Die Anschläge in New York und Washington am 11


Download 2.09 Mb.
Pdf ko'rish
bet46/74
Sana31.08.2023
Hajmi2.09 Mb.
#1671849
1   ...   42   43   44   45   46   47   48   49   ...   74
Bog'liq
9266 2967ProtectionofCriticalInfrastruct

Yes
No
Plan-
ned
Action required/ 
measures
Location of the premises concerned 
Can a threat to the company through severe 
natural events be ruled out? 
Flooding 
Storm tides 
Earthquakes 
Earthslides and hillside landslides 
Avalanches 
Storms 
... 
Is the area surrounding the company clearly 
structured and is the distance to neighbouring 
buildings sufficient in order to detect illegal 
entries (open-plan building)? 
If not, is the company shielded against 
neighbouring external buildings in such a way 
that it is difficult for intruders to gain 
unauthorised entry (e.g. via neighbouring roofs) 
(closed design)? 
4
The inner perimeter  is the area between the site boundary and the building boundary. 


- 58 - 
Yes
No
Plan-
ned
Action required/ 
measures
Structural design 
Are the company premises well-developed for 
traffic purposes and do they have a main exit 
and an emergency exit or exits which is/are 
independent of the main exit?
Is the building protected against unlawful and 
possibly forced entry by means of structural 
elements? 
Bollards 
Concrete elements 
Barriers 
... 
Are there public parking spaces outside the 
premises (public area)? 
If so, is the distance from the buildings to be 
protected sufficient? 
Are parts of buildings to be protected situated 
outside of exposed locations and especially 
endangered areas? 
Are building frontages smooth and without 
projections? 
Are lightning conductors and other attachments 
designed in such a way that they cannot be 
used as climbing aids? 
Are rainwater pipes concealed under plaster or 
facing? 


- 59 - 

Download 2.09 Mb.

Do'stlaringiz bilan baham:
1   ...   42   43   44   45   46   47   48   49   ...   74




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling