Dzhankeldy Wind Power Project
Objectives of the ESIA
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
1.3
Objectives of the ESIA The objectives of this ESIA in relation to this project include the following: Provide an overview of the Project design, identification of sensitive receptors in the Project’s area of influence and assessment of Project alternatives Assessment of baseline conditions prior to the development of the Project through review of available data and conducting surveys; Assessment of the project’s environmental & social impacts for the construction and operational phases; Review of compliance obligations, including applicable Uzbekistan regulations and international regulations & standards as well as international lender requirements ; Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 6 To engage with key stakeholders and project affected people to disclose Project information, study outcomes, gain lay knowledge about the local environmental & social context, seek feedback on proposal and to understand & map any resettlement requirements. Determination of applicable mitigation and management measures including monitoring requirements to be implemented in order to avoid or minimise potential impacts and maximise potential environmental and social gains; Consideration of alternatives that can be used for the project leading to reduced impacts and/or greater social and environmental gains. Prepare a framework from which the construction phase and operational phase respective environmental & social management systems and plans can be developed and implemented. 1.4 Structure of the ESIA This ESIA is presented in the following format: Volume 1: Non-Technical Summary Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling