Dzhankeldy Wind Power Project
Implementing Mitigation: Planning, Management and
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
7.4
Implementing Mitigation: Planning, Management and Monitoring The mitigation measures applied to reduce significant impacts will require a number of management plans to detail the implementation and action items needed as well as monitoring and reporting requirements to ensure compliance and measure performance. 7.4.1 Design The following outline the mitigation requirements during design phase: Integration of design mitigation into WTG design related to lighting design and specifications, painting specifications, and exclusion of roosting and perching opportunities. 7.4.2 Pre-Construction The following outline the mitigation requirements pre-construction: Review of Construction Methodology and Schedule by environmental consultant, especially in regards to: Site Clearance and Layout Timing and method of emissions-generating works Lighting Strategy Solid Waste Management Strategy Preparation of Biodiversity Action Plan, inclusive of Species- specific Action Plans which outlines the CHA process, findings and illustriates the pathway to no-net loss Preparation of Reptile Relocation Methodology Preparation of Flora Conservation Action Plan Preparation of Breeding Bird Protection Plan Carry out preconstruction surveys and implementation of actions as per the above plans Preparation of CEMP, inclusive of: General Site Controls Solid Waste Control Plan Chance Find Procedure Air Quality Control Plan Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 283 Dust Control Plan Noise Control Plan Lighting Control Plan Hazardous Materials Control Plan Emergency Action Plans Spill Prevention and Clean-up Procedures 7.4.3 Construction The following outline the mitigation requirements during construction: The EPC will employ a full-time site-based Ecologist and, during active periods, a Herpetologist, to ensure that ecology related measures are understood and fully implemented. Implementation of CEMP Daily Checklist Weekly Inspection Monthly Reporting Quarterly Auditing Biodiversity Monitoring and Evaluation Programme BMEP for ongoing monitoring of translocation/relocation success, chance find procedures, target species impacts, etc. 7.4.4 Post Construction The following outline the mitigation requirements post-construction: Preparation of Restoration Action Plan Carrying out restoration works Post-restoration survey Compensation Offset Plan (for Habitat & Flora) Habitat restoration offset works Biodiversity Monitoring and Evaluation Programme BMEP 7.4.5 Operation The following outline the mitigation requirements during operation: Preparation and Implementation of OEMP, inclusive of: General Site Controls Noise Control Plan Lighting Control Plan Chance Find Procedure Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 284 Fatality Monitoring Plan Collision Risk Management Plan which includes PBR thresholds, proposed SDOD mechanism and Cut-in Curtailment criteria. Compensation Offset Plan (for Birds & Bats). Compliance checks and reporting include: Daily Checklist Weekly Inspection Monthly Reporting Quarterly Auditing Biodiversity Monitoring and Evaluation Programme BMEP Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling