Project Management in the Oil and Gas Industry
Download 1.92 Mb. Pdf ko'rish
|
2.Project management in the oil and gas industry 2016
Table 7.5 Owner requirements.
Accessibility Access and use by children, aged, and disabled persons Acoustics Control of internal and external noise and intelligibility of sound Comfort Identify and document those comfort problems that have caused complaints in the past and which will be avoided in this facility (i.e., glare, uneven air distribution, etc.) Communications Capacity to provide inter- and intra-telecommunications throughout the facility Constructability Transportation Constructability Transportation to site, erection of facility, and health and safety during construction Design Excellence Potential/Objectives for design recognition Durability Retention of performance over required service life Energy Goals for energy efficiency (to the extent they are not called out in the Green Building Concepts) Fire Protection and Life Safety Fire protection and life safety systems Flexibility For future facility changes and expansions Green Building Concepts Sustainability concepts including LEED certification goals Health & Hygiene Protection from contamination from waste water, garbage and other wastes, emissions and toxic materials Indoor Environment Including hydrothermal, air temperature, humidity, condensation, indoor air quality and weather resistance Life Safety Fire protection and life safety systems Light Including natural and artificial (i.e., electric, solar, etc.) illumination Maintenance Requirements Varied level of knowledge of maintenance staff and the expected complexity of the proposed systems Security Protection against intrusion (physical, thermal, sound, etc.) and vandalism and chemical/biological/ radiological threats Standards Integration Integration of approved federal, state, and local as well as GSA and customer Agency standards and requirements Structural Safety Resistance to static and dynamic forces, impact and progressive collapse 260 Project Management in the Oil and Gas Industry Table 7.6 Commissioning plan. Purpose and general summary of the Plan Introduction Overview of the project, emphasizing key project information and delivery method characteristics General Project Information The commissioning scope including which building assemblies, systems, subsystems and equipment will be commissioned on this project Commissioning Scope Project specific commissioning team members and contact information Team Contacts Documentation of the communication channels to be used throughout the project Communication Plan and Protocols Detailed description of the project specific tasks to be accomplished during the Planning, Design, Construction and Tenant Occupancy Stages with associated roles and responsibilities Commissioning Process List of commissioning documents required to identify expectations, track conditions and decisions, and validate/certify performance Commissioning Documentation Specific sequences of events and relative timeframes, dates and durations Commissioning Schedule Download 1.92 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling