Grand Coulee Dam and the Columbia Basin Project usa final Report: November 2000


Download 5.01 Kb.
Pdf ko'rish
bet31/31
Sana08.10.2017
Hajmi5.01 Kb.
#17398
1   ...   23   24   25   26   27   28   29   30   31
 

Document Outline

  • Cover Page
  • Disclaimer
  • The WCD Knowledge Base
  • Acknowledgements
  • Financial and in-kind Contributors:
  • Study Team
  • Executive Summary
  • Contents
  • List of Annexes
  • Acronyms and Abbreviations
  • The World Commission on Dams Global Case Study Programme
  • Context and Scope of the Grand Coulee Dam and Columbia Basin Project Case Study
    • Major Features of the Columbia River Basin
    • Objectives and Components of GCD and CBP
    • Major Design Characteristics and Time Schedule for Implementation
      • Attributes of the Grand Coulee Dam
      • Description of the Columbia Basin Project
      • Timing of Construction
  • Projected and Actual Impacts of the Grand Coulee Dam and Columbia Basin Project
    • Irrigation
      • Predicted vs. Actual Area Under Irrigation
      • Predicted vs. Actual Agricultural Production
      • Predicted vs. Actual Farm Size
      • Investment Costs and Cost Recovery
      • Secondary or Indirect Benefits
      • Negative Irrigation Effects
      • Benefits from Small Scale Hydropower
      • A Qualitative Benefit-cost Appraisal of CBP
    • Hydropower
      • Projected vs. Actual Costs for Grand Coulee and its Powerplant
      • Influence of World War II on Hydropower
      • Predicted vs. Actual Power Generation and Capacity
      • Grand Coulee Dam in the Context of the Federal Hydropower System
      • Power Demand and Characteristics of Power Users
      • Economic Benefits of Hydropower Production
      • Unexpected Benefits of Hydropower Production
    • Flood Control
      • Predicted Benefits
      • Flood Control Operations Before 1973
      • Flood Control Operations After 1973
      • Unexpected Flood Control Benefits, Costs, and Impacts
    • Recreation and Tourism
      • Predicted Benefits
      • Actual Recreational Facilities and Use
      • Recreational Issues
    • Ecosystem Impacts
    • Social Effects: Non-indigenous Peoples
      • Construction-related Employment
      • Commercial and Sport Fishing
      • Displacement and Resettlement of Non-indigenous People
      • Development within the Columbia Basin Project Area
      • Social Tension in the US Northwest: the Symbolic Value of Salmon
    • Effects on Native Americans in the US
      • Pre-Project Conditions
      • Centrality of Salmon to Economic, Cultural, and Spiritual Life
      • Pre-Construction Consultation with Tribes
      • Project Impacts on Native Americans
      • Anadromous Fish
      • Inundated Homes and Communities
      • Burial and Archaeological Sites
      • Riparian Habitat
      • Loss of Access to Columbia Plateau
      • Tribal Health
      • Timber and Mines
      • Modern Tribal Economies
      • Claims Cases
      • Benefits of GCD for Tribes
    • Effects on First Nations in Canada
      • Pre-Project Conditions
      • Project Impacts on First Nations
  • Basin-Wide Impacts and Operations
    • The 1932 Butler Report as a Plan for the Upper Columbia Basin
    • Influence of GCD on Decisions to Build other Water Projects in the Basin
      • Effect of GCD on Projects in the US
      • Influence GCD on projects in Canada
    • Effects of the Treaty Dams on Canadian Resources and People
      • Environmental and Social Impacts of the Treaty Dams
      • Programmes to Compensate Communities Adversely Affected by Canadian Treaty Dams
    • Cumulative Impacts of Projects on Ecosystems
      • Basin-wide Factors Affecting Anadromous Fish
      • Larger Ecosystem Effects
    • Cumulative Socioeconomic Impacts
    • System Operations
    • Evolution of Basin-wide Planning Institutions
  • Distribution of Benefits and Costs
    • Anticipated Beneficiaries and Cost Bearers
    • Major Project Beneficiaries and Cost Bearers
      • Major Beneficiaries
      • Major Cost Bearers
    • Stakeholder Perspectives
      • Tribes and Environmental Organisations
      • Cost Allocation and Repayment
      • Cost Allocation
      • Repayment
      • Basin-wide Accounting
  • Options Assessments and Decision-making Processes
    • Decision to Build a Dam at the Grand Coulee
    • Early Attempts to Compensate Native Americans for Expected Losses
    • Columbia Basin Joint Investigations
    • Acreage Limitations and Anti-Speculation Statutes
  • Criteria and Guidelines: Policy Evolution and Compliance
    • Columbia River Treaty
    • Pacific Northwest Co-ordination Agreement
    • Authorisation and Construction of Third Powerplant
    • Environmental Impact Assessment Requirements
    • Northwest Power Planning Act of 1980
    • System Operation Review
    • Endangered Species Act Listings and NMFS Biological Opinions
    • Decision Not to Irrigate Second-Half Lands
    • Direct Funding Agreements between Reclamation and BPA
  • Lessons Learned
    • Open Planning Process
    • Managing Debates on Project Operations
    • Incorporating Changing Social Values into Operations
    • Incorporating Changes in Science and Technology into Operations
    • Sensitivity Analysis of Economic Parameters
    • Developing a Shared Conceptual Framework for Project Appraisal
    • Mechanisms for Ensuring Just Compensation
    • Limits to Government Planning in a Market Economy
    • Centralised Versus Decentralised Basin Management Institutions
    • Actions Having Significant, Irreversible Effects
    • Cumulative Impact Assessment
  • Reflections on the Development Effectiveness of GCD and CBP
    • Criteria for Gauging Effectiveness
    • Temporal Shifts in Weights Ascribed to Different Effectiveness Criteria
    • GCD and CBP: Trade-offs Between Regional Development and Economic Efficiency
    • GCD and CBP: Trade-offs Between Regional Development, Equity, and the Environment
  • References
  • Interviews and Personal Communication

Download 5.01 Kb.

Do'stlaringiz bilan baham:
1   ...   23   24   25   26   27   28   29   30   31




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling