    • DMMP’s
      • Cave Hollow
      • Keithsburg
      • Finley's/Hurricane
    • FWS – Pool 15 Mussel Restoration


Pool 22

  • Pool 22

    • Cave Hollow RM 306
      • Mechanical Beneficial Use
  • Pool 21

    • LaGrange RM 336
    • Hogback RM 332
  • Pool 20

    • Buzzard RM 349
  • Pool 18

    • Keithsburg Lower RM 426


Amount Dredged:

  • Amount Dredged:

    • 2,973 cy
  • Placement Site:

    • Thalweg RM 330.8
  • Dredging Depth: 11’

  • Beneficial Use: No

  • Water Quality Monitoring: Per MODOC and ILDNR



Amount Dredged:

  • Amount Dredged:

    • 2 – 28,325 cy (had to suspend to do Keithsburg)
    • 3 – 35,925 cy
  • Placement Site:

    • 2 – Bankline RM 331.5-331.8L
    • 3 – Thalweg RM 330.9
  • Dredging Depth: 11’

  • Beneficial Use: No

  • Water Quality Monitoring: Per MODOC and ILDNR



Amount Dredged:

  • Amount Dredged:

    • 48,705 cy
  • Placement Site:

    • Bankline stockpile RM 336.2 – 336.5R
  • Dredging Depth: 11’

  • Beneficial Use: No

  • Water Quality Monitoring: Per MODOC



Amount Dredged:

  • Amount Dredged:

    • 1 – 8,419cy
    • 2 – 57,102
  • Placement Site:

    • 1 – Thalweg RM 348.6T
    • 2 – DMMP Stockpile RM 348.8-349.1R
  • Dredging Depth: 11’

  • Beneficial Use: Yes

  • Water Quality Monitoring: Per ILDNR & MODOC



Amount Dredged



Amount Dredged:

  • Amount Dredged:

    • 3,907cy
  • Placement Site:

    • Pocket Beaches RM473 L & Buffalo Shores RM471.6R
  • Dredging Depth: 11’

  • Beneficial Use: Yes

  • Water Quality Monitoring: Per ILDNR



Amount Dredged:

  • Amount Dredged:

    • 33,955 cy
  • Placement Site:

    • Buffalo Shores/Beach RM 471.8 &472.6R and Cent. Bridge RM 482.0 L
  • Dredging Depth: 11’

  • Beneficial Use: Yes

  • Water Quality Monitoring: Per IADNR



Amount Dredged:

  • Amount Dredged:

    • 5,317 cy
  • Placement Site:

    • Cent. Bridge RM 482.0 L
  • Dredging Depth: 11’

  • Beneficial Use: Yes

  • Water Quality Monitoring: Per ILDNR





Amount Dredged

  • Amount Dredged

  • 48,400 yards

  • Placement Site

  • Bankline stabilization, RM. 136.5-137.1

  • Dredging Depth 11’

  • Water Quality Monitoring Per ILDNR



Amount Dredged

  • Amount Dredged

  • 25,000

  • Placement Site

  • Beneficial Use, RM. 87

  • Dredging Depth 11’

  • Water Quality Monitoring Per ILDNR



Marseilles

  • Marseilles

  • Dresden Lower, RM. 271, 8,700 yds.

  • Grist Island, RM. 259, 15,000 yds.

  • Starved Rock

  • Bull’s Island Upper, RM. 241, 2,300 yds.

  • Peoria Pool

  • Starved Rock Lower, RM. 229, 18,600 yds.

  • Illinois Power, RM. 212, 5,000 yds.

  • Henry, RM. 196, 5,000 yds.

  • Senachwine Creek, RM. 181, 5,000 yds.



Download 467 b.