Serbian Grid Code-1-43
1.3.
FORCE MAJEURE 1.3.1. JSC EMS shall be authorised to take measures in the event of force majeure during the application of the Code regardless of the JSC EMS will, i.e. the circumstances the occurrence of which could not be prevented, whereby the effects of these circumstances may result in altered technical requirements for the transmission system use and may cause damage to the transmission system users. 1.3.2. Measures referred to in Section 1.3.1. JSC EMS shall take the above measures in agreement with the transmission system users affected by revised technical requirements for use of the system. Immediately upon determining the possible methods to eliminate the consequences of force majeure, JSC EMS shall be obliged to notify the affected transmission system users and to suggest measures that can be taken and deadline in which said measures should be taken. 1.3.3. If JSC EMS and the user cannot reach an agreement on measures to be taken within the given time interval, JSC EMS shall decide on implementing the measures for the prevention or elimination of consequences of force majeure. JSC EMS is required to implement such measures that reduce the consequences for the users of the system to a minimum. 1.3.4. The transmission system user is required to abide by all the instructions issued by JSC EMS in order to implement appropriate measures in the course of force majeure. 1.3.5. JSC EMS is required to prepare a report on the implementation of measures in the event of force majeure, following the procedure for drafting special reports on the transmission system operation, which provides, inter alia, the causes of the occurrence of force majeure, the measures taken and consequences of force majeure. In accordance with the Code, the report shall be submitted, among other competent bodies, to the Commission for monitoring the implementation of the Grid Code. 1.3.6. No later than 45 days from the date of occurrence of force majeure, JSC EMS shall prepare and submit for review and compliance an initiative for amending the Code, for the purpose of regulating this issue. Download 0.65 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling