The world bank monthly operational summary
(R) Senegal River Basin Integrated Multimodal Transport
Download 1.7 Mb. Pdf ko'rish
|
(R) Senegal River Basin Integrated Multimodal Transport: The objective is to restore the river transport vocation of the Senegal River and to enhance the latter by connecting it to a system that integrates all other types of ground transportation. Project Concept Review Meet- ing scheduled for mid-July 2010. Environmental Assessment Category A. US$ 430.0 (IDA Credit). Consulting services to be determined. Or- ganisation pour la Mise en Valeur du Fleuve Senegal (OMVS), 46, rue Carnot, Dakar, Senegal, Tel: (221) 823-4530, Fax: (221) 822-0163, E-mail: OMVSSPHC@omvs.org, Contact: Mohamed Salem Ould Merzoug Merzoug, Haut Commissaire Southern Africa Trade and Transport Facilitation: The objective is to enhance economic growth in Southern Africa by facilitating the movement of goods and people as well as fostering regional integra- tion among Botswana, DRC, Malawi, Zambia and Zimbabwe. Prepa- ration is underway. Environmental Assessment Category B. US$ 130.0 (IDA Credit). Consulting services and implementing agency(ies) to be determined.
ation safety, security and regional integration amongst all five East Africa Community states. Project Concept Review Meeting scheduled for 31 January 2011. Environmental Assessment Category C. US$ 123.0 (IDA Credit). Consultants will be required. Kenya Civil Aviation Authority, PO Box 30163, PO Box 52692-00200, Nairobi, Kenya, Tel: (254-20) 827-470/475, Fax: (254-20) 824-717, E-mail: info@kcaa.co.ke, Contact: N. Bodo, Acting Director General. Rwanda Civil Aviation Au- thority, Kigali International Airport, PO Box 1122, Kigali, Rwanda, Tel: (250) 582-809, E-mail: rmasozera@caa.gov.rw, Contact: Dr. Richard Masozera, General Manager. Uganda Civil Aviation Authority, PO Box 5336, Kampala, Uganda, Tel: (256-41) 332-000, Fax: (256-41) 320-571, E-mail: wrmakuza@caa.co.ug, Contact: Dr. Rama Makuza, Director Gen- eral. Tanzania Civil Aviation Authority, PO Box 2819, Dar es Salaam, Tanzania, Tel: (255-22) 211-1951, Contact: Margaret Munyange, Director General. Regie Des Services Aeronautiques, B.P. 694, Bujumbura, Bu- rundi, Tel: (257-2) 225-4150, Fax: (257-2) 222-3707, E-mail: rsa@cbif.com, Contact: Joseph Bangurambona, Manager Eastern Africa Transport Links Improvement: The objective is to improve transport services along key trade corridors in Eastern Africa for Kenya, Ethiopia, Uganda, Tanzania, Rwanda and Burundi. Prepa- ration is underway. Environmental Assessment Category B. US$ 300.0 (IDA Credit). Consulting services and implementing agency(ies) to be determined. Water, Sanitation and Flood Protection Burundi and Rwanda-Lake Victoria Environmental Manage- ment: The objective is to prepare a second Adaptable Program Loan AUGUST 2010 Monthly Operational Summary PAGE 25
(APL2) of the Lake Victoria Environmental Management Project II (LVEMP II) that includes five basin countries: Burundi, Kenya, Rwanda, Tanzania, and Uganda. Decision Meeting scheduled for 19 October 2010. Environmental Assessment Category A. Project: P118316. US$ 30.0 (IDA Credit). Consulting services to be determined. Ministry of Natural Resources, PO Box 3502, Kigali, Rwanda, Tel: (250-25) 258-2628, Fax: (250¬25) 258-2629. Ministry of Urban and Rural Planning and Environment, Bujumbura, Burundi, Tel: (257-2) 222-0626
the basin’s water resources, biodiversity and environment by: (a) developing a framework for basin-wide water resources and environ- mental management; and (b) capacity building for OMVG related to water resources and environmental management. Project Concept Re- view Meeting scheduled for 2 December 2010. Environmental Assess- ment Category B. US$ 8.0 (GEFU). Consulting services and imple- menting agency(ies) to be determined. Rwanda Education Skills Development: The objective is to support the Government to improve the skills base of the labor force in line with the Economic Development and Poverty Reduction Strategy growth objectives. Preparation is underway. Environmental Assessment Category B. Pro- ject: P118101. US$ 30.0 (IDA Credit). Consulting services and imple- menting agency(ies) to be determined. Energy and Mining Electricity Access Scale-up and Sector Wide Approach (SWAp) Development: The objective is to improve access to reliable and cost- effective electricity services for households and priority public institutions. Bank Approval completed on 15 October 2009. Environ- mental Assessment Category B. Project: P111567. US$ 70.0/10.0 (IDA Credit/OPEC). Consultants will be required. Rwanda Electricity Corporation (RECO), B.P. 537, Rwanda, Tel: (250) 573-666, Fax: (250) 572-976, Contact: Rafique Cassamo, Project Coordinator
