CHAPTER 9: TRANSITIONAL AND FINAL PROVISIONS
 ........................................................... 101 
9.1. ANNEXES .............................................................................. Error! Bookmark not defined. 
9.2. AMENDMENTS TO THE CODE .......................................... Error! Bookmark not defined. 
9.3. OTHER TRANSITIONAL PROVISIONS ............................. Error! Bookmark not defined. 
9.4. FINAL PROVISIONS ............................................................. Error! Bookmark not defined. 
ANNEX A: STANDARD DATA ........................................................................................................ 102 
ANNEX B: THE CONCEPT OF DISPATCH CENTRE'S 
INTERCONNECTION…………………....................................................................................110 



 
 
CHAPTER 1: GENERAL PROVISIONS 
1.1.
SUBJECT
 
MATTER
 
OF
 
THE
 
GRID
 
CODE
 
1.1.1. Rules set by the Grid Code (hereinafter referred to as the Code) regulate: 
1) planning the development of the transmission system (development plan table of 
contents, planning method) and investment plan table of contents;
2) conditions for secure and reliable operation of transmission system
3) technical requirements for connection and inter-connection to transmission 
system; 
4) obligations of transmission system user required for secure and reliable operation 
of transmission system; 
5) obligations of system user and transmission system operator in function testing
6) contents of the Agreement on Use of facilities; 
7) use and maintenance of facilities
8) parameters and method of electricity quality control;
9) planning of the transmission system operation
10) procedure for registration and confirmation of schedules of the balance 
responsible parties; 
11) types and scope of auxiliary and ancillary services
12) operative procedures and managing the transmission system under normal 
conditions and in the case of disturbances
13) access to the transmission system, payment security instrument for system access 
payment and criteria for determining amount and period requested;
14) metering procedure and defining metering equipment; 
15) training of operator personnel and transmission system users in the filed of 
operative procedures, with the aim of secure and reliable operation of 
transmission system; 
16) other issues necessary for transmission system operation.