Dzhankeldy Wind Power Project
Download 6.64 Mb. Pdf ko'rish
|
56086-001-esia-en
"O
N P ROTECTION AND U SE OF THE W ILDLIFE " (1997) AS AMENDED IN 2016 This law regulates the use, protection, reproduction and restoration of wildlife in order to promote conservation and ensure diversity of species in their natural habitat. Other laws and regulations include: The Law of the Republic of Uzbekistan “On Protection and Use of Vegetation” (1997) as amended in 2016. The Resolutions of Cabinet of Ministers of the Republic of Uzbekistan: No. 290 of 20.10.2014 "About the settlement of use of biological resources and about the procedure for passing of allowing procedures in the field of environmental management" (as amended on 26.12.2020) Regulations on procedure for use of objects of flora and passing of allowing procedures in the field of use of flora objects Sets out the requirements to obtain permission to cut wood and shrub plantations that are in the zone of the construction site. Regulations on procedure for use of objects of fauna and passing of allowing procedures in the field of use of fauna objects; Regulations on procedure for passing of allowing procedures in the field of international trade in the types of wild fauna and flora which are under the threat of disappearance in the territory of the Republic of Uzbekistan Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 126 Regulations on procedure for distribution of the means received as payment for use of objects of animal and flora, the penal amounts, and the amounts collected from violators of the nature protection legislation for the caused damage. No. 255 of 31.03.2018 "On approval of some administrative regulations of state services in the sphere of nature management", which establishes the procedure for issuing permits for cutting trees and shrubs that are not included in the state forestry fund, to legal entities and individuals; No. 43 of 17.01.2019 "On measures to further improve the procedure for streamlining the use of trees and shrubs not included in the state forest fund, as well as the issuance of permits in their use" which establishes the amounts of fees for cutting trees and shrubs not included to the state forestry fund. However, it states that cutting of trees and shrubs, during construction works financed from the state budget, loans and grants of foreign and international organizations or investments of international financial institutions, as well as to perform activities established by decrees and orders of the President and the government of RUz are made on the basis of conclusion of the SCEEP and permit issued by local public administration and are exempt from the established fees as an exception; No. 484 of 11.06.2019 “On approval of the strategy for the conservation of biodiversity in the Republic of Uzbekistan for the period 2019- 2028”. The strategy involves the creation of a unified system for monitoring components of biodiversity with a central element - the reference ecosystems of state reserves; unified information database of state monitoring and state cadastre of biodiversity based on modern geo-information technologies (GIS technologies). No. 93 of 18.02.2020 "On additional measures to conserve valuable varieties of trees and shrubs not included in the state forest fund". It approves the list of valuable tree and shrub species not included in the state forest fund, for the cutting of which a moratorium is established until December 31, 2021, according to the Presidential Decree No. 6155 dated 03.02.2021 5.1.2 Lender Requirements EBRD The EBRD PR6 on Biodiversity Conservation and Sustainable Management of Living Natural Resources establishes general requirements for the conservation of biodiversity and sustainable management of living natural resources covering aspects such as the assessment of risks and impacts and protection and conservation of biodiversity. Biodiversity baseline studies must be undertaken to understand the existing biodiversity and ecosystem services in the area that may be affected by the project. Where applicable, the Project will intend to follow the targets set out by the EU Biodiversity Strategy including the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC and the EU Regulation 1143/2014 on Invasive Alien Species. Baseline studies will describe the general ecological context and provide additional focused information on ecological features and processes confirmed to occur in the study area. Dzhankeldy 500MW Wind Farm ESIA Volume 2- Main Text, Tables & Figures 127 Baseline studies will conclude with a critical habitat assessment to determine if any features in the project area qualify as priority biodiversity features or critical habitat. This assessment answers the basic question, “how important is the study area for conservation and what PR6 requirements will apply?” and does not consider specific impacts at this stage of analysis. PR6 defines critical habitat and priority biodiversity features as: Download 6.64 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling