43 MWp Photovoltaic Power Plant

AES Solar was established in 2008 as a joint venture between the 

AES Corporation and Riverstone Holding LLC. It is a global company 

that develops, finances, constructs and manages utility-scale solar 

photovoltaic power plants across the world. The company seeks to be a 

leading developer, owner and operator of utility-scale solar power plants 

that will be connected to the power grid, in order to supply homes and 

businesses with clean, renewable energy.

Its Italian subsidiary AES Sole has started the construction of a large-

scale park in Pouilles in Italy. With an output of 38,5 MW, the park consists 

of 3 sites, 573,100 solar panels spread over 100 hectares of land. This 

park will have a power generation capacity equivalent to the consumption 

of 18,000 homes, i.e. 50,000 inhabitants (based on 3,300 kWh per year). 

A park of this type represents an annual saving of 28,000 tonnes of CO2.

In order to gain a quick return on its investment, AES Sole wanted to 

optimise the construction time (9 months), and has called upon a reliable 

and competitive player that can offer attractive technical solutions and a 

suitable operating and maintenance contract.

Electrical Energy - Photovoltaic

PROJECT AT A GLANCE 

Cellino San Marco Photovoltaic Power Plant

Situation

Cellino San Marco - Puglia - Italy

Customer:

 AES Sole

Application

Turnkey solution for Photovoltaic Power 

Plant

Equipment installed



EPC contract (Engineering, Procurement & 

Construction) 

PV panels procured by customer 

CUSTOMER BENEFITS

 A single coordinator for the entire project



• 

A single contract for both the design phase and 

for the electrical and video-surveillance package

 Minimum downtime in the event of a fault, 



owing to the monitoring system that allows 

energy production to be controlled remotely

• 

Schneider Electric’s commitment to overall 



power plant performance and installation 

availability 

 Production secured with the operating and 



maintenance contract (2 years)

 An EPC partner which also manufactures the 



equipment used

©

 2

00



S

ch



ne

id

er



 E

le

ct



ric

. A


ll 

rig


ht

re



se

rv

ed



.

02/2011 


Electrical network:

@

 36 transformation station of 1 100 KVA, 



equipped with: 

> 71 Xantrex GT540E-IT inverters 

> 35 X 1 100 low loss transformer 

> 1 X 550 low loss transformer 

> 40 SM6-36 switchboards 

@

 4 grid connection stations of 30 kV



@

 426 array boxes

@

 1,300 km of solar cables



Monitoring system:

@

 Supervision and control of equipment



@

 Support for maintenance and exploitation 

activities 

@

 Evaluation of availability



@

 Weather monitoring

@

 Increased reliability 



@

 Centralisation of information

@

 Creation of graphics and reports



@

 Data storage

@

 Management of remote and multiple access



The security system:

@

 An infrared intrusion detection system



@

 A video-surveillance (access control, 

cameras, lighting) 

@

 A monitoring station



Electrical Energy - Photovoltaic

Schneider Electric 

  Projects & Engineering Center F-38050 Grenoble Cedex France  Telephone: 00 (33) (4) 76 57 60 60               www.schneider-electric.com



Solution: 

A turnkey contract, including: 

Design and installation of structures, panels and the electrical network between the solar modules 



and the network, including Xantrex inverters 

Civil engineering, construction and wiring (30 kms of trenches, 8.5 km of fencing)



@

 Overall project control and coordination of partners and sub-contractors

@

 On-site commissioning



Securing of the site

@

 2-year operating and maintenance contract, renewable. It includes preventive and curative 



maintenance operations with a commitment to performance ratio and availability

OTHER REFERENCES

@

 Ground-based arrays



- Spain - Almería (7,76 MW) 

- Germany - Rote Jahne (6 MW) 

- France - Vinon Sur Verdon (4,2 MW) 

- France - Les Mées 1 - La Mouisse (12 MW) 

- France - Le Gabardan (20 MW) 

- France - St Clar (8,9 MW) 

- France - Les Mées 2 (12 MW)

@

 Buildings



- Spain - Saragossa (10 MW)  

- Spain - Villacañas - Toledo (2,5 MW) 

- Spain - Molina De Segura - Murcia (300 KW) 

- Reunion & Mayotte Islands - 7 Casino stores (16 MW)



Download 22.34 Kb.

Do'stlaringiz bilan baham:




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling