Project Management Terms Accept


Work authorization system


Download 63.25 Kb.
bet127/127
Sana05.01.2022
Hajmi63.25 Kb.
#213397
1   ...   119   120   121   122   123   124   125   126   127
Bog'liq
project menejment

Work authorization system - A formal procedure to ensure that project work is performed on time and in logical order.

Work breakdown structure (WBS) - A Work breakdown structure is a comprehensive, hierarchical model of the deliverables constituting the scope of a project. It details everything a project team is supposed to deliver and achieve. A work breakdown structure categorizes all project elements, or work packages, into a set of groups and may be used to form cost estimates.

Work breakdown structure dictionary - A document that details, describes, and provides scheduling information for every element of a work breakdown structure. It may be thought of as a dictionary-cum-schedule of work packages.

Work package - The work packages of a project are its lowest-level deliverables. They are detailed in a work breakdown structure dictionary.

Work stream - In project management, a work stream is a logically arranged series of activities that must be completed to pursue project objectives. The term typically refers to the full sequence of work activities from project initiation to project closure.

Workaround - A way to circumvent a problem which does not have a permanent solution or for which no adequate response was planned.

X-Bar control charts - An x-bar control chart includes two separate charts that display the means and sample ranges for a number of periodically gathered, same-size samples. The sampled data constitute some characteristic of a product or a process.


Download 63.25 Kb.

Do'stlaringiz bilan baham:
1   ...   119   120   121   122   123   124   125   126   127




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling