38
transmission system, particularly with a view of provision of
system related services and
restoration of the transmission system after the blackout.
4.3.2.
TRANSMISSION
GRID
CONNECTION
4.3.2.1. In its facilities where the lines start and go to the generation facility, JSC EMS shall
place a supply scheme that includes the high-voltage fields in these facilities (block-
transformer, self-consumption transformer and other relevant elements), which are of the
interest for transmission grid operation.
4.3.2.2. If the line for auxiliary supply of the power plant from the transmission grid has been
provided, that it can be used as the alternative connection for delivery of generated electricity.