The world bank monthly operational summary
(R) Mato Grosso do Sul State Road Transport (Ln. 78720-BR)
Download 1.58 Mb. Pdf ko'rish
|
(R) Mato Grosso do Sul State Road Transport (Ln. 78720-BR): The objectives are: (a) modernize the state fiscal administration, (b) improve the state capacity to protect biodiversity and manage natural resources in a sustainable fashion, and (c) increase capacity in the man- agement of transport public investment programs. Signing scheduled
Environmental Assessment Category B. Project: P118410. US$ 300.0 (IBRD). No consultants are required. Agencia Es- tadual de Gestao de Empreendimentos de Mato Grosso do Sul, Av. De- sembargador Jose Nunes da Cunha, Bloco 14, Gampo Grande, MS, Brazil, Tel: (55-67) 3318-5538, Fax: (55-67) 3318-5386, E-mail: coorde- nacao.pde@agesul.ms.gov.br, Contact: Juliana Pegolo, Project Coor- dinator
(R) Sao Paulo Metro Line 4-Phase 2 (Ln. 78690-BR): The ob- jective is to improve the quality of service provided to the urban trans- port users in the area of influence of the new Line 4 stations and facilitate the integration between metro and bus at those stations. Bank Approval completed on 4 May 2010. Signing scheduled for 15 June 2010. Environmental Assessment Category A. Project: P106390. US$ 130.0/130.0 (IBRD/JBIC). Consultants will be required to assist in the preparation of bidding documents and to review detailed engi- neering designs Companhia do Metropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291- 5494, Fax: (55-11) 3291-2890, E-mail: egranado@metrosp.com.br, Con- tact: Ernesto Granado, Coordinator PMU (R) Sao Paulo Metro Line 5 (Ln. 78550-BR): The objective is to improve mobility for public transport users in the Capão Redondo-Largo Treze-Chácara Klabin corridor in a cost-efficient and environmentally friendly way. Bank Approval completed on 20 April 2010. Signing sched- uled for 30 June 2010. Awaiting Senate approval. Environmental As- sessment Category A. Project: P116170. US$ 650.4/481.0 (IBRD/IADB). Consultants will be required for assessment of train and systems spec- ifications, project management and supervision Companhia do Met- ropolitano de Sao Paulo, Rua Boa Vista 175, Bloco B-6o Andar, Sao Paulo, SP, Brazil, Tel: (55-11) 3291-5494, Fax: (55-11) 3291-2890, E-mail: egranado@metrosp.com.br, Contact: Ernesto Granado, Coordinator PMU
jective is to scale up support to the State in improving the efficiency of the paved municipal road network. Negotiations pending authoriza-
Environmental Assessment Category B. Pro- ject: P118077. US$ 326.8 (IBRD). Consultants will be required for local and international consultancy for Project Preparation, notably on high- PAGE 70 Monthly Operational Summary JUNE 2010 JUNE 2010 Monthly Operational Summary PAGE 71 way engineering. Departamento de Estradas de rodagem do Estado de Sao Paulo (DER/SP), Avenida do Estado 777, 3o Andar, Ponte Pe- quena, Sao Paulo, SP, Brazil, Tel: (55-11) 3311-1401, Fax: (55-11) 3311- 0973, E-mail: delson@sp.gov.br, Contact: Delson Jose Amador, Superintendente (R) Sao Paulo Trains and Signaling Additional Financing: The objective is to continue to improve the quality of service offered to SPMR users by acquiring additional 9 trains for Line 11 of the São Paulo sub- urban railway (CPTM). Negotiations scheduled for 30 June 2010. En- vironmental Assessment Category B. Project: P117122. US$ 112.9 (IBRD). Consultants will be required for project management and su- pervision/reception of trains. Companhia Paulista de Trens Metro- politanos, Rua Boavista, 185-2 Andar BI. A, Centro Sao Paulo, Sao Paulo, SP, Brazil, Tel: (55-11) 3101-7141, E-mail: eduardo.graziano@cptm. sp.gov.br, Contact: Eduardo Graziano, Coordinator UGP (R) Tocantins Integrated Sustainable Regional Development: The objective is to contribute to stimulate a poised and sustainable eco- nomic growth of the State of Tocantins by improving accessibility of the population, territories and productive systems to services, re- sources and markets, while ensuring sustainable use of natural re- sources and the protection of fragile ecosystems. Identification scheduled for 2 June 2010. Environmental Assessment Category A. US$ 300.0 (IBRD). Consulting services to be determined. Implementing agency(ies) to be determined. Water, Sanitation and Flood Protection (R) Bahia Integrated Health and Water Management SWAp: The objective is to assist the State of Bahia in the promotion of equi- table social development through an increase in access to WSS, both in terms of quantity and quality, and through actions aimed at the re- duction of maternal and neonatal mortality rates. Decision Meeting
En-
vironmental Assessment Categor y B. Project: P095171. US$ 60.0 (IBRD). Consultants will be required. State of Bahia, Av. Luís Viana Filho 400, 4o Andar, Centro Administrativo, Salvador, BA, Brazil, Tel: (55-71) 3115-3550, Fax: (55-71) 3371-3237, Contact: Jorge Jose Santos Pereira Solla, Secretario de Estado de Saude
The objective is to reduce regional inequalities and ensure quality of water resources in the Federal District and Brasilia Metropolitan Re- gion through environmental planning and management activities, poverty reduction interventions and environmental rehabilitation in the most critical river basins. Project is on hold until further notice. Envi- ronmental Assessment Category A. US$ 57.6 (IBRD). Consulting ser- vices and implementing agency(ies) to be determined. (R) Integrated Solid Waste Management and Carbon Finance: The objective is to scale-up public and private investments in munici- pal solid waste management treatment and disposal, while ensuring financial and technical viability and reducing environmental and social impacts. Negotiations scheduled for 2 June 2010. Environmental As- sessment Category F. Project: P106702. US$ 50.0 (IBRD). Consultants will be required during implementation, and to assist public sector in preparing solid waste and carbon finance projects, including feasibil- ity studies, environmental assessments, technical and financial analy- sis, institutionasl framework and propose cost recovery mechanisms. Caixa Economica Federal, SBS Quadra 4 Lotes 3/4, Ed. Matriz I, 11 Andar-GEAIN, Brasilia, Brazil, Tel: (55-61) 3206-4911, E-mail: gesan@ caixa.gov.br, Contact: Adailton Ferreira Trindade, Gerente Nacional
Environmental Assessment Category B. Project: P106703. US$ 64.5 (IBRD). Consultants will be required for assistance to the State Secretariat of Water and Energy to manage and verify results during implementation. Secretaria de Estado de Saneamento e Energia, Rua Bela Cintra 847, 14o Andar, Bairro Con- solacao, Sao Paulo, SP, Brazil, Tel: (55-11) 3218-5500, E-mail: dilmape- na@sp.gov.br, Contact: Ms. Dilma Pena, Secretaria Sergipe Water: The objective is to promote efficient and sustainable water use in targeted municipalities of the Sergipe river basin, by im- proving water resources management and regulatory tools, reducing the pollution load discharged into rivers and increasing water services productivity. Decision Meeting scheduled for 28 May 2010. Environ- mental Assessment Category A. Project: P112074. US$ 70.3 (IBRD). Consultants will required to: (a) prepare environmental and social as- sessments, economic and financial assessments, development of pro- ject operation manual, irrigation services assessments, utility corporate reform and non-revenue water program; and (b) implementation. State Secretariat of Environment and Water Resources - Sergipe, Av. Prefeito Heraclito Rollemberg, S/N, Sergipe, Brazil, Tel: (55-79) 3179-7300, Fax: (55-79) 3179-7302, Contact: Ailton Francisco da Rocha, Project Co- ordinator Chile Energy and Mining (R) Climate Change and Energy: The objective is to support energy efficiency, renewable energy and other clean technologies that would reduce emissions of greenhouse gases. Project Concept Review Meet- ing scheduled for 20 September 2010. Environmental Assessment Cat- egory B. US$ 50.0 (IBRD). Consultants will be required. Implementing agency(ies) to be determined. Public Administration, Law, and Justice Social Protection Technical Assistance Additional Financing: The objectives are to support the efforts of the Government to im- plement Chile Solidario and lay the foundation of a national system of social protection. Additional resources are needed to implement ad- ditional activities to scale up the project’s impact and development ef- fectiveness. Bank Approval completed on 29 October 2009. Signing pending clearance from Treasury Department. Environmental As- sessment Category C. Project: P114774. US$ 3.0 (IBRD). Consultants will be required. Ministry of Finance, Teatinos 120, Santiago, Chile, Tel: (56-2) 675-1702/1727, E-mail: xserqueira@mideplan.cl, Contact: Xi- mena Serqueira, Coordinadora de Implementacion Administrativa del
objective is to finance the recovery and damage assessment of Chile after the February 27, 2010 (8.8 magnitude) earthquake. This project
Environmental Assessment Category B. US$ 500.0 (IBRD). No consultants are required. Implementing agen- cy(ies) to be determined. Colombia Agriculture, Fishing, and Forestry (R) Mainstreaming Sustainable Cattle Ranching: The objective is to reduce the impacts of cattle ranching on globally significant biodi- versity and land degradation by making cattle ranching incentives and programs more land-use sustainable and biodiversity friendly. The loan was signed on 6 April 2010. Environmental Assessment Cate- gory B. Project: P104687. US$ 7.0 (GEFU). Consultants will be re- quired. Federacion Nacional de Ganaderos, Calle 37 No. 14-35, Bogota, Colombia, Tel: (57-1) 578-2020 Ext. 259, E-mail: cosorio@fedegan.org.co, Contact: Carlos Osorio, Director Ciencia y Technologia (R) National Protected Areas Additional Financing: The objective is to promote the consolidation and long-term sustainability of Colom- bia’s National Protected Areas System (NPAS) through designing and implementing a Protected Areas Conservation Trust Fund. Decision Meeting scheduled for 9 August 2010. Environmental Assessment Category B. Project: P112106. US$ 4.0 (GEFU). Consultants will be re- quired. Patrimonio Natural, Calle 72 No. 10-70, Edificio Centro Avenida Chile, Torre A, Bogota, Colombia, Tel: (57-1) 211-5545, E-mail: agalan@patrimonionatural.org.co, Contact: Alberto Galan, Director
progress made in the establishment of a diversified agricultural inno- vation system and in the strengthening of Colombia’s sanitary and phy- tosanitary systems. In addition, it will establish novel ways for technical assistance to agriculture producers. Project Concept Review Meeting scheduled for 25 June 2010. Environmental Assessment Category B. US$ 30.0 (IBRD). Consultants will be required. Ministry of Agriculture,
Av. Jimenez 7-65, Colombia, Tel: (57-1) 341-9005, Fax: (57-1) 284-1775, E-mail: claudia.uribe@minagricultura.gov.co, Contact: Claudia Uribe, Coordinadora del PTA
port: (a) the planned institutional transformation of Instituto Colom- biano para el Fomento de la Educacion Superior (ICFES) from a public entity to a semi public entity; and (b) technical and institutional capacity of ICFES to analyze, monitor and report student assessments. Deci-
Environmental As- sessment Category C. Project: P106693. US$ 13.2 (IBRD). Consultants will be required. Instituto Colombiano para el Fomento de la Educa- cion Superior, Margarita Pe, Director, Colombia, Tel: (57-1) 341-228, E-mail: mpena@ices.org, Contact: Margarita Pena, Directora (R) Science, Technology and Innovation: The objective is to include activities supporting the implementation of the recently approved sec- tor policy for Science, Technology and Innovation by the Government of Colombia. Appraisal completed on 23 April 2010. Negotiations sched- uled for 24 May 2010. Environmental Assessment Category B. Project: P117590. US$ 25.0 (IBRD). Consultants will be required. Colombian Institute for the Development of Science and Technology (COL- CIENCIAS), Transversal 9 A Bis 132 28, Bogota, Colombia, Tel: (57- 1) 1625 8480, E-mail: jfmiranda@colciencias.gov.co, Contact: Juan Francisco Miranda, Director General
proving access to quality early childhood development services. Pro- ject Concept Review Meeting scheduled for 30 September 2010. Environmental Assessment Category B. US$ 40.0 (IBRD). Consul- tants will be required. Implementing agency(ies) to be determined.
tive is to ensure sustained progress through technical assistance and investment in three of the four thematic areas of the original loan: (i) environmental health: outdoor air quality and a hand washing campaign, (ii) integrated water resources management, and (iii) planning and over- sight of environmental management. Preparation completed on 25 March 2010. Decision Meeting scheduled for 27 September 2010. Environ-
mental Assessment Category C. US$ 10.0 (IBRD). Consultants will be required. Ministry of Environment and National Planning Depart- ment, Calle 37 No. 8-40, Bogota, Colombia, Tel: (57-1) 332-3400, Ext. 1194, Fax: (57-1) 332-3429, E-mail: lnino@minambiente.gov.co, Contact: Lucy Amparo Nino Carrillo, Coordinadora de Banca Multilateral
The objective is to deliver high quality and sustainable BRTS in selected medium and large cities to improve mobility along the most strategic mass transit corridors; improve accessibility for the poor through feeder services and fare integration; and build greater institutional ca- pacity at the national and local level. Project Concept Review Meeting scheduled for 28 June 2010. Environmental Assessment Category B.
Consultants will be required. Ministry of Trans- port, Av. El Dorado CAN, Colombia, Tel: (57-1) 324-0800, E-mail: min- trans@mintransporte.gov.co, Contact: Carolina Camacho, Coordinadora Sistemas Integrados de Transporte
transform the Rio Bogotá from an environmental liability into an ur- ban set for the metropolitan region by improving water quality, re- ducing flood risk, and creating a series of multi-functional parks along the river. Negotiations scheduled for 20 May 2010. Environmental As- sessment Category A. Project: P111479. US$ 250.0 (IBRD). Consultants will be required. Corporacion Autonoma Regional de Cundinamarca, Carrera 7 No. 36-45, Bogota, Colombia Tel/Fax: (57-1) 320-900 Ext. 1400, E-mail: jplata@car.gov.co, Contact: Garcia Jorge Plata, Project Manager
Risk Reduction Investments; (b) institutional strengthening of mu- nicipal government; and (c) resettlement of people in high risk areas, and compensation for involuntary loss of land. Project Concept Review Meeting scheduled for 2 November 2010. Environmental Assessment Category A. US$ 150.0 (IBRD). Consultants will be required. Secre- tariat of Plannig District of Barranquilla, Calle 34 No. 43-31, Colombia, Tel: (57-317) 641-7757, E-mail: mabuchaibe@barranquilla.gov.co, Con- tact: Maria Elia Abuchaibe, Secretary of Planning
tives are: (a) to increase access to affordable land and housing solu- tions for over 200,000 households; and (b) to develop and pilot approaches to access capital markets to finance the program as a means to reduce and ultimately eliminate in the medium-term the need for public financing of infrastructure. Negotiations scheduled for 15 June 2010. Environmental Assessment Category B. Project: P110671. US$ 40.0 (IBRD). Consultants will be required. Ministry of Environment, Housing, and Territorial Development, Calle 37 No. 8- 40, 3er Piso, Bogota, Colombia, Tel: (57-1) 332-3400, Fax: (57-1) 332- 3400 Ext. 1265, Contact: Luis Felipe Henao Cardona, Viceministro
omy and improve the living conditions of Gran Puntarenas’ poor res- idents by restoring the needed infrastructure and allied services and strengthening local institutions. This project is on hold until further notice. Environmental Assessment Category B. US$ 100.0 (IBRD). Consultants will be required. Ministry of Finance, Avenida 2 entre calle 1 y 3, Diagonal at Teatro Nacional, San Jose, Costa Rica. Munic- ipality of Puntarenas Dominican Republic Public Administration, Law, and Justice (R) Municipal Development (Ln. 78360-DO): The objective is to strengthen twenty local governments in rural, economically disad- vantaged regions and key national municipal support entities with in- creased capacity in municipal planning, in the provision of basic municipal services and in the allocation of municipal expenditures as required by newly passed municipal laws. The loan was signed on 10 May 2010. Environmental Assessment Category B. Project: P095863. US$ 20.0 (IBRD). Consultants will be required. General Direction of Territorial Regulation and Development, under National Planning Agency, Avenida Cesar Nicolas Penson esq., calle Rosa Duart, Santo Domingo, Dominican Republic, Tel: (809) 682-5170, Fax: (809) 689-9731, E-mail: arq_labour1@hotmail.com, Contact: Franklin Labour, Director General
El Salvador Education Sustaining Social Gains for Economic Recover y: The objective is to support the Government’s policy reforms in critical areas to protect the most vulnerable and ease its financing needs in the context of the difficult external economic environment. Signing scheduled for 27 May 2010. Environmental Assessment Category U. Project: P118036. US$ 100.0 (IBRD). Consultants will be required. Ministry of Finance, Bulevar Los Heroes No. 1231, San Salvador, El Salvador Tel/Fax: (503- 22) 443-051, E-mail: rina.djarquin@mh.gob.sv, Contact: Rina Castel- lanos de Jarqu, Directora Gral.de Inv y Cr.Pub
The objective is to: (i) support the GOES health strategy in expand- ing the use of basic health care services among rural, remote and poor populations; and (ii) strengthen the management of the public health essential functions, and the accountability and performance of the na- tional health care networks. Project Concept Review Meeting scheduled for 1 June 2010. Environmental Assessment Category B. US$ 80.0 (IBRD). Consultants will be required. Ministry of Health, Ministerio de Salud, San Salvador, El Salvador, Tel: (503-2) 205-7332, Fax: (503- 2) 271-0008, Contact: Eduardo Espinoza, Viceministro de Policas de Salud
PAGE 72 Monthly Operational Summary JUNE 2010 Public Administration, Law, and Justice (R) Fiscal Management and Public Sector Performance TAL (Ln. 78120-SV): The objective is to enhance government’s institutional ca- pacities in the areas of public financial management in order to improve efficiency, effectiveness and transparency of government’s budget planning and implementation as well as to strengthen capacities of the Ministry of Finance for a more effective and transparent fiscal man- agement. Bank Approval completed on 24 November 2009. Signing ten- tatively scheduled for early-June 2010. Environmental Assessment Category C. Project: P095314. US$ 20.0 (IBRD). No consultants are required. Technical Secretariat of the Presidency, Alameda Manuel E. Araujo No. 5500, San Salvador, El Salvador, Tel: (503) 248-9250, Con- tact: Segovia Alexander, Technical Secretary of the Presidency (R) Local Government Strengthening: The objective is to promote integrated territorial development focused on increasing rural pro- ductivity. Bank Approval scheduled for 1 June 2010. Environmental As- sessment Category B. Project: P118026. US$ 80.0 (IBRD). Consultants will be required. Subsecretariat of Territorial and Local Development, Secretaria de Asuntos Estrategicos, Alameda Manuel Enrique Araujo 5500, San Salvador, El Salvador, Tel: (503) 224-9178, E-mail: gmo.gal- van.bonilla@gmail.com, Contact: Guillermo Galvan, Subsecretary Download 1.58 Mb. Do'stlaringiz bilan baham: |
ma'muriyatiga murojaat qiling