Hydro Power 102
Three Regional Models Hydro Simulator Program (HYDROSIM) - Bonneville Power Administration
Hydro System Seasonal Regulation (HYSSR) PNCA Seasonal Regulation (HYDREG)
Common Elements Simulate the hydroelectric operation over 14 periods per year (split April and August) Share hydroelectric project data Share historical stream flow/irrigation data Share flood control data
HYDROSIM - BPA Columbia River Treaty (Coordination with the Canadian Operation) White Book (NW Loads and Resources) EIS (Environmental Impact Statement) Biological Opinion (Endangered Species) Long-term planning
HYSSR - Corps Columbia River Treaty (Coordination with the Canadian Operation) Flood Control Development EIS (Environmental Impact Statement) Biological Opinion (Endangered Species)
HYDREG - PNCA Power Pool Operating Program Critical Period Evaluation FELCC (Firm Energy Load Carrying Capability) Headwater Benefits Each Party’s Rights and Obligations
Modeling the Hydroelectric System
Tapping the Power of the River A Few Definitions Potential Energy = stored energy proportional to the height above ground Kinetic Energy = energy of motion
Tapping the Power of the River A ball resting at the top of an incline has no motion and thus no kinetic energy. With a little push, the ball rolls down the incline, picking up speed as it rolls. At the bottom, the ball has its highest speed but can fall no further. This is an example of converting potential energy to kinetic energy.
Tapping the Power of the River Water in the forebay is passed through a turbine. As the water falls, it forces the turbine blades to turn. As the turbine rotates, it converts the mechanical energy of rotation into electricity. Thus, we can capture some of the water’s potential energy.
Tapping the Power of the River Power = Flow x Head x Constant - Power is measured in megawatts (million watts)
- Flow is measured in cubic feet per second
- Head is measured in feet
- Constant is a function of the turbine’s efficiency
Example at Grand Coulee Dam - Flow is 100,000 cubic feet per second
- Head is 328 feet
- Constant is .075
- Power = 100,000 x 328 x .075 = 2,460 megawatts
A Simple Example One River, One Dam No Storage, No Constraints
A Simple Example One River, One Dam No Storage, No Constraints
Developing a Plan for Our Simple System What is the range of generation? What is the average generation? How much generation can we guarantee (year after year)? What can we do to increase the amount of guaranteed generation?
Statistics for Our System Minimum Runoff Volume 20 Maf - Minimum Generation 2,000 aMW
Maximum Runoff Volume 100 Maf - Maximum Generation 10,000 aMW
Average Runoff Volume 60 Maf - Average Generation 6,000 aMW
Guaranteed Energy 2,000 aMW
Improving Our Simple System by adding 20 Maf of Storage What is the range of generation? What is the average generation? How much generation can we guarantee (year after year)?
Our Modified System When storage is full: - minimum generation 4,000 aMW
- average generation 8,000
- maximum generation 12,000
When storage is half full: - minimum generation 3,000 aMW
- average generation 7,000
- maximum generation 11,000
Guaranteed generation depends on how much water is in the reservoir Guaranteed Generation: Condition 1 (full) 4,000 aMW Condition 2 (half full) 3,000 aMW Condition 3 (empty) 2,000 aMW
Improving Our System by Taking Some Chances
Guaranteed Generation can be Increased if Contingency Actions are in Place 95 % of the time the runoff volume is at least 30 Maf Contract with a customer to drop load in case of low water in return for better price This action effectively increases the guaranteed generation by 1,000 aMW
Generation from Flow
Shape of Demand
Critical Period Planning Required by the Pacific NW Coordination Agreement Portion of the historical water record that produces the least amount of energy (namely the driest conditions) Reservoirs are drafted from full to empty Stored water is used to maximize the generation while matching the monthly shape of demand Results in the Firm Energy Load Carrying Capability (FELCC)
Guaranteed Generation No Storage
Guaranteed Generation With Storage
Shape of Electricity Prices Compared to the Shape of NW Demand
Rule Curves Rule curves are simply elevations at each reservoir that help guide the operation (i.e. drafting or filling) Rule curves specify the highest and the lowest elevation that a reservoir should be operated to in order to stay within the planning objective Intermediate rule curves help determine which projects release water first when energy is needed
Rule Curves Flood Control - defines the drawdown required to assure adequate space to store the anticipated runoff without causing downstream flooding (Maximum Elevation).
Critical Rule Curve - defines how deep a reservoir can be drafted in order to meet the firm energy requirements during the poorest water conditions on record (Minimum Elevation).
Rule Curves Assured Refill Curve - represents the elevation from which the reservoir could refill given the water conditions that occurred in 1931.
Variable Refill Curve (Energy Content Curve) - represents the elevation from which the reservoir could refill given current water conditions.
Rule Curves Actual Energy Regulation (AER) - defines how deep a reservoir can be drafted in order to meet the firm energy requirements during the current water conditions.
Proportional Draft Point (PDP)
Rule Curves
Value of Water in Storage
How the Model Works
General Methodology Starting with the most upstream reservoir, draft (or fill) each dam to its Variable Refill Curve Calculate total generation If generation equals desired amount, we’re done If generation is less than desired, proportionally draft If generation is greater than desired, proportionally fill
Calculating the Desired Amount of Hydro Energy Start with NW firm demand Subtract (or add) firm contracts (i.e. exports and imports) Subtract the expected thermal operation Yields a residual demand that must be served by the hydro system
Non-Power Constraints Physical limits (i.e. top & bottom of dam) Maximum flow due to channel restriction Maximum elevation for flood control Maximum flow due to rate of draft limit Operational minimum & maximum flow rate Operational minimum elevation Water budget flow target Spill level
GENESYS Northwest A PC based program, incorporating the HYDROSIM algorithms Performs stochastic (probabilistic) studies Dynamically simulates the interaction of hydro, thermal and out-of-region resources Identifies potential reliability shortfalls, both long-term (energy deficiencies) and short-term (peaking or capacity problems) Assesses changes in the physical operation of the hydro system
Do'stlaringiz bilan baham: |