Master thesis towards a Reference Architecture for bim building


Download 2.02 Mb.
Pdf ko'rish
bet18/34
Sana12.10.2023
Hajmi2.02 Mb.
#1699894
1   ...   14   15   16   17   18   19   20   21   ...   34
Bog'liq
THESIS interation in the construction industry

Name 
Publisher 
Category 
Proprietary/Open Source 
AutoCAD 
Autodesk 
Design 
Proprietary 
Sketchup 
Trimble 
Design 
Proprietary 
BricsCAD 
Bricsys 
Design 
Proprietary 
Vectorworks 
Fundamentals 
Vectorworks 
Design 
Proprietary 
Tekla Structures 
Tekla 
Design + BIM 
Proprietary 
Revit 
Autodesk 
Design + BIM 
Proprietary 
ARCHICAD 
Graphisoft 
Design + BIM 
Proprietary 
DDS-CAD 
Data Design System 
AS 
Design + BIM 
Proprietary 
AECOsim Building 
Designer 
Bentley 
Design + BIM 
Proprietary 
BricsCAD BIM 
Bricsys 
Design + BIM 
Proprietary 
Vectorworks Architect 
Vectorworks 
Design + BIM 
Proprietary 
Tekla BIMSight 
Tekla 
Analysis/collaboration Proprietary 
BIMServer 
Supported by 
TNO/TUE 
Collaboration/data 
management 
Open Source 
Trimble Connect 
Trimble 
Collaboration/data 
management 
Proprietary 
AutoDesk 360 
Autodesk 
Collaboration/data 
management 
Proprietary 
BIMSync 
Catenda 
Collaboration/data 
management 
Proprietary 
BIM+ 
AllPlan 
Collaboration/data 
management 
Proprietary 
EDMmodelServer 
Jotne EPM 
Technology AS 
Collaboration/data 
management 
Proprietary 
IFCHub 
IFChub 
Collaboration/data 
management 
Proprietary 
 
Table 3. A selection of existing BIM tooling 


22 
4.2 Requirements 
In order to conceptualize our Reference Architecture for BIM integration, several requirements were 
established. These will be listed and discussed here. 
R0. 
The system must allow for other applications to extract object information from a BIM 
model. 
This is the basic premise of the architecture. For a move towards BIM models as centralized data 
source throughout the construction process, other applications must be able to access the object 
information stored within the model in order to use them for their regular workflows. 
R1
The system must allow for other applications to modify object information in the 
corresponding BIM model. 
Much like R0, This is the basic premise of the architecture. Other applications must be able to enrich 
model object data with their own, process specific data. This keeps the central BIM model up to date
and allows for more dynamic BIM usage. 
R2. 
The system must use a centralized repository for the BIM models, making the model the 
leading document throughout the construction process. 
This requirement is based on expert interviews. Their BIM vision was to have BIM models as a central 
data source, with business processes having existing data sources in use. These existing data sources 
can then be used to enrich BIM model data, or simply be used in parallel, with objects information 
linked to BIM objects. This way, not everything has to be stored in the model itself, but every 
information used is retraceable to a BIM model object. 
Figure 10. Requirement 2, based on the Shared Data Model 
 
 
 
 


23 
R3. 
The system must allow for seamless integration with the traditional applications used by 

Download 2.02 Mb.

Do'stlaringiz bilan baham:
1   ...   14   15   16   17   18   19   20   21   ...   34




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling