(R) Mato Grosso do Sul State Road Transport (Ln. 78720-BR):

The objectives are: (a) modernize the state fiscal administration, (b)

improve the state capacity to protect biodiversity and manage natural

resources in a sustainable fashion, and (c) increase capacity in the man-

agement of transport public investment programs. Signing scheduled

for 15 June 2010.

Environmental Assessment Category B. Project:

P118410. US$ 300.0 (IBRD). No consultants are required. Agencia Es-

tadual de Gestao de Empreendimentos de Mato Grosso do Sul, Av. De-

sembargador Jose Nunes da Cunha, Bloco 14, Gampo Grande, MS,

Brazil, Tel: (55-67) 3318-5538, Fax: (55-67) 3318-5386, E-mail: coorde-

nacao.pde@agesul.ms.gov.br, Contact: Juliana Pegolo, Project Coor-

dinator


(R) Sao Paulo Metro Line 4-Phase 2 (Ln. 78690-BR): The ob-

jective is to improve the quality of service provided to the urban trans-

port users in the area of influence of the new Line 4 stations and

facilitate the integration between metro and bus at those stations.



Bank Approval completed on 4 May 2010. Signing scheduled for 15

June 2010.

Environmental Assessment Category A. Project: P106390.

US$ 130.0/130.0 (IBRD/JBIC). Consultants will be required to assist

in the preparation of bidding documents and to review detailed engi-

neering designs Companhia do Metropolitano de Sao Paulo, Rua Boa

Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291-

5494, Fax: (55-11) 3291-2890, E-mail: egranado@metrosp.com.br, Con-

tact: Ernesto Granado, Coordinator PMU



(R) Sao Paulo Metro Line 5 (Ln. 78550-BR): The objective is to

improve mobility for public transport users in the Capão Redondo-Largo

Treze-Chácara Klabin corridor in a cost-efficient and environmentally

friendly way. Bank Approval completed on 20 April 2010. Signing sched-



uled for 30 June 2010.

Awaiting Senate approval. Environmental As-

sessment Category A. Project: P116170. US$ 650.4/481.0 (IBRD/IADB).

Consultants will be required for assessment of train and systems spec-

ifications, project management and supervision Companhia do Met-

ropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo,

SP, Brazil, Tel: (55-11) 3291-5494, Fax: (55-11) 3291-2890, E-mail:

egranado@metrosp.com.br, Contact: Ernesto Granado, Coordinator

PMU

(R) Sao Paulo State Feeder Roads Additional Financing: The ob-

jective is to scale up support to the State in improving the efficiency

of the paved municipal road network. Negotiations pending authoriza-

tion by Federal Treasury.

Environmental Assessment Category B. Pro-

ject: P118077. US$ 326.8 (IBRD). Consultants will be required for local

and international consultancy for Project Preparation, notably on high-



PAGE 70

Monthly Operational Summary

JUNE 2010

JUNE 2010

Monthly Operational Summary

PAGE 71

way engineering. Departamento de Estradas de rodagem do Estado

de Sao Paulo (DER/SP), Avenida do Estado 777, 3o Andar, Ponte Pe-

quena, Sao Paulo, SP, Brazil, Tel: (55-11) 3311-1401, Fax: (55-11) 3311-

0973, E-mail: delson@sp.gov.br, Contact: Delson Jose Amador,

Superintendente



(R) Sao Paulo Trains and Signaling Additional Financing: The

objective is to continue to improve the quality of service offered to SPMR

users by acquiring additional 9 trains for Line 11 of the São Paulo sub-

urban railway (CPTM). Negotiations scheduled for 30 June 2010. En-

vironmental Assessment Category B. Project: P117122. US$ 112.9

(IBRD). Consultants will be required for project management and su-

pervision/reception of trains. Companhia Paulista de Trens Metro-

politanos, Rua Boavista, 185-2 Andar BI. A, Centro Sao Paulo, Sao

Paulo, SP, Brazil, Tel: (55-11) 3101-7141, E-mail: eduardo.graziano@cptm.

sp.gov.br, Contact: Eduardo Graziano, Coordinator UGP



(R) Tocantins Integrated Sustainable Regional Development:

The objective is to contribute to stimulate a poised and sustainable eco-

nomic growth of the State of Tocantins by improving accessibility of

the population, territories and productive systems to services, re-

sources and markets, while ensuring sustainable use of natural re-

sources and the protection of fragile ecosystems. Identification scheduled



for 2 June 2010.

Environmental Assessment Category A. US$ 300.0

(IBRD). Consulting services to be determined. Implementing agency(ies)

to be determined.



Water, Sanitation and Flood Protection

(R) Bahia Integrated Health and Water Management SWAp:

The objective is to assist the State of Bahia in the promotion of equi-

table social development through an increase in access to WSS, both

in terms of quantity and quality, and through actions aimed at the re-

duction of maternal and neonatal mortality rates. Decision Meeting

completed on 6 May 2010. Appraisal scheduled for late-May 2010.

En-


vironmental Assessment Categor y B. Project: P095171. US$ 60.0

(IBRD). Consultants will be required. State of Bahia, Av. Luís Viana

Filho 400, 4o Andar, Centro Administrativo, Salvador, BA, Brazil, Tel:

(55-71) 3115-3550, Fax: (55-71) 3371-3237, Contact: Jorge Jose Santos

Pereira Solla, Secretario de Estado de Saude

(R) Brasilia Environmentally Sustainable Additional Financing:

The objective is to reduce regional inequalities and ensure quality of

water resources in the Federal District and Brasilia Metropolitan Re-

gion through environmental planning and management activities,

poverty reduction interventions and environmental rehabilitation in the

most critical river basins. Project is on hold until further notice. Envi-

ronmental Assessment Category A. US$ 57.6 (IBRD). Consulting ser-

vices and implementing agency(ies) to be determined.



(R) Integrated Solid Waste Management and Carbon Finance:

The objective is to scale-up public and private investments in munici-

pal solid waste management treatment and disposal, while ensuring

financial and technical viability and reducing environmental and social

impacts. Negotiations scheduled for 2 June 2010. Environmental As-

sessment Category F. Project: P106702. US$ 50.0 (IBRD). Consultants

will be required during implementation, and to assist public sector in

preparing solid waste and carbon finance projects, including feasibil-

ity studies, environmental assessments, technical and financial analy-

sis, institutionasl framework and propose cost recovery mechanisms.

Caixa Economica Federal, SBS Quadra 4 Lotes 3/4, Ed. Matriz I, 11

Andar-GEAIN, Brasilia, Brazil, Tel: (55-61) 3206-4911, E-mail: gesan@

caixa.gov.br, Contact: Adailton Ferreira Trindade, Gerente Nacional

(R) Sao Paulo Water Recovery REAGUA (Ln. 78700-BR): The

objective is to increase water availability in the critical watersheds of the

State of Sao Paulo. Bank Approval completed on 4 May 2010. Signing

scheduled for 31 August 2010.

Environmental Assessment Category B.

Project: P106703. US$ 64.5 (IBRD). Consultants will be required for

assistance to the State Secretariat of Water and Energy to manage

and verify results during implementation. Secretaria de Estado de

Saneamento e Energia, Rua Bela Cintra 847, 14o Andar, Bairro Con-

solacao, Sao Paulo, SP, Brazil, Tel: (55-11) 3218-5500, E-mail: dilmape-

na@sp.gov.br, Contact: Ms. Dilma Pena, Secretaria



Sergipe Water: The objective is to promote efficient and sustainable

water use in targeted municipalities of the Sergipe river basin, by im-

proving water resources management and regulatory tools, reducing

the pollution load discharged into rivers and increasing water services

productivity. Decision Meeting scheduled for 28 May 2010. Environ-

mental Assessment Category A. Project: P112074. US$ 70.3 (IBRD).

Consultants will required to: (a) prepare environmental and social as-

sessments, economic and financial assessments, development of pro-

ject operation manual, irrigation services assessments, utility corporate

reform and non-revenue water program; and (b) implementation. State

Secretariat of Environment and Water Resources - Sergipe, Av. Prefeito

Heraclito Rollemberg, S/N, Sergipe, Brazil, Tel: (55-79) 3179-7300,

Fax: (55-79) 3179-7302, Contact: Ailton Francisco da Rocha, Project Co-

ordinator



Chile

Energy and Mining

(R) Climate Change and Energy: The objective is to support energy

efficiency, renewable energy and other clean technologies that would

reduce emissions of greenhouse gases. Project Concept Review Meet-

ing scheduled for 20 September 2010. Environmental Assessment Cat-

egory B. US$ 50.0 (IBRD). Consultants will be required. Implementing

agency(ies) to be determined.



Public Administration, Law, and Justice

Social Protection Technical Assistance Additional Financing:

The objectives are to support the efforts of the Government to im-

plement Chile Solidario and lay the foundation of a national system of

social protection. Additional resources are needed to implement ad-

ditional activities to scale up the project’s impact and development ef-

fectiveness. Bank Approval completed on 29 October 2009. Signing

pending clearance from Treasury Department. Environmental As-

sessment Category C. Project: P114774. US$ 3.0 (IBRD). Consultants

will be required. Ministry of Finance, Teatinos 120, Santiago, Chile,

Tel: (56-2) 675-1702/1727, E-mail: xserqueira@mideplan.cl, Contact: Xi-

mena Serqueira, Coordinadora de Implementacion Administrativa del

Water, Sanitation and Flood Protection

(R) Earthquake Early Recovery and Damage Assessment: The

objective is to finance the recovery and damage assessment of Chile

after the February 27, 2010 (8.8 magnitude) earthquake. This project

is on hold until further notice.

Environmental Assessment Category B.

US$ 500.0 (IBRD). No consultants are required. Implementing agen-

cy(ies) to be determined.



Colombia

Agriculture, Fishing, and Forestry

(R) Mainstreaming Sustainable Cattle Ranching: The objective is

to reduce the impacts of cattle ranching on globally significant biodi-

versity and land degradation by making cattle ranching incentives and

programs more land-use sustainable and biodiversity friendly. The



loan was signed on 6 April 2010.

Environmental Assessment Cate-

gory B. Project: P104687. US$ 7.0 (GEFU). Consultants will be re-

quired. Federacion Nacional de Ganaderos, Calle 37 No. 14-35, Bogota,

Colombia, Tel: (57-1) 578-2020 Ext. 259, E-mail: cosorio@fedegan.org.co,

Contact: Carlos Osorio, Director Ciencia y Technologia



(R) National Protected Areas Additional Financing: The objective

is to promote the consolidation and long-term sustainability of Colom-

bia’s National Protected Areas System (NPAS) through designing and

implementing a Protected Areas Conservation Trust Fund. Decision

Meeting scheduled for 9 August 2010. Environmental Assessment

Category B. Project: P112106. US$ 4.0 (GEFU). Consultants will be re-

quired. Patrimonio Natural, Calle 72 No. 10-70, Edificio Centro Avenida

Chile, Torre A, Bogota, Colombia, Tel: (57-1) 211-5545, E-mail:

agalan@patrimonionatural.org.co, Contact: Alberto Galan, Director

Second Agricultural Transition: The objective is to consolidate the

progress made in the establishment of a diversified agricultural inno-

vation system and in the strengthening of Colombia’s sanitary and phy-

tosanitary systems. In addition, it will establish novel ways for technical

assistance to agriculture producers. Project Concept Review Meeting

scheduled for 25 June 2010. Environmental Assessment Category B.

US$ 30.0 (IBRD). Consultants will be required. Ministry of Agriculture,


Av. Jimenez 7-65, Colombia, Tel: (57-1) 341-9005, Fax: (57-1) 284-1775,

E-mail: claudia.uribe@minagricultura.gov.co, Contact: Claudia Uribe,

Coordinadora del PTA

Education

(R) Education System Modernization: The objectives are to sup-

port: (a) the planned institutional transformation of Instituto Colom-

biano para el Fomento de la Educacion Superior (ICFES) from a public

entity to a semi public entity; and (b) technical and institutional capacity

of ICFES to analyze, monitor and report student assessments. Deci-

sion meeting tenatively scheduled for late-May 2010.

Environmental As-

sessment Category C. Project: P106693. US$ 13.2 (IBRD). Consultants

will be required. Instituto Colombiano para el Fomento de la Educa-

cion Superior, Margarita Pe, Director, Colombia, Tel: (57-1) 341-228,

E-mail: mpena@ices.org, Contact: Margarita Pena, Directora



(R) Science, Technology and Innovation: The objective is to include

activities supporting the implementation of the recently approved sec-

tor policy for Science, Technology and Innovation by the Government

of Colombia. Appraisal completed on 23 April 2010. Negotiations sched-



uled for 24 May 2010.

Environmental Assessment Category B. Project:

P117590. US$ 25.0 (IBRD). Consultants will be required. Colombian

Institute for the Development of Science and Technology (COL-

CIENCIAS), Transversal 9 A Bis 132 28, Bogota, Colombia, Tel: (57-

1) 1625 8480, E-mail: jfmiranda@colciencias.gov.co, Contact: Juan

Francisco Miranda, Director General

Early Childhood: The objective is to support the government in im-

proving access to quality early childhood development services. Pro-

ject Concept Review Meeting scheduled for 30 September 2010.

Environmental Assessment Category B. US$ 40.0 (IBRD). Consul-

tants will be required. Implementing agency(ies) to be determined.

Public Administration, Law, and Justice

(R) Sustainable Development Additional Financing: The objec-

tive is to ensure sustained progress through technical assistance and

investment in three of the four thematic areas of the original loan: (i)

environmental health: outdoor air quality and a hand washing campaign,

(ii) integrated water resources management, and (iii) planning and over-

sight of environmental management. Preparation completed on 25



March 2010. Decision Meeting scheduled for 27 September 2010.

Environ-


mental Assessment Category C. US$ 10.0 (IBRD). Consultants will be

required. Ministry of Environment and National Planning Depart-

ment, Calle 37 No. 8-40, Bogota, Colombia, Tel: (57-1) 332-3400, Ext.

1194, Fax: (57-1) 332-3429, E-mail: lnino@minambiente.gov.co, Contact:

Lucy Amparo Nino Carrillo, Coordinadora de Banca Multilateral

Transportation

(R) Integrated Mass Transit System Third Additional Financing:

The objective is to deliver high quality and sustainable BRTS in selected

medium and large cities to improve mobility along the most strategic

mass transit corridors; improve accessibility for the poor through

feeder services and fare integration; and build greater institutional ca-

pacity at the national and local level. Project Concept Review Meeting

scheduled for 28 June 2010. Environmental Assessment Category B.

US$ 600.0 (IBRD).

Consultants will be required. Ministry of Trans-

port, Av. El Dorado CAN, Colombia, Tel: (57-1) 324-0800, E-mail: min-

trans@mintransporte.gov.co, Contact: Carolina Camacho, Coordinadora

Sistemas Integrados de Transporte

Water, Sanitation and Flood Protection

(R) Rio Bogota Environmental Infrastructure: The objective is to

transform the Rio Bogotá from an environmental liability into an ur-

ban set for the metropolitan region by improving water quality, re-

ducing flood risk, and creating a series of multi-functional parks along

the river. Negotiations scheduled for 20 May 2010. Environmental As-

sessment Category A. Project: P111479. US$ 250.0 (IBRD). Consultants

will be required. Corporacion Autonoma Regional de Cundinamarca,

Carrera 7 No. 36-45, Bogota, Colombia Tel/Fax: (57-1) 320-900 Ext. 1400,

E-mail: jplata@car.gov.co, Contact: Garcia Jorge Plata, Project Manager

Barranquilla Flood Management: The objectives are: (a) Flood

Risk Reduction Investments; (b) institutional strengthening of mu-

nicipal government; and (c) resettlement of people in high risk areas,

and compensation for involuntary loss of land. Project Concept Review

Meeting scheduled for 2 November 2010. Environmental Assessment

Category A. US$ 150.0 (IBRD). Consultants will be required. Secre-

tariat of Plannig District of Barranquilla, Calle 34 No. 43-31, Colombia,

Tel: (57-317) 641-7757, E-mail: mabuchaibe@barranquilla.gov.co, Con-

tact: Maria Elia Abuchaibe, Secretary of Planning

National Macroproyectos Social Interest Program: The objec-

tives are: (a) to increase access to affordable land and housing solu-

tions for over 200,000 households; and (b) to develop and pilot

approaches to access capital markets to finance the program as a

means to reduce and ultimately eliminate in the medium-term the

need for public financing of infrastructure. Negotiations scheduled

for 15 June 2010. Environmental Assessment Category B. Project:

P110671. US$ 40.0 (IBRD). Consultants will be required. Ministry of

Environment, Housing, and Territorial Development, Calle 37 No. 8-

40, 3er Piso, Bogota, Colombia, Tel: (57-1) 332-3400, Fax: (57-1) 332-

3400 Ext. 1265, Contact: Luis Felipe Henao Cardona, Viceministro

Costa Rica

Puntarenas City-Port: The objective is to help reactivate the local econ-

omy and improve the living conditions of Gran Puntarenas’ poor res-

idents by restoring the needed infrastructure and allied services and

strengthening local institutions. This project is on hold until further

notice. Environmental Assessment Category B. US$ 100.0 (IBRD).

Consultants will be required. Ministry of Finance, Avenida 2 entre

calle 1 y 3, Diagonal at Teatro Nacional, San Jose, Costa Rica. Munic-

ipality of Puntarenas



Dominican Republic

Public Administration, Law, and Justice

(R) Municipal Development (Ln. 78360-DO): The objective is to

strengthen twenty local governments in rural, economically disad-

vantaged regions and key national municipal support entities with in-

creased capacity in municipal planning, in the provision of basic

municipal services and in the allocation of municipal expenditures as

required by newly passed municipal laws. The loan was signed on 10



May 2010.

Environmental Assessment Category B. Project: P095863.

US$ 20.0 (IBRD). Consultants will be required. General Direction of

Territorial Regulation and Development, under National Planning

Agency, Avenida Cesar Nicolas Penson esq., calle Rosa Duart, Santo

Domingo, Dominican Republic, Tel: (809) 682-5170, Fax: (809) 689-9731,

E-mail: arq_labour1@hotmail.com, Contact: Franklin Labour, Director

General


El Salvador

Education

Sustaining Social Gains for Economic Recover y: The objective is

to support the Government’s policy reforms in critical areas to protect

the most vulnerable and ease its financing needs in the context of the

difficult external economic environment. Signing scheduled for 27

May 2010. Environmental Assessment Category U. Project: P118036.

US$ 100.0 (IBRD). Consultants will be required. Ministry of Finance,

Bulevar Los Heroes No. 1231, San Salvador, El Salvador Tel/Fax: (503-

22) 443-051, E-mail: rina.djarquin@mh.gob.sv, Contact: Rina Castel-

lanos de Jarqu, Directora Gral.de Inv y Cr.Pub

Health and Other Social Services

(R) Improving Health Sector Performance and Governance:

The objective is to: (i) support the GOES health strategy in expand-

ing the use of basic health care services among rural, remote and poor

populations; and (ii) strengthen the management of the public health

essential functions, and the accountability and performance of the na-

tional health care networks. Project Concept Review Meeting scheduled



for 1 June 2010.

Environmental Assessment Category B. US$ 80.0

(IBRD). Consultants will be required. Ministry of Health, Ministerio

de Salud, San Salvador, El Salvador, Tel: (503-2) 205-7332, Fax: (503-

2) 271-0008, Contact: Eduardo Espinoza, Viceministro de Policas de

Salud


PAGE 72

Monthly Operational Summary

JUNE 2010

Public Administration, Law, and Justice

(R) Fiscal Management and Public Sector Performance TAL (Ln.

78120-SV): The objective is to enhance government’s institutional ca-

pacities in the areas of public financial management in order to improve

efficiency, effectiveness and transparency of government’s budget

planning and implementation as well as to strengthen capacities of the

Ministry of Finance for a more effective and transparent fiscal man-

agement. Bank Approval completed on 24 November 2009. Signing ten-



tatively scheduled for early-June 2010.

Environmental Assessment

Category C. Project: P095314. US$ 20.0 (IBRD). No consultants are

required. Technical Secretariat of the Presidency, Alameda Manuel E.

Araujo No. 5500, San Salvador, El Salvador, Tel: (503) 248-9250, Con-

tact: Segovia Alexander, Technical Secretary of the Presidency



(R) Local Government Strengthening: The objective is to promote

integrated territorial development focused on increasing rural pro-

ductivity. Bank Approval scheduled for 1 June 2010. Environmental As-

sessment Category B. Project: P118026. US$ 80.0 (IBRD). Consultants

will be required. Subsecretariat of Territorial and Local Development,

Secretaria de Asuntos Estrategicos, Alameda Manuel Enrique Araujo

5500, San Salvador, El Salvador, Tel: (503) 224-9178, E-mail: gmo.gal-

van.bonilla@gmail.com, Contact: Guillermo Galvan, Subsecretary



Download 1.58 Mb.

Do'stlaringiz bilan baham:
1   ...   20   21   22   23   24   25   26   27   28




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling