Water supply systems and networks


Download 0.56 Mb.
Pdf ko'rish
Sana16.04.2023
Hajmi0.56 Mb.
#1361550
Bog'liq
3- pupm lecture



OPERATIONAL 
RELIABILIT Y OF PUMPING 
STATIONS, DESIGN OF 
PUMPING STATIONS 
ACCORDING TO THE 
PURPOSE OF USE  


PLAN 
1. Pump units. 


The pump station includes the following facilities and devices 
include: water intake facility,
water transfer facility, 
avan camera,
water intake facility, 
suction pipes,
pump station building, 
pressure pipes,
water outlet,
pressure tank, drainage channel. 


The water intake facility is constructed to guarantee the 
water consumption to the pump. This structure is provided 
by zatvors.In addition, devices that do not transfer 
discharge and fish to pumps can also be envisaged in the 
water intake facility. 
The water transmission structure can be in the form of 
an open channel or a closed pipe. This structure will be 
built as part of stations operating according to the 
derivation scheme. The dimensions of the water transfer 
facility are assigned on the basis of hydraulic calculations. 


Avankamer water transmission system with water 
intake system is a connecting part. The water intake 
facility is usually from the water transfer facility will be 
wider and deeper. 
The pump station building consists of the main 
working areas and service rooms is organized. It 
includes pumps, motors, power transmission devices, 
control panel, lifting cranes and the like are located. 


Cross section of the pump station building: 
1 – suction pipe, 2 - pumps, 3 - lock, 4 - reverse valve,
5 - pressure pipe, 6 – load lifting crane 


Pressure (driving) pipes pumps with water discharge 
facilityconnects. Also with locks and reverse valves in 
pressure pipesmust be provided. 
The main function of the water outlet is the pressure pipe 
coming outto ensure that a minimum napor loss is 
achieved when transmitting the stream to the upper 
byefwell the back of the water in the pressure. Basin 
when the pump unit stops workingthis is to prevent 
(pumps to the side) from returning sharply. 


Pressure basin with drainage system 
connects. 
The location schemes of the pumping 
station are based on the geological, 
hydrogeological, hydrological and topographic 
conditions, technical and economic solutions 
and may vary depending on other factors 


 Derivative scheme pumping station the building will be built as close as 
possible to the irrigation field. (pressure to reduce the length of the pipes) 


Industrial and domestic wastewater, atmospheric water 
and precipitation (turbid) it could not flow to the 
treatment stations due to the local relief 
In some cases, sewage pumping stations will be built.. 
Production enterprises of sewage pumping stations (food 
except for industry), to free areas near warehouses, or 
it is advisable to build in greened arrays. 


Sanitariya shartlari bo‘yicha nasos stansiyalarni turar joy va jamoatchilik 
binolaridan 20–30 m uzoq masofada bo‘lgan alohida binolarda joylashtirish zarur. 
Agar bo‘sh hudud bo‘lmasa, oradagi masofa Davlat sanitariya qo‘mitasi bilan 
kelishilgan holda kamaytiriladi. 
Nasos stansiya hududi perimetri bo‘yicha eni 10 m kam bo‘lmagan 
himoyako‘kalamlashtirish zonasini qurish zarur. Atmosfera suvlarini xaydovchi 
nasos stansiyalarini rostlovchi hajm sifatida ishlatish mumkin bo‘lgan suv xavzalari 
yonida qurish mumkin. Kanalizatsiya nasos stansiyalari qurilish joylarini mahalliy 
sanitar-nazorat organlari va suv xo‘jaligi Vazirligi bilan kelishilgan holda 
tanlanadi.


Kanalizatsiya nasos stansiyalarining tasnifi, tuzilish 
sxemalari 
Haydalayotgan suyuqlik turiga qarab kanalizatsiya nasos 
stansiyalari 4 guruhga bo‘linadi: 
1. Maishiy oqova suvlarni haydash uchun; 
2. Sanoat oqova suvlarini haydash uchun; 
3. Atmosfera suvlarini haydash uchun; 
4. Cho‘kmalarni haydash uchun