support the Government of Rwanda’s social protection and health policy reforms designed to reduce extreme poverty, initially in 30 pilot sectors, and to expand access to high-impact health, nutrition and population interventions at community level. Project Concept Review Meeting scheduled for 30 November 2010. Environmental Assessment Category U. US$ 6.0 (IDA Grant). Consultants will be required. Ministry of Fi- nance and Economic Planning, PO Box 158, Rwanda, Tel: (250) 75438, Fax: (250) 77581; Ministry of Local Government, PO Box 3445, Kigali, Rwanda, Tel: (250) 582-229; Ministry of Health, PO Box 84, Kigali, Rwanda, Tel: (250) 574-458, Fax: (250) 570-541
Government’s social protection and health policy reforms designed to reduce extreme poverty, initially in 30 pilot sectors, and to expand access to high-impact health, nutrition and population interventions at the community level. Bank Approval completed on 16 March 2010. En- vironmental Assessment Category U. Project: P117758. US$ 6.0 (IDA Grant). No consultants are required. Ministry of Local Government, PO Box 3445, Kigali, Rwanda, Tel: (250) 582-229, Contact: Majida Al- Masri, Minister
consolidate the Rwandan Renewable Energy market. Bank Approval completed on 15 October 2009. Environmental Assessment Category B. Project: P097818. US$ 3.8/4.5 (ESMP/GEFU). No consultants are required. Rwanda Electricity Corporation (RECO), B.P. 537, Rwanda, Tel: (250) 573-666, Fax: (250) 572-976, Contact: Majida Al-Masri, Minister
economic and social development by improving communication and reducing transport costs. Project Concept Review Meeting scheduled for 26 July 2010. Environmental Assessment Category B. US$ 80.0 (IDA Credit). Consulting services and implementing agency(ies) to be determined. Sao Tome and Principe Agriculture, Fishing, and Forestry Adaptation to Climate Change: The objective is to enable the Government to implement priority climate change adaptation measures. Decision Meeting scheduled for 16 September 2010. Environmental As- sessment Category B. Project: P111669. US$ 1.4/3.3/0.0/0.7/1.0 (ECEU /GEFU/GPOR/GSPNUNDP). Consulting services and implementing agency(ies) to be determined. Health and Other Social Services (R) Social Sector Support Additional Financing: The objective is to scale up critical activities in the social and health sectors to better respond to people’s social needs in both the access and the quality of service delivery. The grant was signed on 22 June 2010. Environmental Assessment Category B. Project: P113113. US$ 2.1 (IDA Grant). Consultants will be required. Agencia Fiduciaria e Administrativa do Projecto, Largo das Alfandegas, Edificio da Planificacao Economica, 1E, Sao Tome and Principe Tel/Fax: (239) 224-665, E-mail: afap2@yahoo.com.br, Contact: Alberto Leal, Project Coordinator
financial and budgetary management and to build up institutional and legal infrastructure in key sectors such as human and natural resources, environment, and finance. Negotiations scheduled for 21 July 2010. Environmental Assessment Category C. US$ 0.8 (IDA Grant). No consultants are required. Governance Capacity Building, Technical Assistance PIU, Largo das Alfandegas, Caxa Postal 168, Sao Tome, Sao Tome and Principe, Tel: (239) 227-302, Fax: (239) 222-182, E-mail: jorgemenezes2000@yahoo.com.br, Contact: Jorge Menezes, Project Coordinator Senegal Agriculture, Fishing, and Forestry (R) Food Security Additional Financing: The objective is to alleviate the food crisis in rice production and productivity. The credit was signed on 21 June 2010. Environmental Assessment Category B. Project: P116301. US$ 10.0 (IDA Credit). Consultants will be required. PDMAS, B.P. 22 579, Ponty, Senegal, Tel: (221-33) 869-6262, Fax: (221-33) 869-6264, E-mail: pdmas@pdmas.org, eawone@pdmas.org, Contact: El Hadji Amadou WONE, Director
improve economic governance through an enhanced investment climate, and improved performance of the judicial system. Signing scheduled for
US$ 8.0 (IDA Credit). No consultants are required. Cellule d’Execution Administrative et Financiere du Programme Sectoriel Justice (CEDAF), Rue 55x70, Fann Hock, Senegal Tel/Fax: (221-33) 842-7299, E-mail: cedafpsj@yahoo.fr, Contact: Ahmadou Tall, Coordonnateur
objective is to strengthen the Government’s policy making and institutional capabilities by supporting selective reforms to: (a) accelerate broad-based growth, (b) improve access to social services, (c) mitigate vulnerabilities and (d) foster good governance. The credit was signed on
US$ 43.0 (IDA Credit). No consultants are required. Ministry of Economy and Finance, Dakar, Senegal, Tel: (221-33) 889-2118, Fax: (221-33) 821- 1630, E-mail: aliounendong@yahoo.fr, Contact: Alioune Ndong, Adviser (R) Sustainable and Participatory Energy Management Phase 2 (Cr. 47590-SN): The objective is to increase the availability of diversi- fied household fuels in a sustainable and gender equitable way, and to increase the income of participating communities while pre-
PAGE 26 Monthly Operational Summary AUGUST 2010 serving the forest ecosystems. Bank Approval completed on 24 June 2010. Signing scheduled for 22 July 2010. Environmental Assessment Category B. Project: P120629. US$ 15.0/4.4 (IDA Credit/NDF). Con- sultants will be required. Direction des Eaux et For, Parc Forestier de Hann, B.P. 1831, Dakar, Senegal, Tel: (221-33) 831-0101, Fax: (221-33) 832-2789, E-mail: sarr.baba52@yahoo.fr, Contact: Baba Sarr, Director
are to: (i) improve effective road management, maintenance and safety, both at national level and in urban areas; and (ii) help improve safety, efficiency and environmental quality of public transport in the Greater Dakar Area. Bank Approval completed on 1 June 2010. Environmen- tal Assessment Category B. Project: P101415. US$ 55.0 (IDA Credit). Consultants will be required. Conseil Executif des Transports Urbains de Dakar (CETUD), Route du Front de Terre, Dakar, Senegal, Tel: (221) 859-4722, Fax: (221) 832-5686, E-mail: cetud@cetud.sn, Contact: Soudou Diagne, Directeur General. Agence Autonome des Travaux Routiers (AATR), Rue David Diop-Dakar Fann, Dakar, Senegal, Tel: (221) 869- 0751, Fax: (221) 864-4833, E-mail: ndiaye@aatr.sn, Contact: Ibrahima Ndiaye, Directeur General
nomic stabilization and initiation of structural reforms in public sec- tor, social sector reforms covering health and education, and improvement of social protection system. Bank Approval completed on 5 November 2009. Environmental Assessment Category U. Project: P114822. US$ 9.0 (IBRD). No consultants are required. Ministry of Fi- nance, Seychelles
Seychelles economic reforms on public administration and private sector development. Project Concept Review Meeting completed on 21
Assessment Category U. Project: P120947. US$ 9.0 (IBRD). Consul- tants will be required for private sector development policy dialogue needed during preparation. Implementing agency(ies) to be deter- mined.
jective is to improve management of priority wetland ecosystems as part of the national framework on conservation in Sierra Leone. Pro-
B. Project: P115836. US$ 1.8/1.9 (GEFU/ZBIL). Consulting services to be determined. Ministry of Agriculture, Forestry, and Food Secu- rity, Sierra Leone, E-mail: majelarnett@yahoo.co.uk, Contact: Kate Garnett, Chief of the Conservation Unit
generation and transmission and distribution investments. Project Concept Review Meeting scheduled for 15 October 2010. Environ- mental Assessment Category B. US$ 15.0 (IDA Credit). Consulting services and implementing agency(ies) to be determined.
tive is to provide guidance and support to the government of Sierra Leone to develop its financial sector. Decision Meeting scheduled for 10
Credit). Consulting services and implementing agency(ies) to be de- termined.
contribute to the ten year goal of reducing maternal and child mortality by increasing utilization of a basic package of essential health services (BPEHS) by pregnant women and children under the age of five and strengthening the health system. Grant Funding Request was approved
P110535. US$ 20.0 (ACGF). Consultants will be required. Ministry of Health and Sanitation, 5th Floor, East Wing, Youyi Building, Brookfields Bank of Sierra LeoneBuilding, Freetown, Sierra Leone, Tel: (232-22) 242-119/240-068, Fax: (232-22) 241-527, E-mail: minhs@sierratel.sl/ mykedauda2006@yahoo.co.uk, Contact: Dr. Magnus Gborie Mr. Michael Dauda, Coordinators
ties and to improve employability of targeted youth. Bank Approval completed on 30 June 2010. Environmental Assessment Category B. Project: P121052. US$ 11.0/9.0 (IDA Credit/IDA Grant). No consul- tants are required. Ministry of Finance and Economic Development, Government of Sierra Leone, Geroge Street, Freetown, Sierra Leone, Tel: (232-22) 225-612, Fax: (232-22) 228-355, E-mail: minfin@sierra- tel.sl, Contact: Pham Le Thanh, President and CEO Decentralized Service Delivery Program II: The objective is to help central government protect and increase transfers to local govern- ments, finance gaps for priority activities under the mandate of local councils in education, health, water and sanitation and solid waste management as well as capacity development and improvements be- tween local councils, citizens and civil society. Project Concept Review Meeting scheduled for 15 February 2011. Environmental Assessment Category B. US$ 15.0 (IDA Credit). Consulting services and imple- menting agency(ies) to be determined.
able development in the context of Sierra Leone’s Poverty Reduction Strategy, following the Second and Third Governance Reform and Growth Grant. Decision Meeting scheduled for 19 October 2010. Envi- ronmental Assessment Category U. US$ 7.0 (IDA Credit). Consulting services to be determined. Ministry of Finance and Economic Devel- opment, Government of Sierra Leone, Geroge Street, Freetown, Sierra Leone, Tel: (232-22) 225-612, Fax: (232-22) 228-355, E-mail: minfin@sier- ratel.sl
objective is to use Crisis Response Window Resources to mitigate the effects of the global economic downturn on Sierra Leone and safeguard growth and poverty alleviation. The credit was signed on 18 June 2010. Environmental Assessment Category U. Project: P121056. US$ 7.0 (IDA Credit). No consultants are required. Ministry of Finance and Economic Development, Government of Sierra Leone, Geroge Street, Freetown, Sierra Leone, Tel: (232-22) 225-612, Fax: (232-22) 228-355, E-mail: minfin@sierratel.sl, Contact: Frederic Mvondo, Directeur Gen- eral Adjoint (Coordinator) South Africa Energy and Mining (N) Eskom Renewables Support: The objective is to enable Eskom Holdings to enhance power supply and energy security in an efficient and sustainable manner to support the long-term carbon mitigation strat- egy of South Africa. Decision Meeting scheduled for 5 August 2010. Environmental Assessment Categor y A. US$ 250.0/390.0/100.0 (CCTF/ZBIL/ZMUL). No consultants are required. Eskom, Megawatt Park, Maxwell Drive, Sunninghil, Sandton, South Africa, Tel: (27-11) 800-2901, Fax: (27-12) 323-3263, E-mail: eskom.funding@eskom.co.za Eskom Power Investment Support: The objective is to enable Es- kom South Africa to enhance its power supply and energy security in an efficient and sustainable manner so as to support both economic growth objectives and South Africa’s professed long term carbon mit- igation strategy. Bank Approval completed on 8 April 2010. Environ- mental Assessment Category A. Project: P116410. US$ 3750.0/2000.0 AUGUST 2010 Monthly Operational Summary PAGE 27 (IBRD/ZMUL). Consultants will be required. Eskom, Megawatt Park, South Africa, Tel: (27-82) 414-8118, E-mail: penny.herbst@eskom.com, Contact: Ms. Tamara Babayan, Director Swaziland Health and Other Social Services HIV/AIDS and TB: The objective is to assist the Government of Swazi- land in fighting HIV/AIDS by addressing the major gaps in imple- menting its HIV/AIDS national strategic plan, particularly in health system strengthening and HIV/AIDS related social protection. Ne- gotiations scheduled for 19 July 2010. Environmental Assessment Cat- egory B. Project: P110156. US$ 20.0/18.0 (IBRD/ECEU). Consultants will be required. Ministry of Finance, Finance Building, Usuthu Road, PO Box 443, Mbabane, Swaziland, Tel: (268) 404-8146, Fax: (268) 404- 3187, Contact: Dumisani Masilela, Permanent Secretary. Ministry of Health and Social Welfare, PO Box 5, Swaziland, Tel: (268) 404-2431, Fax: (268) 404-2092, Contact: Dr. Steven Shongwe, Principal Secretary. National Emergency Response Council on HIV/AIDS, PO Box 1937, Swaziland, Tel: (268) 404-1708, Fax: (268) 404-1692, Contact: Derek von Wissel, Director Public Administration, Law, and Justice Local Government: The objective is to strengthen the capacity and resource mobilization functions of the local governance system to de- liver and sustain basic services, in particular to benefit the poorer sec- tions of the population. Negotiations scheduled for 26 July 2010. Environmental Assessment Category B. Project: P095232. US$ 16.1 (IBRD). Consultants will be required. Ministry of Housing and Urban Development, Mhlabanyasi Rd PO Box 1832, Mbabane, Swaziland, Tel: (268) 404-1741/43, Fax: (268) 404-4085, E-mail: nkambulep@gov.sz, Con- tact: Paul Nkambule, Acting Permanent Secretary
Download 1.7 Mb. Do'stlaringiz bilan baham: |
ma'muriyatiga murojaat qiling