SH 199 Corridor Master Plan

Community Meeting No. 2

May 31, 2017

SH 199 Corridor Master Plan

SH 199 from IH 820 to West Fork of Trinity River

Reconstruct to 4/6 lane divided urban

10-Year Plan Committed Funding: $100 million

SH 199 from 0.3 miles south of FM 1886 to 

south end of Lake Worth bridge

Construct freeway mainlanes and frontage 

roads

10-Year Plan Funding: $29.7 million 



SH 199 from 0.3 miles south of FM 1886 to 

south end of Lake Worth bridge

Construct freeway mainlanes and frontage 

roads

10-Year Plan Funding: $85.3 million 



FM 1220 at Azle Avenue

Intersection improvements



SH 199 from Azle Avenue to IH 820

Construct freeway mainlanes and 

interchange at IH 820

10-Year Plan Funding: $200 million 

Transportation 

Projects On or 

Near SH 199

Total Investment 

$415 Million

North


2

SH 199 Corridor Master Plan

Study Overview

Limits: IH 820 to Belknap

Length: 6 Miles

Scope



Existing Conditions Analysis



Traffic Assessment

Economic Market Analysis



Stakeholder and Public 

Involvement

Corridor Design and Operation



o

Drainage Assessment

o

Urban Design/Streetscape Alternatives



o

Multi-Modal Safety



SH 199 Corridor Master Plan

Study Purpose and Goals

Provide a basis for the future design of the roadway and develop a 

phased approach for making improvements to SH 199 

Goals:



Evaluate alternatives to maintain the flow of traffic through the 



corridor 

Provide transportation options for all modes



Improve drainage

Provide economic development opportunities



SH 199 Corridor Master Plan

What is Great?

• Historical Context of the 

Corridor

• Parks in the Area

• Adjacent Neighborhoods

• Vistas and Views

• Redevelopment Opportunities

What are the Challenges?

• Traffic Volumes

• Drainage

• Topography

• Number and Size of Driveways

• Speed


• Safety

• Pedestrian Access

• Making the Corridor Attractive 

to Businesses

• Adjacency to Park Land and a 

Historic Neighborhood 



What are the Opportunities?

• Right-of-Way Width

• Increase Pedestrian/Bike 

Connectivity to Parks and Trails

• Park and Ride near IH 820

• More Mixed-Use Development

• Enhanced Urban Design

Challenges and Opportunities 



SH 199 Corridor Master Plan

Traffic Data

2016 Average Daily Traffic 

1

30,050 to 35,800 vpd



2040 Projections

2

50,200 to 55,700 vpd



Crash Data (2010-2014)

1,191 vehicle crashes with 9 



fatalities

18 pedestrian related crashes 



with 3 fatalities

3 bicycle related crashes with 0 



fatalities 

VPD = vehicles per day

1

Based on Traffic Counts Taken in April 2016



2

Projected Traffic Volumes Based on NCTCOG Mobility 2040



SH 199 Corridor Master Plan

Proposed 

Improvements

Reconstruct and widen the existing 



roadway

o

6 lanes from IH 820 to University 



Drive/Northside Drive

o

4 lanes from University Drive/ Northside 



Drive to Belknap Street

Convert rural cross section (open 



drainage ditches) to urban (curb 

and gutter with wide sidewalks)



No significant purchases of land 

(right-of-way) are anticipated

Base Concept - 120’ ROW

Base 

Concept


- 150’ ROW

SH 199 Corridor Master Plan

DRAFT

DRAFT

Conceptual Intersection Layouts



SH 199 Corridor Master Plan

Conceptual Intersection Layouts



DRAFT

DRAFT

SH 199 Corridor Master Plan

Potential Effects to Properties Along SH 199

Change to property access 



Change in locations of median openings

Construction impacts - will suggest that TxDOT explore quarterly 



meetings with property owners 

These will be addressed by TxDOT during the preliminary 

engineering and environmental process

SH 199 Corridor Master Plan

Potential Economic

Development 

Nodes


Conducted market assessment 

within trade area

Reviewed projected industry and 



corridor trends

Completed parcel-by-parcel analysis 



by studying zoning, land use, 

topography, land values, land 

assembly, and ownership type

High nodal development potential



1

4

3



2

SH 199 Corridor Master Plan

Urban Design



Base Concept

Parkway Concept

Boulevard Concept

SH 199 Corridor Master Plan

Urban Design



Parkway Concept

Outward Emphasis

Urban Transition

Development Nodes

Boulevard Concept

Inward Emphasis

Optimize Natural 

Features 

SH 199 Corridor Master Plan

Urban Design –

Concept Plan

150’ ROW

Parkway Concept - 150’ ROW



Transition Zone

SH 199 Corridor Master Plan

Urban Design –

Concept Plan

120’ ROW

Transition Zone

Boulevard Concept - 120’ ROW



SH 199 Corridor Master Plan

Stakeholder and Public Involvement 

Stakeholder Steering Committee Meetings 



Stakeholder meetings with staff and elected 

officials

Community Meeting #1 – October 2016



Numerous presentations including:

o

Coffee and Conversation with Mayor Barnett



o

Fort Worth Pedestrian and Bicycle Advisory 

Commission

o

Samsom Park Annual Business Luncheon



o

Fort Worth City Council

o

Tarrant County Commissioners Court



SH 199 Corridor Master Plan

Next Steps

Finalize recommendations and cost estimates



Prepare final report

Work with TxDOT to initiate preliminary engineering and 



environmental process for the project

SH 199 Corridor Master Plan

What Do You Think About..

Roadway Design



Urban Design

Economic Development Opportunities



SH 199 Corridor Master Plan

Study Information and Contact

www.nctcog.org/PlanningProjects

E-mail Comments and/or Questions to: 



transinfo@nctcog.org

SH 199 Corridor Master Plan

Community Meeting No. 2

May 31, 2017

Document Outline

  • Slide Number 1
  • Transportation Projects On or Near SH 199
  • Study Overview
  • Study Purpose and Goals
  • Challenges and Opportunities 
  • Traffic Data
  • Proposed Improvements
  • Conceptual Intersection Layouts
  • Conceptual Intersection Layouts
  • Potential Effects to Properties Along SH 199
  • Potential Economic Development Nodes
  • Urban Design
  • Urban Design
  • Urban Design – Concept Plan
  • Urban Design – Concept Plan
  • Stakeholder and Public Involvement 
  • Next Steps
  • What Do You Think About..
  • Study Information and Contact
  • Slide Number 20