Pursuant to Article 116 of the Energy Law


Capability for black start of the generator


Download 0.65 Mb.
Pdf ko'rish
bet44/44
Sana24.12.2022
Hajmi0.65 Mb.
#1059459
1   ...   36   37   38   39   40   41   42   43   44
Bog'liq
Serbian Grid Code-1-43

4.3.9.4. Capability for black start of the generator 
4.3.9.4.1. Capability of black start of the generator in hydro-power plants must be provided 
upon the request of JSC EMS for the needs of restoration of the electric transmission grid in 
after partial or full blackout. 
4.3.9.4.2. Operation of the generation unit in this mode must be guaranteed for the period of 
at least 15 minutes. 
4.3.9.5. Capability of the island mode of operation of the generator 
4.3.9.5.1. Capability of the island mode of operation of the generator in hydro-power plants 
must be provided upon the request of JSC EMS for the needs of restoration of the 
transmission system in after partial or full black out. 
4.3.9.5.2. Hydro-power plant declared for island mode of operation must be capable of 
synchronizing on to the island of which is above the power of its auxiliary supply and below 

Download 0.65 Mb.

Do'stlaringiz bilan baham:
1   ...   36   37   38   39   40   41   42   43   44




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling