Power-Plant-Engineering
Table 11.2
Month Mean monthly Accumulative Month Mean monthly Accumulative flow flow second flow flow second second-metre metre-month second-metre metre-month April 7710 7710 October 3300 23280 May 3850 11560 November 2330 25610 June 860 12420 December 3880 29490 July 1040 13460 January 5200 34690 August 2500 15960 February 6000 40690 September 4020 19980 March 12,100 52790 Let the flow demand be, 3000 sec-meter. Then the line X-Y may be called as `demand line' or ‘Use line’. If during a particular period, the slope of the mass Curve is greater than that of the demand line, it means more water is flowing into the reservoir than is being utilized, so the level of water in the reservoir will be increasing during that period and vice versa. Upto point X and beyond point Y the reservoir will be overflowing. being full at both X and Y. The capacity of the reservoir is given by the maximum ordinate between the mass curve and the demand line. For the portion of mass curve between point X and Y, the storage capacity is about 4600 348 POWER PLANT ENGINEERING sec-meter-month. However, considering the entire mass curve, storage capacity will be about 15,400 sec-meter-months. Note: The amount of water to be stored in a reservoir can also be determined with the help of hydrograph. A horizontal line giving the average flow demand is drawn. The portion of the curve above this line will indicate the amount of water that should be stored in the reservoir to be used during lean months. But, hydrograph for one year varies from year to year, the storage capacity should be determined with the help of the mass curve. 56,000 48,000 40,000 32,000 24,000 16,000 8,000 A M J J A S O N D J F M F lo w , S ec ond -m et re .m ont h Time, Months S tor age Mass Curve X Y Download 3.45 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling