of the public MTA light rail and bus networks, and provide housing 
options for students at University of Baltimore, Maryland Institute of Art (MICA), and area professionals.
The developer partnership developed and built the parking facilities and residential apartments. The 
development partners also operate and maintain the facilities under the University of Baltimore the 
ground lease agreement. The development was privately financed and the University of Baltimore 
required the developer to have some ‘skin in the game’. The cash flows from the property were 
negotiated to be provided to the developer until the preferred return was realized, after which time; a 
profit sharing agreement with the City of Baltimore goes into effect. 
The land ownership is maintained by The University of Baltimore. The development team chosen was a 
joint venture development team that contributed a total of 10% equity in the project. This requirement 
was specified by The University of Baltimore to ensure that the development team had “skin in the 
game”. Other equity financing was provided by NYSTRS and former Baltimore Raven Michael McCrary.
PILOT financing was also integrated into the project where the taxes were incrementally increased over 
the life of the project. According to the developer, the project could not have proceeded without the 
Download 1.66 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   10   ...   15




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling