Car project for Drinking Water Supply and Sanitation in Three Divisional Headquarters and Surrounding Rural Areas Appraisal Report


Download 403.54 Kb.
Pdf ko'rish
bet9/23
Sana07.01.2023
Hajmi403.54 Kb.
#1083312
1   ...   5   6   7   8   9   10   11   12   ...   23
Bog'liq
Central African Republic - Project for Drinking Water Supply and Sanitation in three Divisional Headquarters and Surrounding Rural Areas

Infrastructure Development 
The infrastructure development component has been divided into 
four 
sub-components: 
• 
Drinking water supply: rehabilitation and extension of the drinking 
water supply networks in Berberati, Bouar and Bossangoa, including 
water production, storage and distribution. 
• 
Sanitation: construction of 73 blocks of latrines in schools, health 
centres, markets, motor parks and prisons. 
• 
Environment: protection of the spring in Berberati and the catchment 
area in Bouar; project environmental and social monitoring. 
• 
Construction of 46 hand-operated pump (HOP) boreholes and two 
standalone water points (SWPs) in 43 surrounding villages and 34 
simplified networks in 34 other villages. 
• 
Works supervision and control: this sub-component covers all 
drinking water supply, sanitation and environmental works. 
B Institutional 
support
UA 1.198 million 
Institutional Support 
The institutional support component has been divided into six sub-
components as follows: 
• 
Support to the DGH at the central level: construction of offices 
and a water analysis laboratory, provision of office furniture, 
computer hardware and office automation equipment, vehicles, 
staff training and procurement support 
• 
Support to the DGH at the regional level: rehabilitation of offices 
in Bouar and Bossangoa, provision of office furniture, computer 
hardware, office automation equipment and staff training 
• 
Support to SODECA agencies: rehabilitation of offices, provision 
of office furniture, computer hardware and office automation 
equipment, vehicles and staff training; 
• Support to Municipal Councils: provision of office furniture, 
computer hardware and office automation equipment, and staff 
training; 
• Health system support: provision of computer hardware and office 
automation equipment, water analysis laboratory equipment and 
vehicles, and staff training; 

Project 
management

Download 403.54 Kb.

Do'stlaringiz bilan baham:
1   ...   5   6   7   8   9   10   11   12   ...   23




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling