As the initial data we take the values given in table 1.1. 
Table 1.1. 
Var 
For central area 
For peripheral zone 
R
1
, km 
N
1

people 
Y
1
, Erl 
R
2
, km 
N
2

people 
Y
2
, Erl 

6,5 
21000 
0,016 
25 
60000 
0,011 


20000 
0,02 
25 
70000 
0.015 


18000 
0.015 
18 
45000 
0.015 


21000 
0.018 
24 
50000 
0.009 


30000 
0.025 
28 
60000 
0.019 


20000 
0.018 
25 
70000 
0.015 

6,5 
21000 
0,016 
28 
60000 
0.019 


21000 
0.018 
25 
70000 
0.015 

5.8 
20000 
0.017 
20 
40000 
0.008 



10 

15000 
0.013 
25 
50000 
0.018 
Calculation: 
 
1.1 Calculate the area of the central zone S
1
: 
2
2
2
1
1
665
.
132
5
,
6
14
,
3
кm
R
S
=

=

=

and peripheral area S
2

2
2
2
2
1
2
2
835
.
1829
)
5
,
6
25
(
14
,
3
)
(
кm
R
R
S
=


=


=

1.2 Determine the total load in each zone
.
336
21000
016
,
0
1
1
1
Erl
N
Y
Y
=

=

=

.
660
60000
011
,
0
2
2
2
Erl
N
Y
Y
=

=

=

1.3 Choosing radius cells R1 and R2 for each zone, find square cells: 
.
4
,
10
2
3
2
3
3
2
3
2
2
2
1
1
km
R
S
соты
cells
=


=


=
.
4
.
23
3
3
2
3
3
2
3
2
2
2
2
2
km
R
S
соты
cells
=


=


=
1.4 Determine the number of cells in each zone, taking into account the 
overlap of cells within 20 – 30% 
cell
S
S
N
cells
cell
16
2
,
1
*
4
,
10
665
.
132
2
,
1
1
1
1
=
=

=
cells
S
S
N
cells
cell
94
2
,
1
*
4
.
23
835
.
1829
2
,
1
2
2
2
=
=

=
1.5 Determine the total load in the cell Y
сells 1
и Y
сells 2

Erl
N
Y
Y
сell
сells
21
16
336
1
1
1
=
=
=

.
02
,
7
94
660
2
2
2
Erl
N
Y
Y
сell
сells
=
=
=

1.6 Determine the load in the sector Y
сект 1 
и Y
сект 2

.
7
3
3
21
1
1
Erl
Y
Y
сells
sekt
=
=
=
.
34
,
2
3
3
02
,
7
2
2
Erl
Y
Y
сells
sekt
=
=
=
1.7 Number of information channels: 



when determining the number of information channels in the sector, we will 
put an excess of the design load by 20%.
Erl
Y
sekt
4
,
8
2
,
1
*
7
2
,
1
*
1
=
=
Erl
Y
sekt
808
,
2
2
,
1
*
34
,
2
2
,
1
*
=
=
According to the Erlang table, taking into account 5% call blocking, we 
find the required number of TCH traffic channels in the sector for each zone: 
N
inf.chan.sekt1
= 13 channels',

inf.chan.sekt2
= 6 channels'.
1.8 Determine the total number of channels: knowing the number of traffic 
channels TSN, table 2 find the required number of control channels SSN.
Table 1.2. Ratio between TSN and SSN.
ССН 
ТСН 

≤15 

≤22 

≤29 
Next, find the total number of channels in the sector: 
N
overall sector 1
= ТСН +ССН = 13+1 = 14 channels,
N
overall sector 2
= ТСН+ССН = 6+1 = 7 channels.
1.9 Find the number of frequency channels in the sector: 
channels
N
N
2
8
/
14
8
/
1
sector 
overall
1
sektor 
FCh 
=
=
=
channel
N
N
1
8
/
7
8
/
sector.2
overall
1
sektor 
FCh 
=
=
=
If the efficiency of frequency channels is low, it is necessary to find a radius 
of the cell, in which the efficiency of frequency channels was in the range of 70-
100%. In our task, the efficiency was 87.5% for the Central zone and 87.5% for 
the peripheral zone. 
1.10 Total number of frequency channels in the system: 
(if there are 3 cells in the cluster) 
channels
N
N
18
3
3
1
FCHsector 
1
FCH
=


=

channels
N
N
9
3
3
2
FCHsector 
2
FCh 
=


=

If the maximum value of the two numbers is greater than 27-the maximum 
number of frequency channels, then you need to reduce the radius of the cell.



Next, you need to assign frequency channel numbers, i.e. assign frequency 
ratings, frequency channels in each sector. The assignment should be performed 
in such a way that the frequency channel numbers of neighboring clusters differ 
by 2 or more. 
Fig.1.1. Frequency channel assignment. 
2. The calculation of equipment 
For Fig. 1.1. the generalized scheme of GSM network construction is 
shown. The entire network can be logically divided into several parts: base 
station subsystem (BSS), switching subsystem (NSS), TE and TO subsystem 
(MLA). In addition, a separate subsystem can be allocated packet transmission 
network GPRS.
Fig. 1.2. Generalized scheme of GSM network construction. 












Let's take a closer look at the subsystem of base stations. The base station 
subsystem (BSS) consists of: 
- base transceiver stations (BTS) of various types and configurations
- base station controller (BSC). 
Functionally, the BSS also includes the TC transcoder module (often 
installed on the MSC side), which is located between the BSC and MSC and 
performs the functions of encoding/decoding information, as well as 
multiplexing/demultiplexing according to the 4:1 scheme. 
The Abis interface between the BS and the controller is internal (each GSM 
equipment manufacturer implements it in its own way), so when installing base 
stations, it is also necessary to use the controller of the same manufacturer. 
Connection of NSS and BSS equipment from different vendors is possible via 
an open a-interface (between MSC and BSC). 
The base transceiver station (BTS) performs the conversion of radio signals 
into wired network signals, wireless demultiplexing and multiplexing, radio 
channel coding, and frequency hopping and handover functions. Huawei offers 
several types of base stations M900/M1800, which are designed for a different 
number of transceiver modules (Transceiver Unit, TRU or TRX) and have 
different designs. All types of base stations allow to combine 900 and 1800 MHz 
transceiver modules. Currently for sales in Russia certified base station internal 
execution type BTS312 (12 TRU) and BTS30 (6 TRU). 
The M900/M1800 base station consists of three parts (Fig. 1.3): main unit, 
transceiver unit (TRU) and antenna-feeder system. 
The main unit consists of: 
• block sync/transfer and management (TMU), 
• block allocation synchronization (TDU),
• additional transmission unit (TEU),
• power supply additional transmission unit (TES),
• unit monitoring operation of the fan (FMU), 
• power supply unit (PSU),
• unit monitoring power supply and environmental (PMU),
• of PDU (SWITCH BOX),
• fan unit (FAN BOX),
• air intake (AIR BOX). 
The transceiver unit, as the name suggests, includes several TRU modules. 
Within one BTS it is possible to mix TRU operating in the range of 900 and 1800 
MHz. 


10 
However, it should be noted that in this case, a separate combine harvester 
module (CDU) must be provided for each TRU. 
Antenna-feeder system consists of:
• antennae,
• block combiner (Combiner and Divider Unit CDU),
• block mast amplifier (Tower Amplification unit, THE), 
• cable system with low power consumption (low consumption 
transmission cables). Its main functions are the transmission and reception of 
radio signals, as well as the issuance of an alarm. 
Fig. 1.3. Block diagram of BTS equipment. 
The BTS base station controller performs radio resource management 
(RR), BTS base station management, power management, and radio channel 
traffic statistics. The equipment of the controller of base stations Of 
M900/M1800 system is created on the basis of digital switching system S&S08 
and also, as well as switching system, has modular structure. 
The hardware of the M900/M1800 BSC consists of administrative 
communicators. module (AM / CM), base module (VM) and Central database 
(CDB).
If the capacity M900/М1800 BSC does not exceed 128TRU, you only 
need one VM module and needs module AM/CM in this case. If the capacity of 
the BSC exceeds 128TRU required module AM/CM, and the number of VMS 
depends on the capacity (maximum possible to configure VM 8) (number of 
TRU / 128). 
At the first stage of equipment calculation it is necessary to choose BTS 
type. The selection is based on the number of frequency channels used in the 


11 
cell. For our example, we choose BTS30 6TRX, which is designed for 6 
frequency channels, because the cells of both zones use three frequency 
channels.
The number of TRX modules in BTS is equal to the number of frequency 
channels in the cell, i.e. equal to 9.
The number of CDU modules is equal to the number of sectors in the cell, 
i.e. it is also equal to 3.
Number of E1 is determined from the ratio 1TRX – 2 channel interval, so 
we only 1 stream E1 and, respectively, one module TMU. 
To calculate the BSC equipment you need to find the total number of 
TRX modules:
378
1
*
3
*
94
2
*
3
*
16
*
3
*
*
3
*
2
2
1
1
=
+
=
+
=

ЧКСЕКТ
СОТ
ЧКСЕКТ
СОТ
N
N
N
N
TRX
3
128
/
378
128
/
=
=
=


TRX
BM
Table 1.3. Composition of BTS equipment. 
Central zone
Peripheral zone 
Type BTS 
BTS312 
BTS30 
The number of BTS 
16 
94 
Number of TRX modules in 
BTS 


Number of TRX modules 
96 
282 
Number of CDU modules in 
BTS 


Number of CDU modules 
48 
282 
Number of TMU modules in 
BTS 


Number of TMU modules 
16 
94 
Table 4. The equipment M900/М1800 BSC. 
Central database (CDB) 

Am/CM module 

Module VM 

Conclusion: after making calculations for the projected mobile radio 
network GSM-900 received: 
- 16 cells in the Central zone, 94 cells in the peripheral zone; 
- the number of frequency channels in the cell of the Central zone 6, 
peripheral zone 3; 
- the number of TRX in the projected network is 378. 

Download 6.03 Mb.

Do'stlaringiz bilan baham:
1   2   3   4   5   6   7   8   9   ...   52




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling