Results 
Cage 1 
Cage 2 
Cage 3 
Cycle 1 
Seeding week 



Harvesting week 
35 
30 
39 
Feed 
F3 
F3 
F3 
Seabream 
Fingerling Weight 
30 
30 
30 
Cycle 2 
Seeding week 
44 
38 
46 
Harvesting week 
89 
81 
85 
Feed 
F1 
F2 
F1 
Seabream 
Fingerling Weight 
30 
30 
30 
Closeness: 0.61 
Table 5 – Candidate solution 2 
506 
As can be seen from Table 5, these constraints have forced the methodology to find a strategy 
507 
that splits the harvesting process, leaving a month between each cage. Furthermore, the cage is 
508 
now harvested over the four following weeks. 
509 
5.2.3 Weekly constraints on minimum production 
510 
Lastly, the capacity of the developed PSO algorithm to obtain good results in even more complex 
511 
CO problems is tested. With this aim in mind, a minimum volume of harvested fish on specific 
512 
dates in order to comply with commercial commitments was also included, in addition to the 
513 
aforementioned constraints.
514 
Specifically, it is assumed that the farm agreed to sell 0.5 Tons of gilthead seabream weighing 
515 
around 300 g in the following four weeks: 30, 50, 70, 90. This constraint forces the methodology 
516 
to find a strategy in which there are not two different point in which all the cages are harvested, 
517 
but rather that the process is carried out in a more distributed way. This would allow the company 
518 
to obtain profits in a sustained manner throughout the year, but it also makes the problem much 
519 
more complex. 
520 
In this scenario, there are a vast majority of regions of the search space where the constraints are 
521 
not met. This new situation forces us to increase the number of particles to 120, thus covering a 
522 
larger area, since the algorithm may sometimes not find a feasible solution if only 90 particles are 
523 
used. Those issues are discussed further in the next section. 
524 
Finally, these constraints were met and the harvesting dates shifted to separate areas (Table 6). 
525 

Download 0.56 Mb.

Do'stlaringiz bilan baham:
1   ...   9   10   11   12   13   14   15   16   17




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling