Ilm-fan muammolari yosh tadqiqotchilar talqinida


“Ilm-fan muammolari yosh tadqiqotchilar talqinida”


Download 4.85 Mb.
Pdf ko'rish
bet6/197
Sana01.11.2023
Hajmi4.85 Mb.
#1737057
1   2   3   4   5   6   7   8   9   ...   197
Bog'liq
“Ilm fan muammolari yosh tadqiqotchilar talqinida” mavzusidagi 9

“Ilm-fan muammolari yosh tadqiqotchilar talqinida” 
mavzusidagi 9-sonli respublika ilmiy konferensiyasi
 

terminals are not removed. In order to better equalize the stresses remaining in the 
rails after the rails have been hung out on rollers or mounted on sliding pairs, the rails 
are additionally shaken with a percussion device. In the course of work, the actual 
temperature of the rails along their length is measured and the full change in the 
length of the braid at the ends is monitored, as well as the uniformity of stress 
distribution along the length of the braid - by shifting the marks on the bottom of the 
rail over the "beacon" sleepers. When hanging strings on rollers regardless of the 
design of fasteners and when installing paired plates at all fasteners, except KB, work 
on the discharge of thermal stresses should be carried out in the "window" with the 
fencing of the place of work with stop signals in the following sequence. [2] 
One or two days before the "window" calculate the amount of change the 
expected air temperature on the day of the "window" and prepare the corresponding 
shortened (or lengthened) equalizing rails. Then the method and technology of the 
works are chosen depending on the length of the rail-track, the duration of the 
"window" for the works and the manpower. The method of one-sided unloading of 
strings is usually is usually used when the length of ties is less than 500-600 m and 
the calculated elongation is up to 180-200 mm. On the day of the "window" on 
"beacon" sleepers every 50 m apply temporary risks to monitor the uniformity of 
discharge stresses along the length of the string; joints replaceable equalizing rails 
remove the fifth and sixth joint bolts and put on the remaining bolts additional 
washers. [2]. 
Literature: 
1. 
Л.В. Киселева, С.В. Васильев, Т.В. Гаранина. Климатология и 
метеорология на железнодорожном транспорте: Учебник для вузов. - М.: УМК 
МПС России, 2002. - 189 с. ISBN 5-89035-057-9 
2. Крейнис З.Л. Пособие монтеру пути. Профессиональная подготовка 
монтеров пути 2-6-го разрядов. 2-е изд. - М.: ООО «Издательский дом 
«Автограф»; Издательство «Маршрут», 2017. - 685 с. ISBN 978-5-906088-39-0 



Download 4.85 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   197




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling