Edition 2020 Ninth edition
Download 1.74 Mb. Pdf ko'rish
|
a6048c931cdc93 TEGOVA EVS 2020 digital
(see Annex)
ANNEX EXAMPLES OF AUTOMATIC RENOVATION OBLIGATIONS Taken from the national Long-term Renovation Strategies submitted to the European Commission by 1 October 2020 98 Annex - Examples of automatic renovation obligations European Valuation Standards 2020 BELGIUM BRUSSELS CAPITAL REGION • Residential New EPC: No more three recommendations for works. Instead, indication of the tech- nical measures to be implemented in order to achieve the overall energy performance objective set (by type) by the Brussels Capital Region. A renovation plan will be produced for the work and will be mandatory in the case of planning permission requiring the assistance of an architect. It will be produced by an architect. Energy efficiency renovation work to be carried out in five stages to achieve a minimum performance level by 2050. This minimum level will be defined by type. Owners will choose the measures to be carried out from among the priority measures recommend- ed by the EPC. By each deadline set by the legislation, owners must prove that the work has been correctly carried out. Housing that does not meet energy efficiency and health criteria and/or a minimum level of energy performance will not be rentable. • Non-residential Mandatory system of work to be carried out by certain deadlines, similar to the system established for the residential sector. FLANDERS • Residential Updated EPC provides specific advice with a roadmap including indication of the cost price for single-family dwellings to enable the dwelling to progress towards the 2050 ob- jective. "The indication of the renovation cost offers neutral arguments to potential buyers to negotiate the sale price". EPC for common parts of an apartment building. European Valuation Standards 2020 Annex - Examples of automatic renovation obligations 99 Gradual tightening-up of the standards of the Flemish Housing Code concerning the maximum EPC figure, taking into account the benchmarks of the long-term objective for 2050. • Non-residential Mandatory renovation after transfer of ownership: From 2021 the building must undergo deep energy renovation within no more than five years of a notarial deed of transfer of full ownership. Specific approach under preparation. Mandatory minimum energy performance from 2030: From 2030, these buildings must achieve a minimum energy performance to an EPC level still to be defined. CYPRUS As of 1 July 2020, all residential buildings undergoing major renovation must be of energy class A, and all other buildings are to be of energy class B+. Download 1.74 Mb. Do'stlaringiz bilan baham: |
Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©fayllar.org 2024
ma'muriyatiga murojaat qiling
ma'muriyatiga murojaat qiling